Uploaded by jrosefay.amat001

MONITORING & EVALUATION

advertisement
IV - Monitoring and Evaluation
The conduct of monitoring and evaluation will be done quarterly by the school monitoring team and division monitoring and evaluation team.
SCHEDULED DATES OF MONITORING
1st Quarter:
2nd Quarter:
3rd Quarter:
4th Quarter:
JANUARY 2021- MARCH 2021
APRIL 2021- JUNE 2021
JULY 2021- SEPTEMBER 2021
OCTOBER 2021- DECEMBER 2021
(1)
(2)
Name of Project
Project Objectives and
Targets
A. ACCESS
A.1. FACILITATE ACCESS
ON PUPILS (FAP)
Increase enrollment rate to
at least 2% every school
year from 2022-2024
(3)
(4)
(5)
(6)
Date of
Accomplishments/ Issues/Problems/ Recommendations/
Monitoring
Status to Date
Challenges
Action Points
(7)
Signature of SPT
and Project Team
Leader
LELIBETH M. TEJADA
SALLY T. DELA CRUZ
RODOLFO P. ABUTAY
A.2. IMPLEMENTATION
OF DEPED PPAS
To properly implement at
least 80 to 85% DepEd
PPAs.
GLORY FE P. ESTORBA
WILLYN LIZ C. SACASAC
NAPTHALY A. PLAZA
A.3. SECURED AND FRIENDLY
ENVIRONMENT FOR
LEARNERS PROJECT (SAFE
PROJECT)
Provide learners with a
safe, healthy, childfriendly, bully- free and
eco-friendly school
environment
RODOLFO N. ABUTAY JR.
EMERLITA T. BETITO
NERIZA S. MELLORIA
A.4. REPAIR, REPAINT AND
REPLACE (3RS)
To repair/ repaint/ replace
at least 90% of classroom
and other school facilities
JESUS R. ADSUARA
RODOLFO R. ABUTAY
ELDEPONSO R. SABIO
B. QUALITY AND RELEVANCE
B.1. HEALTH ENHANCEMENT
FOR LEARNERS AND
TEACHERS (HELT)
To eradicate the number of
severely
wasted
and
wasted pupils to zero level
SALLY T. DELA CRUZ
GERALYN S. BALINAS
JROSE FAY M. AMAT
To provide access to
special education for the
differently abled children
B.2.
TEACHER’S ENHANCEMENT
ACTIVITY (TEAP)
B.3. ADEQUACY OF TEACHING
MATERIALS
PROJECT
(ATEAM)
To provide all the teachers
with SLAC Sessions,
Seminars,
Workshops,
and In-service trainings.
To provide enough
instructional materials for
teachers.
WILLYN LIZ C. SACASAC
JENNIFER PAYNANDOS
ROXETTE JADE ALFORQUE
SUSAN T, AGAPITO
RODOLFO R. ABUTAY
ROSALIE TADENA
B.4. PROJECT VOICE
Hone the Journalistic
skills of the pupils in
Radio Broadcasting
WILYN LIZ C. SACASAC
JENNIFER PAYNANDOS
FRAIDA D. ENOTORIO
B.5. PROJECT SAVE (SERVICE
ACTION FOR VALUES
EDUCATION)
Enhanced pupils’ positive
attitude
KEOBS A. CASTILLO
ROSALIE R. TADENA
HARRIET F. TAGUD
B.6 PROJECT THEA
(THEATER ARTS)
Developed pupils’ skill in
music and arts
DORIS G. ALIA
KEOBS A. CASTILLO
NAPTHALY A. PLAZA
B.7EXEMPLARY
COMPETENCE
FOR
THE
ENHANCEMENT OF LEARNER
SKILLS (PROJECT EXCELS)
B.9 PROJECT BASA, SULAT,
IHAP, DULA UG PAMATASAN
PA
B.10. PROJECT C- WRITEABLE VIS-À-VIS WRITECRAFT
HARRIET F. TAGUD
To sustain the
implementation,
intervention, initiatives of
different activities by
subject areas
Increased the number of
qualifiers, send KAB Scout
for BSP District Jamboree
(from 10 to 12) and Star
Scout for GSP District
Encampment (from 5 to 9)
To enhance the cursive
handwriting skills of the
pupils
MARITONI C.
GALLENERO
NAPTHALY A. PLAZA
APRIL G. LASAGA
LELIBETH M. TEJADA
JOCELYN A. CAGAMPANG
FRAIDA D. ENOTORIO
LELIBETH M. TEJADA
WILLYN LIZ C. SACASAC
GLORY FE P.
ESTORBA
APRIL G. LASAGA
C. GOVERNANCE
C.1
HIRING OF UTILITY
AND SCHOOL SECURITY
(PROJECT HUSS)
To hire 8 job order
personnel for safety and
peace of the school
LILIBETH A.
MANGADLAO
KEOBS A. CASTILLO
RODOLFO N. ABUTAY
JR
C.2 PARTNERSHIP AND
STAKEHOLDERS’
SUPPORT (PASS)
C.3 PROJECT BOOST:
BETTER OPTIMIZATION OF
OPERATIONAL SCHOOL
TECHNICALITIES
At least 95% of the
parents support all school
programs/projects
MARK P. DE LUNA
CARLO G. DINAMPO
JROSE FAY M. AMAT
Maintain the school
operations and
Administrative Services
effectively and efficiently.
MARY O. PLAZA
MARITONI C.
GALLENERO
JROSE FAY M. AMAT
To keep abreast with the
current trends and issues
Download