Mounthly Weekly Report Project

advertisement
PROJECT NAME
LAPORAN
PELAKSANAAN PEKERJAAN BULANAN / MINGGUAN
PEKERJAAN
LOKASI
NO. KONTRAK
TGL. KONTRAK
TAHUN ANGGARAN
NO
1
:
:
:
:
:
KONTRAKTOR PELAKSANA
MINGGU
PERIODE
PROGRESS S.D SAAT INI
VOLUME
URAIAN PEKERJAAN
KONTRAK
2
3
NILAI KONTRAK
SAT
4
HARGA SATUAN
JUMLAH
(Rp)
HARGA (Rp)
5
6
S.D BULAN LALU
BOBOT (%)
VOL
7
8
JUMLAH
HARGA (Rp)
9
:
:
:
%
BULAN INI
BOBOT (%)
VOL
10
11
S.D BULAN INI
JUMLAH
BOBOT
HARGA (Rp)
(%)
12
13
VOL
14
JUMLAH
BOBOT
HARGA (Rp)
(%)
15
16
BOBOT TERHADAP
KESELURUHAN (%)
17
I.
Sub Jumlah
-
-
-
-
-
-
Sub Jumlah
-
-
-
-
-
-
Sub Jumlah
-
-
-
-
-
-
JUMLAH HARGA DAN BOBOT
-
-
-
-
-
-
II.
III.
Disetujui Oleh,
PPN 11%
-
-
-
-
TOTAL KESELURUHAN
-
-
-
-
DIBULATKAN
-
-
-
-
Diperiksa Oleh,
Dibuat Oleh,
Pengawas Lapangan
Kontraktor Pelaksana
YUSWADI, ST