WATER DEMAND CALCULATION Facilities Occupancy Per Capita Water Requirement 135 ltrs/day Domestic (LD) Flushing (LD) Total (LD) 1080 97200 48600 145800 720 64800 32400 97200 900 81000 40500 121500 243 121.5 364.5 Gardening (5252x 3.5) 18 18 STP Capacity (KLD) 373 Tower A (1BHK)=216 units Tower B (2BHK) + (3BHK)=144 Tower C 2BHK) + (3BHK)=180 Total 2700 243000 Sewage Generation (80 % Domestic + 100 % Flushing) 121500 316 364500 WATER BALANCE Fresh water Demand Recycle water Flushing Purposes 121.5 KLD (CMWSSBwater Supply) 243 KLD Total water Demand 365 KLD Sewage Generation 316 KLD STP Design Capacity 373 KLD Treated Water (95%) 300 KLD Gardening 18 KLD CMWSSB Sewer 160KLD M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Technical Specification Client Contractor M/S. Alliance Mall M/s. Hubert Enviro Care Systems (p) ltd Chennai Chennai – 83 Description P.O. No. For Approval 1 DD-AM-STP-TS-01 Doc. No. 0 Rev. 25.10.13 Date CRH Prepared by JRM C.E.O CR Checked by Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai Technical Specification for Sewage Treatment Plant 1.0 Project & Business Objectives M/S. Hubert Enviro Care Systems (P) Ltd seeks to provide the best technology for the supply of Sewage treatment plant. 2.0 Scope of Work The Scope of our work includes as follows Design & detailed Engineering Fabrication & Supply of all electromechanical equipments Erection of all equipments Testing & Commissioning of all equipments Note: All Civil Works are under Client’s scope. 3.0 Design Basis: STP Plant Capacity - 400 KLD Operating hours - 24 hrs Plant flow rate - 16.6 cum/hr Design flow rate - 17 cum/hr Design capacity - 400 KLD Operating Hours - 24 hrs Plant Flow Rate - 16.6 cum/hr Design Flow Rate - 17 cum/hr UF 2 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai 4.0 Quality logistics: MBBR Technology Description S.No Unit STP STP UF Standards Inlet Outlet 7-8 6.5 – 7.5 Outlet 6.5 -7.5 6.5 – 8.5 1 pH 2 TSS mg/l 200 - 250 < 20 <1 < 30 3 BOD mg/l 350 - 400 < 20 < 20 4 COD mg/l 400 - 500 < 100 < 10 < 100 < 250 5.0 Battery Limit: 1. Sewage Inlet & outlet is under clients scope 2. Incomer Electrical power - 415 Volts and 50 Hz 3. Power incomer to our panel is under Client’s scope 4. Cabling for Panel to the individual equipments is under Contractor’s scope 5. Construction Water & Power is under Client’s scope. 6. Site clearance & handing over of the site to contractor is under Client’s scope. 6.0 7.0 Connectivity Inlet Port : 100 mm Outlet port : 100 mm Codes & Standards: All design; fabrication, inspection, and testing of the plant will be done with respect to the latest Indian Standards. Incase of non-availability of standards, good engineering practice will be adopted. Standards to be followed: Plain & reinforced cement concrete – IS 456: 2000 Concrete structure for the storage of liquids – IS 3370: 1981-88 3 Pressure vessels – ASME SEC VIII Pumps – IS 5120 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai Others – Available IS standards. Incase of non-availability of standards, good engineering practice will be adopted. 9.0 Process description: MBBR Technology The sewage generated from the various sources will be collected in the collection tank through the bar screen chamber in order to remove the floating materials and particle size greater than 15mm. The Screened sewage is then led to the aeration tank. In the aeration tank, air is diffused through special type of diffusers to oxidize the organic matters with the help of air blower & diffuser arrangement. Biological treatment takes place through MBBR media. Then the overflow from aeration tank is sent to the Clarifier tank for settling. The bioflocs formed in the aeration tank will be settled at the bottom of the Clarifier tank through Clarifier rake mechanism and the settled sludge will be pumped to the sludge holding tank through the return sludge pump. From sludge holding tank, the sludge will be fed to filter press unit for dewatering purpose through screw pumps. The clarified overflow will be collected in the Clarified water tank from where it is pumped to the Pressure Sand Filter, Activated Carbon Filter through Filter feed pump for the removal of suspended solids, organic matter and odour. The filtered water is stored in the filtered water tank / UF feed tank. The filtered water will then be fed to the UF unit through UF feed pump. UF permeate water will be used for flushing & gardening. UF backwash & cleaning are done at regular intervals in order to prevent the membranes from chocking and scaling of the membrane. 4 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai TECHNICAL SPECIFICATIONS OF CIVIL WORKS 5 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Collection Tank (UG) Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 139 Cum 3 Length 11.5 m 4 Width 5.5 m 5 Liquid depth 2.2 m 6 Total Height 3.5 m 7 Invert Level 1m below FGL 8 MOC RCC - M30 9 Wall Thickness As per the structural design 10 Raft Thickness As per the structural design 11 PCC As per the structural design 12 Base Reinforcement Details As per the structural design 13 Wall Main Reinforcement Details As per the structural design 14 Wall Distributer Reinforcement As per the structural design Details 15 Plastering CM 1:3 16 Plastering Thickness 12 mm 17 Submersible Pump Pit 1.5m x 0.5m x 0.5m Adequacy calculation Volume of Collection tank V - 139 cum Plant Flow Rate Q - 17 cum/hr Retention time T - V/Q - 139 /17 - 8.1 hrs Standard retention hrs for Collection tank is 6 hrs – 8 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate 6 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Screen Chamber (UG) Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank data 1 Quantity 1 No 2 Capacity 0.54 cum 3 Length 1.5 m 4 Width 0.8 m 5 Liquid depth 0.45 m 6 Depth 1.6 m 7 Wall Thickness As per the structural design 8 MOC RCC 9 Base Reinforcement As per the structural design 10 Wall Reinforcement As per the structural design 11 Plastering CM 1:3 12 Plastering Thickness 12 mm Adequacy calculation Volume of Screen Chamber V - 0.54 cum Plant Flow Rate Q - 17 cum/hr Retention time T - V/Q - 0.54 /17 - 0.032 hrs - 1.9 min Standard retention hrs for Collection tank is 1 min – 5 min Provided retention hrs is > or = Standard retention hrs. Hence adequate 7 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Aeration Tank (AG) Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 211.2 cum 3 Length 12 m 4 Width 5.5 m 5 Liquid depth 3.2 m 6 Total Height 3.5 m 7 MOC RCC - M30 8 Wall Thickness As per the structural design 9 Raft Thickness As per the structural design 10 PCC As per the structural design 11 Base Reinforcement As per the structural design 12 Wall Main Reinforcement As per the structural design 13 Wall Distributer Reinforcement As per the structural design 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of Aeration tank V - 211.2 cum Plant Flow Rate Q - 17 cum/hr Retention time T - V/Q - 211.2 /17 - 12.42 hrs Standard retention hrs for Aeration tank is 8 hrs – 12 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate 8 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Clarifier Tank (AG) Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 66.52 cum 3 Diameter 5.5 m 4 Liquid Depth 2.8 m 5 Total Height 3.5 m 6 MOC RCC – M30 7 Wall Thickness As per the structural design 8 Raft Thickness As per the structural design 9 PCC As per the structural design 10 Base Reinforcement Details As per the structural design 11 Wall Main Reinforcement Details As per the structural design 12 Wall Distributer Reinforcement As per the structural design Details 13 Plastering CM 1:3 14 Thickness of Plastering 12 mm Adequacy calculation Volume of Clarifier tank V - 66.52 cum Plant Flow Rate Q - 17 cum/hr Retention time T - V/Q - 66.52 /17 - 3.91 hrs Standard retention hrs for Clarifier tank is 3 hrs – 3.5 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate 9 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Sludge Holding tank (AG) Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 22.5 cum 3 Length 1.5 m 4 Width 5.5 m 5 Liquid Depth 3m 6 Total Height 3.5 m 7 MOC RCC – M30 8 Wall Thickness As per the Structural design 9 Raft Thickness As per the Structural design 10 PCC As per the Structural design 11 Base Reinforcement Details As per the Structural design 12 Wall Main Reinforcement Details As per the Structural design 13 Wall Distributer Reinforcement As per the Structural design Details 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of Sludge Holding tank V - 22.5 cum Plant Flow Rate Q - 17 cum/hr Retention time T - V/Q - 22.5 /17 - 1.32 hrs Standard retention hrs for Sludge holding tank is 1 hrs – 1.5 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate 10 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Clarified Water Tank (AG) Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 33 cum 3 Length 2.5 m 4 Width 5.5 m 5 Liquid Depth 2.4 m 6 Total Height 3.5 m 7 MOC RCC - M30 8 Wall Thickness As per the structural design 9 Raft Thickness As per the structural design 10 PCC As per the structural design 11 Base Reinforcement Details As per the structural design 12 Wall Main Reinforcement Details As per the structural design 13 Wall Distributer Reinforcement As per the structural design Details 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of Clarified Water tank V - 33 cum Plant Flow Rate Q - 17 cum/hr Retention time T - V/Q - 33 /17 - 1.94 hrs Standard retention hrs for Clarified water tank is 1.5 hrs – 2 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate 11 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Filtered Water Tank / UF Feed Tank Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 99 cum 3 Length 6m 4 Width 5.5 m 5 Liquid Depth 3m 6 Total Height 3.5 m 7 MOC RCC - M30 8 Wall Thickness As per the structural design 9 Raft Thickness As per the structural design 10 PCC As per the structural design 11 Base Reinforcement Details As per the structural design 12 Wall Main Reinforcement Details As per the structural design 13 Wall Distributer Reinforcement As per the structural design Details 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of Filtered Water tank V - 99 cum Plant Flow Rate Q - 17 cum/hr Retention time T - V/Q - 99 /17 - 5.8 hrs Standard retention hrs for Filtered Water tank is 4 hrs – 6 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate 12 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of UF Permeate Tank Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 99 cum 3 Length 6m 4 Width 5.5 m 5 Liquid Depth 3m 6 Total Height 3.5 m 7 MOC RCC - M30 8 Wall Thickness As per the structural design 9 Raft Thickness As per the structural design 10 PCC As per the structural design 11 Base Reinforcement Details As per the structural design 12 Wall Main Reinforcement Details As per the structural design 13 Wall Distributer Reinforcement As per the structural design Details 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of UF Permeate tank V - 99 cum Plant Flow Rate Q - 17 cum/hr Retention time T - V/Q - 99 /17 - 5.82 hrs Standard retention hrs for UF Permeate tank is 4 hrs – 6 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate 13 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai TECHNICAL SPECIFICATIONS OF ELECTROMECHANICAL WORKS 14 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Raw Sewage Transfer Pump Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 2 No (1W+1S) 2 Type Submersible Nonclog 3 Capacity 17 cum/hr 4 Head 15 m 5 Speed 2900 rpm 6 Seal Gland Packing 7 Pump Delivery Size 50 NB 8 Motor rating 2 HP 9 Phase 3 phase 10 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10% 11 Class of insulation F 12 Model 1500 CW 13 MOC CI 14 Make Kirloskar / eq. 15 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Bar Screen Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Screen data 1 Quantity 1 No 2 Opening size 15 mm 3 Size of Flat 25 x 5mm. 4 Width 800 mm 5 Height 1600 mm 6 MOC MS – Epoxy 7 Make HECS 16 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Air Blower Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Air Blower Data 1 Quantity 2 No (1W + 1S) 2 Type Twin Lobe Rotary 3 Capacity 500 cum/hr 4 Pressure 0.5 kg/cm2 5 MOC CI 6 Model 67 AC 7 Size 80 mm 8 Make Kay / eq. Motor Data 9 Quantity 2 No (1W + 1S) 10 Type TEFC Squirrel Cage Induction 11 MOC CI 12 Speed 1440 rpm 13 Voltage / Frequency 415 V / 50 Hz 14 Motor Rating 20 HP 15 Power Supply 3 Phase 16 Make Kirloskar / eq. Adequacy calculation Assume O2 requirement = 2 kg of O2/ 1 kg of BOD 1kg of BOD / 2 kg of O2 Assume BOD for sewage = 400 mg/l = 0.40 kg/m3 BOD Load = 400 x 0.40 = 160 kg of BOD/day O2 requirement = 160 x 2 = 320 kg of O2/day Oxygen transfer @ 16% of SOTR = 320 / (0.16 x 0.23x 0.65 x 0.95) = 320 / 0.023 = 13913.04 17 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai α = 0.65; β = 0.95 Density = 1.16 => 13913.04 / 1.16 = 11994 m3/day Air requirement = 11994 / 24 = 499.75 m3/hr Therefore 500 m3/hr (1 + 1) each for aeration tank, the air flow rate is adequate. 18 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Diffusers Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Coarse Bubble Diffuser Data 1 Quantity 10 No 2 Type Tubular Coarse bubble 3 Diameter 90 mm Dia 4 Length 1000 mm 5 MOC EPDM 6 Location Collection tank 7 Make HECS Fine Bubble Diffuser Data 8 Quantity 40 No 9 Type Tubular Fine bubble 10 Diameter 63 mm Dia 11 Length 1000 mm 12 MOC EPDM 13 Location Aeration tank 14 Make HECS Adequacy calculation: Blower capacity = 500 cum/hr Air flow rate per diffuser = 10 m3/hr Therefore no. of diffusers required = 500 / 10 = 50 no No. of diffusers provided = 50 no Hence it’s adequate. 19 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of MBBR Media Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Media Data 1 Quantity 1 Lot 2 Type Moving Bed Bio Reactor 3 Surface area 250 m2 / m3 4 MOC PVC 5 Location Aeration tank 6 Accessories SS mesh at the outlet of the aeration tank to avoid the escape of media 7 Make HECS 20 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Clarifier Rake Mechanism Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Feed Well data 1 Quantity 1 no 2 Type Central driven 3 Feed well diameter 800 mm 4 Feed well Height 1500 mm 5 MOC of Feed Well MS – Epoxy 6 Supports MS Angle / Channel 7 Make HECS Rake Mechanism 8 Quantity 1 No (5.5 m diameter) 9 Structure Channel / Angles 10 MOC of Rake MS Epoxy 11 Accessories Rubber Squeezes, Bolt, nuts etc 12 Make HECS Drive Head data 13 Quantity 1 No 14 Drive Head diameter 600 mm 15 Ratio 50 : 1 16 MOC CI Gearbox data 17 Quantity 1 No 18 Type Foot Mounted 19 Ratio 70 : 1 20 MOC CI 21 Make Elecon / eq. Motor data 22 Quantity 1 No 23 Type TEFC Squirrel Cage Induction 24 MOC CI 25 Rating 2 HP 26 Power Supply 3 Phase 27 Voltage / Frequency 415 V / 50 Hz 28 Make Kirloskar / eq. 29 Accessories Love jaw Coupling, Gear Sprockets , Chain with links 21 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Return Sludge Pump Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 2 No (1W + 1S) 2 Type Centrifugal Nonclog 3 Capacity 5 cum/hr 4 Head 12 - 15 m 5 Speed 2760 rpm 6 Model SP ‘O’ 7 MOC CI 8 Make Kirloskar / eq. Motor data 9 Motor type TEFC Squirrel Cage Induction 10 Motor rating 1 HP 11 Phase 3 phase 13 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10% 14 MOC CI 15 Make Kirloskar / eq. 22 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Screw Pump Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 1 No 2 Type Single Screw Single Stage 3 Capacity 3 cum/hr 4 Head 50 m 5 Speed 325 rpm 6 MOC of Rotor SS 304 7 MOC of Stator EPDM 8 Make Heliflow / eq. Motor data 9 Motor type TEFC Squirrel cage induction type 10 Motor rating 3 HP 11 Phase 3 phase 12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10% 13 MOC CI 14 Make Kirloskar / eq. 23 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Filter Press Unit Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Filter Press Unit data 1 Quantity 1 No 2 Type Manual Hydraulic 3 Capacity 3 cum/hr 4 Operating Pressure 5 Kg/cm2 5 MOC of Structure MS 6 No of Plates 10 7 No. of Chambers 9 8 Size 470mm x 470mm 9 MOC of Plates PP 10 Make Swarna Sankara / Isha / eq. 24 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Hypo Dosing System Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 1 No 2 Type Electronic metering type 3 Capacity 0 – 10 lph 4 Pressure 2 ksc 5 MOC PP 6 Rating 60 W 7 Make Prominent / eq. Tank data 8 Quantity 1 No 9 Type Cylindrical vertical 10 Capacity 200 ltrs 11 MOC HDPE 12 Make Sintex / eq. 25 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Filter Feed Pump Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 2 No (1W +1S) 2 Type Centrifugal Monobloc 3 Capacity 17 cum/hr 4 Head 30 m 5 MOC CI 6 Speed 2760 rpm 7 Model KDS 538++ 8 Make Kirloskar / eq. Motor data 9 Type TEFC Squirrel Cage Induction type 10 Motor rating 5 HP 11 Phase 3 phase 12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10% 13 MOC CI 14 Make Kirloskar / eq. 26 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai SEWAGE TREATMENT PLANT Specification of Pressure Sand filter Client : M/S. Alliance Mall, Chennai Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Vessel data 1 Quantity 1 no 2 Type Vertical pressure vessel 3 Capacity 17 cum/hr 4 Diameter 1500 mm 5 HOS 1800 mm 6 MOC MS-Epoxy 7 Shell Thickness 6 mm 8 Dish Thickness 8 mm 9 Working pressure 2.5 kg/cm2 10 Design Pressure 3.2 Kg/cm2 11 Test Pressure 6 Kg/cm2 12 Make HECS Frontal Piping data 13 Size 100 NB 14 Accessories Flanges, Elbow, Tee 15 MOC MS 16 Type of Valves Butterfly Valves 17 Size of Valves 100 NB / 40 NB 18 Make of Pipes Jindal / eq. 19 Make of Valves Intervalve / eq. Media Details 20 25 – 50mm Pebbles 100 mm 21 12 – 25mm Pebbles 100 mm 22 6 – 12 mm Pebbles 200 mm 23 3 - 6 mm Pebbles 200 mm 24 Coarse Sand 350 mm 25 Fine Sand 500 mm 27 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall, Chennai Pressure Sand Filter: Flow rate Q : 17 cum/hr Filtration rate for PSF (V) : 10 m3/m2 hr Q : AxV A : 17 / 10 : 1.7 SQ.M : 1.7 X 4 / 3.14 : 2.16 : 1.47 M 2 D D Diameter provided is 1.5 m Hence adequate 28 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Technical Specification Client Contractor M/S. Alliance Mall Developers, M/s. Hubert Enviro Care Systems (p) ltd Coimbatore Chennai – 83 Description P.O. No. For Approval 1 DD-AMD-STP-TS-01 Doc. No. 0 Rev. 25.07.13 Date CR Prepared by JRM C.E.O CR Checked by Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore Technical Specification for Sewage Treatment Plant 1.0 Project & Business Objectives M/S. Hubert Enviro Care Systems (P) Ltd seeks to provide the best technology for the supply of Sewage treatment plant. 2.0 Scope of Work The Scope of our work includes as follows Design & detailed Engineering Fabrication & Supply of all electromechanical equipments Erection of all equipments Testing & Commissioning of all equipments Note: All Civil Works are under Client’s scope. 3.0 Design Basis: STP 4.0 Plant Capacity - 207 KLD Operating hours - 24 hrs Plant flow rate - 8.625 cum/hr Design flow rate - 9 cum/hr Quality logistics: MBBR Technology S.No 2 Description Unit STP Inlet STP Outlet Standards 7-8 6.5 – 7.5 6.5 – 8.5 1 pH 2 TSS mg/l 200 - 250 < 20 < 30 3 BOD mg/l 350 - 400 < 20 < 20 4 COD mg/l 400 - 500 < 100 < 250 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore 5.0 Battery Limit: 1. Sewage Inlet & outlet is clients scope 2. Incomer Electrical power - 415 Volts and 50 Hz 3. Power incomer to our panel is under client’s scope 4. Cabling for Panel to the individual equipments is under Contractor’s scope 5. Construction Water & Power is under Client’s scope. 6. Site clearance & handing over of the site to contractor is under Client’s scope. 6.0 7.0 Connectivity Inlet Port : 100 mm Outlet port : 100 mm Codes & Standards: All design; fabrication, inspection, and testing of the plant will be done with respect to the latest Indian Standards. Incase of non-availability of standards, good engineering practice will be adopted. Standards to be followed: Plain & reinforced cement concrete – IS 456: 2000 Concrete structure for the storage of liquids – IS 3370: 1981-88 Pressure vessels – ASME SEC VIII Pumps – IS 5120 Others – Available IS standards. Incase of non-availability of standards, good engineering practice will be adopted. 9.0 Process description: MBBR Technology The sewage generated from the various sources will be collected in the collection tank through the bar screen chamber in order to remove the floating materials and particle size greater than 15mm. The Screened sewage is then led to the aeration tank. 3 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore In the aeration tank, air is diffused through special type of diffusers to oxidize the organic matters with the help of air blower & diffuser arrangement. Biological treatment takes place through MBBR media. Then the overflow from aeration tank is sent to the Clarifier tank for settling. The bioflocs formed in the aeration tank will be settled at the bottom of the Clarifier tank through Clarifier rake mechanism and the settled sludge will be pumped to the sludge holding tank through the return sludge pump. From sludge holding tank, the sludge will be fed to filter press unit for dewatering purpose through screw pumps. The clarified overflow will be collected in the Clarified water tank from where it is pumped to the Pressure Sand Filter, Activated Carbon Filter through Filter feed pump for the removal of suspended solids, organic matter and odour. UV dosing is given for disinfection purpose. The filtered water is stored in the treated water tank from where it is usde for gardening purpose. 4 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore TECHNICAL SPECIFICATIONS OF CIVIL WORKS 5 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Collection Tank (UG) Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 72.16 Cum 3 Length 8.2 m 4 Width 4m 5 Liquid depth 2.2 m 6 Total Height 3.5 m 7 Invert Level 1m below FGL 8 MOC RCC - M30 9 Wall Thickness As per the structural design 10 Raft Thickness As per the structural design 11 PCC As per the structural design 12 Base Reinforcement Details As per the structural design 13 Wall Main Reinforcement Details As per the structural design 14 Wall Distributer Reinforcement As per the structural design Details 15 Plastering CM 1:3 16 Plastering Thickness 12 mm 17 Submersible Pump Pit 1.5m x 0.5m x 0.5m Adequacy calculation Volume of Collection tank V - 72.16 cum Plant Flow Rate Q - 9 cum/hr Retention time T - V/Q - 72.16 /9 - 8.02 hrs Standard retention hrs for Collection tank is 6 hrs – 8 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate. 6 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Screen Chamber (UG) Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank data 1 Quantity 1 No 2 Capacity 0.324 cum 3 Length 1.2 m 4 Width 0.6 m 5 Liquid depth 0.45 m 6 Depth 1.6 m 7 Wall Thickness As per the structural design 8 MOC RCC 9 Base Reinforcement As per the structural design 10 Wall Reinforcement As per the structural design 11 Plastering CM 1:3 12 Plastering Thickness 12 mm Adequacy calculation Volume of Bar Screen Chamber V - 0.324 cum Plant Flow Rate Q - 9 cum/hr Retention time T - V/Q - 0.324 /9 - 0.036 hrs - 2.16 mins Standard retention hrs for Bar Screen chamber is 1 min – 5 mins Provided retention hrs is > or = Standard retention hrs. Hence adequate. 7 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Aeration Tank (AG) Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 108.8 cum 3 Length 8.5 m 4 Width 4m 5 Liquid depth 3.2 m 6 Total Height 3.5 m 7 MOC RCC - M30 8 Wall Thickness As per the structural design 9 Raft Thickness As per the structural design 10 PCC As per the structural design 11 Base Reinforcement As per the structural design 12 Wall Main Reinforcement As per the structural design 13 Wall Distributer Reinforcement As per the structural design 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of Aeration tank V - 108.8 cum Plant Flow Rate Q - 9 cum/hr Retention time T - V/Q - 108.8 /9 - 12.1 hrs Standard retention hrs for Aeration tank is 8 hrs – 12 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate. 8 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Clarifier Tank (AG) Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 35.19 cum 3 Diameter 4m 4 Liquid Depth 2.8 m 5 Total Height 3.5 m 6 MOC RCC – M30 7 Wall Thickness As per the structural design 8 Raft Thickness As per the structural design 9 PCC As per the structural design 10 Base Reinforcement Details As per the structural design 11 Wall Main Reinforcement Details As per the structural design 12 Wall Distributer Reinforcement As per the structural design Details 13 Plastering CM 1:3 14 Thickness of Plastering 12 mm Adequacy calculation Volume of Clarifier tank V - 35.19 cum Plant Flow Rate Q - 9 cum/hr Retention time T - V/Q - 35.19 /9 - 3.9 hrs Standard retention hrs for Clarifier tank is 3 hrs – 3.5 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate. 9 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Sludge Holding tank (AG) Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 12 cum 3 Length 1m 4 Width 4.0 m 5 Liquid Depth 3m 6 Total Height 3.5 m 7 MOC RCC – M30 8 Wall Thickness As per the Structural design 9 Raft Thickness As per the Structural design 10 PCC As per the Structural design 11 Base Reinforcement Details As per the Structural design 12 Wall Main Reinforcement Details As per the Structural design 13 Wall Distributer Reinforcement As per the Structural design Details 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of Sludge holding tank V - 12 cum Plant Flow Rate Q - 9 cum/hr Retention time T - V/Q - 12 /9 - 1.33 hrs Standard retention hrs for Sludge Holding tank is 1 hrs – 1.5 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate. 10 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Clarified Water Tank (AG) Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 19.2 cum 3 Length 2m 4 Width 4m 5 Liquid Depth 2.4 m 6 Total Height 3.5 m 7 MOC RCC - M30 8 Wall Thickness As per the structural design 9 Raft Thickness As per the structural design 10 PCC As per the structural design 11 Base Reinforcement Details As per the structural design 12 Wall Main Reinforcement Details As per the structural design 13 Wall Distributer Reinforcement As per the structural design Details 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of Clarified water tank V - 19.2 cum Plant Flow Rate Q - 9 cum/hr Retention time T - V/Q - 19.2 /9 - 2.13 hrs Standard retention hrs for Clarified water tank is 1.5 hrs – 2 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate. 11 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Treated Water Tank Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Tank Data 1 Quantity 1 No 2 Capacity 48 cum 3 Length 4m 4 Width 4m 5 Liquid Depth 3m 6 Total Height 3.5 m 7 MOC RCC - M30 8 Wall Thickness As per the structural design 9 Raft Thickness As per the structural design 10 PCC As per the structural design 11 Base Reinforcement Details As per the structural design 12 Wall Main Reinforcement Details As per the structural design 13 Wall Distributer Reinforcement As per the structural design Details 14 Plastering CM 1:3 15 Thickness of Plastering 12 mm Adequacy calculation Volume of Treated Water tank V - 48 cum Plant Flow Rate Q - 9 cum/hr Retention time T - V/Q - 48 /9 - 5.33 hrs Standard retention hrs for Treated water tank is 4 hrs – 6 hrs Provided retention hrs is > or = Standard retention hrs. Hence adequate. 12 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore TECHNICAL SPECIFICATIONS OF ELECTROMECHANICAL WORKS 13 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Raw Sewage Transfer Pump Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 2 No (1W+1S) 2 Type Submersible Nonclog 3 Capacity 9 cum/hr 4 Head 15 - 20 m 5 Speed 2900 rpm 6 Seal Gland Packing 7 Pump Delivery Size 50 NB 8 Motor rating 2 HP 9 Phase 3 phase 10 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10% 11 Class of insulation F 12 Model 1500 CW 13 MOC CI 14 Make Kirloskar / eq. 14 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Bar Screen Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Screen data 1 Quantity 1 No 2 Opening size 15 mm 3 Size of Flat 25 x 5mm. 4 Width 600 mm 5 Height 1600 mm 6 MOC MS – Epoxy 7 Make HECS 15 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Air Blower Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Air Blower Data 1 Quantity 2 No (1W + 1S) 2 Type Twin Lobe Rotary 3 Capacity 300 cum/hr 4 Pressure 0.6 kg/cm2 5 MOC CI 6 Model 65 AC 7 Size 80 mm 8 Make Kay / eq. Motor Data 9 Quantity 2 No (1W + 1S) 10 Type TEFC Squirrel Cage Induction 11 MOC CI 12 Speed 1440 rpm 13 Voltage / Frequency 415 V / 50 Hz 14 Motor Rating 15 HP 15 Power Supply 3 Phase 16 Make Kirloskar / eq. Adequacy calculation Assume O2 requirement = 2 kg of O2/ 1 kg of BOD 1kg of BOD / 2 kg of O2 Assume BOD for sewage = 400 mg/l = 0.40 kg/m3 BOD Load = 207 x 0.40 = 82.8 kg of BOD/day O2 requirement = 82.8 x 2 = 165.6 kg of O2/day Oxygen transfer @ 16% of SOTR = 165.6 / (0.16 x 0.23x 0.65 x 0.95) = 165.6 / 0.023 = 7200 16 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore α = 0.65; β = 0.95 Density = 1.16 => 7200 / 1.16 = 6206.9 m3/day Air requirement = 6206.9 / 24 = 258.62 m3/hr Therefore 300 m3/hr (1 + 1) each for aeration tank, the air flow rate is adequate. 17 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Diffusers Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Coarse Bubble Diffuser Data 1 Quantity 8 No 2 Type Tubular Coarse bubble 3 Diameter 90 mm Dia 4 Length 1000 mm 5 MOC EPDM 6 Location Collection tank 7 Make HECS Fine Bubble Diffuser Data 8 Quantity 22 No 9 Type Tubular Fine bubble 10 Diameter 90 mm Dia 11 Length 1000 mm 12 MOC EPDM 13 Location Aeration tank 14 Make HECS Adequacy calculation: Blower capacity = 300 cum/hr Air flow rate per diffuser = 10 m3/hr Therefore no. of diffusers required = 300 / 10 = 30 nos No. of diffusers provided = 30 nos Hence it’s adequate. 18 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of MBBR Media Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Media Data 1 Quantity 1 Lot 2 Type Moving Bed Bio Reactor 3 Surface area 450 m2 / m3 4 MOC PVC 5 Location Aeration tank 6 Accessories SS mesh at the outlet of the aeration tank to avoid the escape of media 7 Make HECS 19 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Clarifier Rake Mechanism Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Feed Well data 1 Quantity 1 no 2 Type Central driven 3 Feed well diameter 800 mm 4 Feed well Height 1500 mm 5 MOC of Feed Well MS – Epoxy 6 Supports MS Angle / Channel 7 Make HECS Rake Mechanism 8 Quantity 1 No (4 m diameter) 9 Structure Channel / Angles 10 MOC of Rake MS Epoxy 11 Accessories Rubber Squeezes, Bolt, nuts etc 12 Make HECS Drive Head data 13 Quantity 1 No 14 Drive Head diameter 450 mm 15 Ratio 50 : 1 16 MOC CI Gearbox data 17 Quantity 1 No 18 Type Foot Mounted 19 Ratio 70 : 1 20 MOC CI 21 Make Elecon / eq. Motor data 22 Quantity 1 No 23 Type TEFC Squirrel Cage Induction 24 MOC CI 25 Rating 2 HP 26 Power Supply 3 Phase 27 Voltage / Frequency 415 V / 50 Hz 28 Make Kirloskar / eq. 29 Accessories Love jaw Coupling, Gear Sprockets , Chain with links 20 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Return Sludge Pump Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 2 No (1W + 1S) 2 Type Centrifugal Nonclog 3 Capacity 3 cum/hr 4 Head 12 - 15 m 5 Speed 2760 rpm 6 Model SP ‘O’ 7 MOC CI 8 Make Kirloskar / eq. Motor data 9 Motor type TEFC Squirrel Cage Induction 10 Motor rating 1 HP 11 Phase 3 phase 13 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10% 14 MOC CI 15 Make Kirloskar / eq. 21 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Screw Pump Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 1 No 2 Type Single Screw Single Stage 3 Capacity 2 cum/hr 4 Head 50 m 5 Speed 325 rpm 6 MOC of Rotor SS 304 7 MOC of Stator EPDM 8 Make Heliflow / eq. Motor data 9 Motor type TEFC Squirrel cage induction type 10 Motor rating 2 HP 11 Phase 3 phase 12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10% 13 MOC CI 14 Make Kirloskar / eq. 22 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Filter Press Unit Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Filter Press Unit data 1 Quantity 1 No 2 Type Manual Hydraulic 3 Capacity 2 cum/hr 4 Operating Pressure 5 Kg/cm2 5 MOC of Structure MS 6 No of Plates 8 7 No. of Chambers 7 8 Size 470mm x 470mm 9 MOC of Plates PP 10 Make Swarna Sankara / Isha / eq. 23 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Filter Feed Pump Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai Sl.No Description Specification Pump data 1 Quantity 2 No (1W +1S) 2 Type Centrifugal Monobloc 3 Capacity 9 cum/hr 4 Head 30 m 5 MOC CI 6 Speed 2760 rpm 7 Model KDS 335++ 8 Make Kirloskar / eq. Motor data 9 Type TEFC Squirrel Cage Induction type 10 Motor rating 3 HP 11 Phase 3 phase 12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10% 13 MOC CI 14 Make Kirloskar / eq. 24 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Pressure Sand filter Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Vessel data 1 Quantity 1 no 2 Type Vertical pressure vessel 3 Capacity 9 cum/hr 4 Diameter 1100 mm 5 HOS 1500 mm 6 MOC MS-Epoxy 7 Shell Thickness 6 mm 8 Dish Thickness 8 mm 9 Working pressure 2.5 kg/cm2 10 Design Pressure 3.2 Kg/cm2 11 Test Pressure 6 Kg/cm2 12 Make HECS Frontal Piping data 13 Size 65 NB 14 Accessories Flanges, Elbow, Tee 15 MOC MS 16 Type of Valves Butterfly Valves 17 Size of Valves 65 NB / 40 NB 18 Make of Pipes Jindal / eq. 19 Make of Valves Intervalve / eq. Media Details 20 25 – 50mm Pebbles 100 mm 21 12 – 25mm Pebbles 100 mm 22 6 – 12 mm Pebbles 100 mm 23 3 - 6 mm Pebbles 100 mm 24 Coarse Sand 250 mm 25 Fine Sand 450 mm 25 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore Pressure Sand Filter: Flow rate Q : 9 cum/hr Filtration rate for PSF (V) : 10 m3/m2 hr Q : AxV A : 9 / 10 : 0.9 SQ.M : 0.9 X 4 / 3.14 : 1.146 : 1.07 M 2 D D Diameter provided is 1100 mm Hence adequate 26 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore SEWAGE TREATMENT PLANT Specification of Activated Carbon filter Client : M/S. Alliance Mall Developers, Coimbatore Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai S.No Description Specification Vessel data 1 Quantity 1 no 2 Type Vertical pressure vessel 3 Capacity 9 cum/hr 4 Diameter 1100 mm 5 HOS 1500 mm 6 MOC MS-Epoxy 7 Shell Thickness 6 mm 8 Dish Thickness 8 mm 9 Working pressure 2.5 kg/ cm2 10 Design Pressure 3.2 kg/ cm2 11 Test Pressure 6 kg/ cm2 12 Make HECS Frontal Piping data 13 Size 65 NB 14 Accessories Flanges, Elbow, Tee 15 MOC MS 16 Type of Valves Butterfly Valves 17 Size of Valves 65 NB / 40 NB 18 Make of Pipes Jindal / eq. 19 Make of Valves Intervalve / eq. Media Details 20 25 – 50mm Pebbles 100 mm 21 12 – 25mm Pebbles 100 mm 22 6 – 12 mm Pebbles 100 mm 23 3 - 6 mm Pebbles 100 mm 24 Coarse Sand 250 mm 25 Activated Carbon 450 mm 27 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) M/S. Alliance Mall Developers, Coimbatore Activated Carbon Filter: Flow rate Q : 9 cum/hr Filtration rate for ACF (V) : 10 m3/m2 hr Q : AxV A : 9 / 10 : 0.9 SQ.M : 0.9 X 4 / 3.14 : 1.146 : 1.07 M 2 D D Diameter provided is 1100 mm Hence adequate 28 Hubert Enviro Care Systems (p)Ltd ( An ISO 9001 – 2000 Company ) PROZONE RESIDENTIAL AT COIMBATORE S. No. Load Description 1 2 3 4 5 6 7 8 9 10 11 12 13 Light points Light Points Wall C. Fan Ex. Fans 6A Half Point 6A socket 16A Socket 16A Fridge 20 A geyser pt. Air Conditioning units Telephone Point Data Point TV Point ELECTRICAL LOAD CALCULATION Qty. 1BHK Qty. 2BHK Qty. 3BHK 5 4 4 2 3 7 2 1 1 9 7 5 3 4 11 2 1 2 11 10 6 4 5 14 2 1 3 Unit Load (kW) 0.04 0.025 0.08 0.06 0.1 0.1 0.5 0.75 2 2 3 4 2 1 2 3 1 3 4 2 4 Diversity factor TCL 1 BHK TCL 2 TCL 3 BHK MD 1 BHK MD 2 BHK MD 3 BHK (kW) BHK (kW) TYPE (kW) (kW) (kW) (kW) 0.6 0.6 0.6 0.2 0.2 0.4 0.3 0.3 0.2 0.20 0.10 0.32 0.12 0.30 0.70 1.00 0.75 2.00 0.36 0.18 0.40 0.18 0.40 1.10 1.00 0.75 4.00 0.44 0.25 0.48 0.24 0.50 1.40 1.00 0.75 6.00 0.12 0.06 0.19 0.02 0.06 0.28 0.30 0.23 0.40 0.22 0.11 0.24 0.04 0.08 0.44 0.30 0.23 0.80 0.26 0.15 0.29 0.05 0.10 0.56 0.30 0.23 1.20 1.2 0.4 2.40 3.60 4.80 0.96 1.44 1.92 0.25 0.2 1 0.6 0.25 0.40 0.25 0.60 0.50 0.80 0.25 0.24 0.25 0.36 0.50 0.48 Total 8.54 12.82 17.16 3.11 4.49 6.04 Say 9 13 17 3 4.5 6 1/6 PROZONE RESIDENTIAL AT COIMBATORE For Internal Area Sr. no Description 1 TOTAL 1 BHK Total Flats TCL/Flat (kW) 216 216 9 TCL all Flats (kW) 1944 1944 MD/Flat (kW) MD all Flats (kW) 3 648 648 Common Area Calculation Sr. No. Area Description 1 2 3 4 5 Area in Sq.ft. Lift lobby Staircase Passage PHE Load Lifts 3617 8830 16372 Unit Watts/Sq. Ft. 1 3 1 0.36 1 15 Total Load For Common area Load In kW Load Calculation Total Connected Load Total Demand Load ELECTRICAL LOAD CAL.-TOWER A 2050 703 Total Connected Load (kW) 3.6 3.2 16.4 38 45 106 Diversity 0.6 0.6 0.6 0.5 0.5 Total Max. Total Load Total Load Demand on DG on DG @ Load 2.2 2.2 1.9 1.9 9.82 9.8 19.0 0.0 23 23 55 36 kW kW 2/6 PROZONE RESIDENTIAL AT COIMBATORE For Internal Area Sr. no Description 1 2 TOTAL 2 BHK 3 BHK Total Flats TCL/Flat (kW) 72 72 144 13 17 TCL all Flats (kW) 936 1224 2160 MD/Flat (kW) MD all Flats (kW) 4.5 6 324 432 756 Common Area Calculation Sr. No. 1 2 3 4 5 Area Description Area in Sq.ft. Unit Lift lobby 6555 Staircase 10511 Passage 12400 PHE Load 1 Lifts 4 Total Load For Common area Load In kW Load Calculation Total Connected Load Total Demand Load ELECTRICAL LOAD CALCULATION- TOWER B 2276 816 Watts/Sq. Ft. 1 0.36 1 15 Total Connected Load (kW) 6.6 3.8 12.4 33 60 116 Diversity 0.6 0.6 0.6 0.5 0.5 Total Max. Total Load Demand Load on DG 3.9 2.3 7.44 16.5 30 60 3.9 2.3 7.4 0.0 30 44 kW kW 3/6 PROZONE RESIDENTIAL AT COIMBATORE For Internal Area Sr. no Description 1 2 TOTAL 2 BHK 3 BHK Total Flats TCL/Flat (kW) 72 108 180 13 17 TCL all Flats (kW) 936 1836 2772 MD/Flat (kW) MD all Flats (kW) 4.5 6 324 648 972 Common Area Calculation Sr. No. 1 2 3 4 5 Area Description Area in Sq.ft. Unit Lift lobby 6781 Staircase 10172 Passage 16469 PHE Load 1 Lifts 5 Total Load For Common area Load In kW Load Calculation Total Connected Load Total Demand Load ELECTRICAL LOAD CALCULATION - TOWER C 2914 1046 Watts/Sq. Ft. 1 0.36 1 15 Total Connected Load (kW) 6.8 3.7 16.5 40 75 142 Diversity 0.6 0.6 0.6 0.5 0.5 Total Max. Total Load Demand Load on DG 4.1 2.2 9.88 20.0 38 74 4.1 2.2 9.9 0.0 38 54 kW kW 4/6 PROZONE RESIDENTIAL AT COIMBATORE Sr. No. Area Description 1 2 3 4 5 Fire Fighting Load STP Load External Lighting Load Basement Lighting Load Stilt Floor Parking Load Common Area Calculation Total Area in Watts/S Connecte Unit Diversity Sq.ft. q. Ft. d Load (kW) 1 136 0 1 126 0.5 1 10 0.5 53448 0 0.5 27 0.5 53499 0 0.5 27 0.5 Total Load For Common area Load In kW ELECTRICAL LOAD CALCULATION- OTHER COMMON LOAD 272 Total Max. Total Load Demand on DG Load 0.0 0.0 63.0 63.0 5.0 5.0 13.4 13.4 13.4 13.4 95 95 5/6 PROZONE RESIDENTIAL AT COIMBAOTRE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Summary Total Connected Load for TOWER A Maximum Demand for TOWER A Total Connected Load for TOWER B Maximum Demand for TOWER B Total Connected Load for TOWER C Maximum Demand for TOWER C Total Connected Load for Common Load Maximum Demand for Common Load TOTAL CONNECTED LOAD FOR PROJECT TOTAL MAXIMUM DEMAND LOAD FOR PROJECT Consider Overall Load Factor Total Demand Load Demand Load Transformer Calculation 2050 703 2276 816 2914 1046 272 95 7512 2660 0.8 2128 3192 15 Maximum permissible transformer size 500 kVA 16 Total Transformers Required 7 Nos. % Loading on Transformers 91 % Total load on DG Consider P.F@0.8 228 286 Consider @ 80% Loading 357 KW KVA KVA A 17 18 2 2.1 2.2 kW kW kW kW kW kW kW kW kW kW kW kVA Proposed Transformer of 500 KVA x 7 Nos. DG set Calculation Proposed DG set is 400 KVA (Considered fire fighting load) SUMMARY- ELECTRICAL LOAD 6/6 POWER SAVING CALCULATION SHEET Power Saving Sheet For all Buildings Sr.No. 1 2 3 Description Rehab B-1 Rehab B-3C Rehab B-6 POWER SAVING CAL. TotalDemand Load 1200 #REF! #REF! Total Counted Load 435 478 591 Total % Saving 9.12 #REF! #REF! #REF! 1/28 POWER SAVING CALCULATIONS FOR TOWER A POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS Sr. no Description 1 Tower A 1BHK Flats Total for Flats Internal Flat Lighting No. of Details using 25W Energy No. of Details using 40W Conventional efficient T5 lights with incandescent Total No. of flourescent tube Lights and 20W Electronic Ballast and 9W CFL bulbs No. of Flats Tube Fixtures/Flat lights considered incandescent bulbs considered per considered for this project for per flat flat power saving Lighting Lighting Lighting load for all Lighting load/Flat load for all load/Flat flats flats 9 5 4 216 216 280 280 60480 60480 Common Areas Details for Flourescent Tube Lights Sr. no 1 2 3 4 Description Lift Lobby Staircases Passage Refuge Area TOTAL Area in Sq.ft Type of Light Lighting load 40 W 40 W 40 W 40 W 1680 1680 7920 0 11280 3617 8830 16372 28819 Details with using LED lights considered for this peoject Type of Lighting load Light 20W 840 9W 378 15W 2970 20W 0 4188 No. of Fixtures 42 42 198 0 282 For Flats (Considering 60% diversity) Total Lighting Load using 36 kW conventional lights Total Lighting Load using 21 kW power saving lights Note: For Internal flat lighting, we have considered the Energy efficient Lighting fixtures to be used with electronic ballasts against conventional flouroscent tube lights with conventional ballasts. This will save upto 50% of energy utilised for light fixtures. For Common areas we have considered LED light fixtures against conventional T5 light fittings. 161 161 34776 34776 Consumption per day using conventional lights (@ 8 hous) Consumption per day using power saving lights (@ 8 hous) 290 kW /day 167 kW /day For Common Areas Total Lighting Load using 11 flourescent lights Total Lighting Load using LED lights Consumption per day using flourescent lights (@ 12 hous) Consumption per day using LED lights (@ 12 hous) 4 kW Note: For Internal flat lighting, we have considered the Energy efficient Lighting fixtures to be used with electronic ballasts against conventional flouroscent tube lights with conventional ballasts. This will save upto 50% of energy utilised for light fixtures. For Common areas we have considered LED light fixtures against conventional T5 light fittings. kW 135 kW /day 50 kW /day Power saving by using VFD and APFC Panel on Lifts Sr. no Description TCL in kW 1 Lifts 45 MD using in conventional Lifts 27 Power consumption per day in kWH (@ 3 hr.) 81 MD using Lifts with Power consumption VFD and per day in kWH APFC panel 18.9 56.7 Sr. no 1 Sr. no 1 Power saving by using VFD and APFC Panel on Water Pumps with 90% Efficiency Using Water pumps with 60 % Effeiciency Using VFD and APFC Panel on Water Pumps with Power MD using in MD using consumption per Power consumption TCL in kW conventional TCL in kW VFD and day in kWH (@ per day in kWH manner APFC panel 6hr.) 38 19 114 38 13.3 79.8 Power saving by using MBBR type STP with VFD Using Conventional type STP Using MBBR Type STP with VFD Power Power consumption TCL in kW MD in kW consumption per TCL in kW MD in kW per day in kWH day in kWH 126 126 2520 126 100.8 2016 ENERGY SAVING FOR EXTERNAL LIGHTING Power Power Assumed Consumptio No. of days of usage Consumpti Operative Hours n / day in an year on / year / day (kWH) (kWH) Connected Load (kW) Demand Load (kW) 10 10 12 120 365 43800 3.0 3.0 12 36 365 13140 Using MH lamps (150W) 10 10 12 120 275 33000 Using LED lamps (45W) considered for this project 3.0 3.0 12 36 275 9900 Description Using MH lamps (150W) Using LED lamps (45W) Total Consumption Using Solar Power POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS Tower No. of units 1BHK 216 Total 216 No. of TCL per unit Geysers per (2kW per Geyser) unit 1 2 TCL For Total unit (2kW per Geyser) 432 Power Consumpti Power on for 50 % Consumptio Power Consumption of n / day (in per Year on Utility requiremen kWH for 1 Power (365 days) t per Year Hr / Day) on Utility Power 129.6 47304 23652 Power Consump tion for 50 % of requirem ent per Year on Solar Power (40 days) 3110.4 1 2 432 129.6 47304 23652 3110.4 Total Power Consumption per year on Utility Power 23652 kWH Total Power Consumption per year with Solar Power 3110.4 kWH Note: We have considered solar water heating for only 50 % of Hot water requirement as per availability of clear space on Terrace level POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS Sr. No. 1 Sr.No. 1 Tower No. of units No. of Geysers per unit TCL per unit (2kW per Geyser) 1 BHK Total 216 1 2 216 1 2 Total Power Consumption per year on Utility Power Total Power Consumption per year on Solar Power Power saving with Solar water heaters Description Area (sq.ft.) Usable Area kW Tower 1 (Terrace) 6512 3256 326 Power Consumptio n / day (in kWH for 1 Hr / Day) 432 432 50% (kW) 163 Power Power Consump Power Consumption Consumpti tion per / day on solar water on per Year Year on (in kWH for 1 Hr / on Utility Solar Day) Power (365 Power days) (275 days) 163 157680 44772 163 157680 44772 157680 kWH 44772 kWH 28 % Required (kW) 432 POWER SAVING SUMMARY Power consumption /year without Energy saving measures kWh Total Difference Consumption / in power year by using consumptio Energy saving n in kWh measures Sr.No Description Maximum Demand in (kW) 1 Common Lighting(parking + common areas) 4 49406 18343 31063 2 Internal Lighting 21 105961 60928 45033 56.7 29565 20696 8870 79.8 41610 29127 12483 3 4 Flat VFD and APFC Panel on Lifts VFD and APFC Panel on 90% Effcient Water 5 MBBR type STP with VFD 100.8 919800 735840 183960 7 External Lighting 10 43800 9900 33900 8 Water Heating on Solar TOTAL 163 157680 44772 112908 435 1347822 919605 428217 Total Demand Load 1200 Power Consumption in kWH / day 1200 Total Counted load ( where enregy saving tried) Total Un Counted load ( where enregy saving not tried) Consumption in kWH / year (Without Energy saving measures Consumption in kWH / year (With Energy saving measures Difference Percentage Saving 435 765 4696974 4268756 428217 9.1 % POWER SAVING CALCULATIONS FOR Tower B POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS Internal Flat Lighting Sr. no Description 1 2 Tower B 2 BHK Flats 3 BHK Flats Total for Flats No. of flourescent Total No. of tube lights Fixtures/Flat considered per flat 16 21 No. of incandescent bulbs considered per flat 9 11 7 10 No. of Flats 72 72 144 Details using 25W Energy Details using 40W efficient T5 lights with Conventional Tube Electronic Ballast and 9W CFL Lights and 20W considered for this project for incandescent bulbs power saving Lighting Lighting Lighting Lighting load for all load for all load/Flat load/Flat flats flats 500 640 1140 36000 46080 82080 Common Areas Sr. no 2 4 5 6 Description Lift Lobby Staircases Passage Refuge Area TOTAL Area in Sq.ft 6555 10511 12400 Details for Flourescent Tube Lights Type of Light Lighting load 40 W 40 W 40 W 40 W 3360 3360 5040 0 11760 29466 Details with using LED lights considered Type of Lighting Light load 20W 1680 9W 756 15W 1890 20W 0 4326 No. of Fixtures 84 84 126 294 For Flats (Considering 60% diversity) Total Lighting Load using 49 kW conventional lights Total Lighting Load using 28 kW power saving lights Consumption per day using conventional lights (@ 8 394 kW /day hrs.) Note: For Internal flat lighting, we have considered the Energy efficient Lighting fixtures to be used with electronic ballasts against conventional flouroscent tube lights with conventional ballasts. This will save upto 50% of energy utilised for light fixtures. For Common areas we have considered LED light fixtures against conventional T5 light fittings. 288 365 653 20736 26280 47016 Consumption per day using power saving lights (@ 8 hrs.) 226 For Common Areas Total Lighting Load using 12 flourescent lights Note: For Internal flat lighting, we have considered the Energy efficient Lighting fixtures to be used with electronic ballasts against conventional flouroscent tube lights with conventional ballasts. This will save upto 50% of energy utilised for light fixtures. For Common areas we have considered LED light fixtures against conventional T5 light fittings. kW /day kW Total Lighting Load using LED lights 4 Consumption per day using flourescent lights (@ 12 hrs.) 141 kW /day Consumption per day using LED lights (@ 12 hrs.) 52 kW /day kW Power saving by using VFD and APFC Panel on Lifts Sr. no Description TCL in kW MD using in conventional Lifts Power consumption per day in kWH (@ 3 hrs.) 1 Lifts 60 30 90 MD using Power Lifts with consumpt VFD and ion per APFC day in panel kWH 21 63 Sr. no 1 Sr. no 1 Power saving by using VFD and APFC Panel on Water Pumps with 90% Efficiency Using Water pumps with 60 % Effeiciency Using VFD and APFC Panel on Water Pumps Power Power MD using MD using in consumpt consumption per VFD and TCL in kW TCL in kW conventional ion per day in kWH (@ 6 APFC manner day in hrs.) panel kWH 33 198 33 19.8 79.2 33 Power saving by using MBBR type STP with VFD Using Conventional type STP Using MBBR Type STP with VFD Power Power consumpt consumption per TCL in kW MD in kW TCL in kW MD in kW ion per day in kWH (@ 20 day in hrs.) kWH 110 110 2200 110 88 1760 ENERGY SAVING FOR EXTERNAL LIGHTING Descriptio Connected Load Demand Load Assumed Operative Power Consumption / n (kW) (kW) Hours / day day (kWH) No. of Power days of Consumpt usage in ion / year an year (kWH) Using MH lamps (150W) 3 3 12 36 365 13140 Using LED lamps (45W) 1.5 1.5 12 18 365 6570 POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS Tower 2 BHK 3 BHK Total Power Consumpt ion for 50 % of No. of requirem No. of units Geysers per ent per unit Year on Solar Power (40 days) 72 2 4 288 86.4 31536 15768 2073.6 72 3 6 432 129.6 47304 23652 3110.4 144 5 10 720 216 78840 39420 5184 Total Power Consumption per year on Utility Power 39420 kWH Total Power Consumption per year with Solar Power 5184 kWH Note: We have considered solar water heating for only 50 % of Hot water requirement as per availability of clear space on Terrace level Power Power Power Consumptio Consumpt Consumpt n for 50 % ion per TCL per unit (2kW TCL For Total unit (2kW ion / day of Year on per Geyser) per Geyser) (in kWH requiremen Utility for 1 Hr / t per Year Power Day) on Utility (365 days) Power POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS Sr. No. 1 2 Tower 2 BHK 3 BHK Total No. of units No. of Geysers per unit Power Consumpt TCL per unit (2kW per ion / day Geyser) (in kWH for 1 Hr / Day) 72 2 4 72 3 6 144 5 10 Total Power Consumption per year on Utility Power Total Power Consumption per year on Solar Power Power saving with Solar water heaters 288 432 720 Power Consumpt ion / day on solar water (in kWH for 1 Hr / Day) 107 107 214 Power Power Consumpt Consumptio ion per n per Year Year on on Utility Solar Power (365 Power days) (275 days) 105120 157680 262800 262800 58850 22 29425 29425 58850 kWH kWH % Sr.No. 1 Sr.No 1 2 3 4 5 Description Tower B (Terrace) Description Common Lighting(parking + commonFlat areas) Internal Lighting VFD and APFC Panel on Lifts VFD and APFC Panel on 90% Effcient Water Pumps MBBR type STP with VFD 7 External Lighting 8 Water Heating TOTAL Area (sq.ft.) Usable Area kW 50% (kW) Required (kW) 8557 4279 428 214 720 POWER SAVING SUMMARY Power Maximum Total Consumption / consumption/year Demand in year by using Energy without Energy (Kw) saving measures saving measures 4 51509 18948 32561 28 143804 82372 61432 63 32850 22995 9855 79.2 72270 28908 43362 88 803000 642400 160600 2 13140 6570 6570 214 478 262800 1379373 58850 861043 203950 518330 Total Demand Load #REF! Power Consumption in kWH / day #REF! Total Counted load ( where enregy saving tried) Differenc e in power consumpt 478 Total Un Counted load ( where enregy saving not tried) Consumption in kWH / year (Without Energy saving measures Consumption in kWH / year (With Energy saving measures Difference Percentage Saving #REF! #REF! #REF! 518330 #REF! % POWER SAVING CALCULATIONS FOR Tower C POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS Internal Flat Lighting Sr. no 1 2 No. of No. of Details using 40W flourescent incandesce Conventional Tube Total No. of Description tube lights nt bulbs No. of Flats Lights and 20W Fixtures/Flat considered considered incandescent bulbs per flat per flat Tower C 2 BHK Flats 3 BHK Flats Total for Flats 16 21 9 11 7 10 Lighting load/Flat Lighting load for all flats 72 108 500 640 36000 69120 288 365 20736 39420 180 1140 105120 653 60156 1 2 3 Common Areas Details for Flourescent Details with using LED Description Area in Sq.ft Tube Lights lights considered for Type of Lighting Type of Lighting Light load Light load Lift Lobby 6781 40 W 3360 20W 1680 Staircases 10172 40 W 3360 9W 756 Passage 16469 40 W 7840 15W 2940 4 Refuge Area Sr. no TOTAL 40 W 33422 0 14560 Details using 25W Energy efficient T5 lights with Electronic Ballast and 9W CFL considered for this project for power Lighting Lighting load for load/Flat all flats 20W No. of Fixtures 180 84 84 196 0 5376 144 364 For Flats (Considering 60% diversity) Total Lighting Load using conventional lights 63 kW Total Lighting Load using power saving lights 36 kW 505 kW /day 289 kW /day Consumption per day using conventional lights (@8 hrs.) Consumption per day using power saving lights (@8 hrs.) For Common Areas Total Lighting Load using flourescent lights 15 kW Total Lighting Load using LED lights 5 kW Consumption per day using flourescent lights (@ 12 hrs.) Consumption per day using LED lights (@ 12 hrs.) 175 kW /day 65 kW /day Note: For Internal flat lighting, we have considered the Energy efficient Lighting fixtures to be used with electronic ballasts against conventional flouroscent tube lights with conventional ballasts. This will save upto 50% of energy utilised for light fixtures. For Common areas we have considered LED light fixtures against conventional T5 light fittings. Power saving by using VFD and APFC Panel on Lifts Sr. no Description 1 Lifts Power Power MD using MD using in consumpti consumpt Lifts with TCL in kW convention on per day ion per VFD and al Lifts in kWH (@ day in APFC panel 3 hrs.) kWH 75 37.5 112.5 26.25 78.75 Power saving by using VFD and APFC Panel on Water Pumps with 90% Efficiency Sr. no 1 Sr. no 1 Using Water pumps with 60 % Using VFD and APFC Panel on Power Power MD using in consumptio MD using consumpt TCL in kW conventiona n per day in TCL in kW VFD and ion per l manner kWH (@ 6 APFC panel day in hrs.) kWH 40 240 40 24 96 40 Power saving by using MBBR type STP with VFD Using Conventional type STP Using MBBR Type STP with VFD Power Power consumptio consumpt TCL in kW MD in kW n per day in TCL in kW MD in kW ion per kWH (@ 20 day in hrs.) kWH 135 135 2700 135 108 2160 ENERGY SAVING FOR EXTERNAL LIGHTING Descriptio Connected n Load (kW) Demand Load (kW) Power Power Assumed No. of days Consumpti Consumpt Operative of usage in on / day ion / year Hours / day an year (kWH) (kWH) Using MH lamps (150W) 3 3 12 36 365 13140 Using LED lamps (45W) 1.5 1.5 12 18 365 6570 POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS Tower 2 BHK 3 BHK Total Power Consumpt ion for 50 % of requireme nt per Year on Solar Power (40 days) 72 2 4 288 86.4 31536 15768 2073.6 108 3 6 648 194.4 70956 35478 4665.6 180 5 10 936 280.8 102492 51246 6739.2 Total Power Consumption per year on Utility Power 51246 kWH Total Power Consumption per year with Solar Power 6739.2 kWH Note: We have considered solar water heating for only 50 % of Hot water requirement as per Power Power Consumpt Power Consumpt ion for 50 TCL For No. of TCL per unit Consumpti ion per % of Total unit No. of units Geysers per (2kW per on / day (in Year on requireme (2kW per unit Geyser) kWH for 1 Utility nt per Geyser) Hr / Day) Power Year on (365 days) Utility Power POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS Sr. No. 1 2 Sr.No. 1 Sr.No 1 2 Tower Power No. of TCL per Consumpti No. of units Geysers per unit (2kW on / day (in unit per Geyser) kWH for 1 Hr / Day) 2 BHK 72 2 4 3 BHK 108 3 6 Total 180 5 10 Total Power Consumption per year on Utility Power Total Power Consumption per year on Solar Power Power saving with Solar water heaters Description Area (sq.ft.) Usable Area Tower C (Terrace) 10603 5301 Power Power Power Consumpt Consumpt Consumpt ion / day ion per ion per on solar Year on Year on water (in Utility Solar kWH for 1 Power Power Hr / Day) (365 days) (275 days) 288 648 936 130 135 265 kW 50% (kW) Required (kW) 530 265 936 POWER SAVING SUMMARY Maximum Power Total Difference Description Demand in consumptio Consumpti in power Common 5 63773 23547 40226 Lighting(parking + Internal Flat 36 184170 105393 78777 Lighting 105120 236520 105120 105120 35750 34 35750 37125 35750 kWH kWH % 3 VFD and APFC Panel on Lifts 78.75 41063 28744 12319 4 VFD and APFC Panel on 90% Effcient Water Pumps 96 87600 35040 52560 5 MBBR type STP with VFD 108 985500 788400 197100 2 13140 6570 6570 265 105120 35750 69370 591 1480366 1023444 456922 6 7 External Lighting Water Heating TOTAL Total Demand Load #REF! Power Consumption in #REF! Total Counted load ( 591 Total Un Counted load ( #REF! Consumption in kWH / Consumption in kWH / #REF! #REF! Difference #REF! Percentage Saving #REF! % POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS Sr. No. 1 2 3 Tower A (1BHK) B (2BHK) B (3BHK) C (2BHK) C (3BHK) No. of units 216 72 72 72 108 TCL per Power No. of unit (2kW Consumption / Geysers per day (in kWH for per unit Geyser) 1 Hr / Day) 1 2 3 2 3 2 4 6 4 6 129.6 86.4 129.6 86.4 194.4 Total 540 11 22 626.4 Total Power Consumption per year on Utility Power Total Power Consumption per year on Solar Power Power saving with Solar water heaters Power Consumption / day on solar water (in kWH for 1 Hr / Day) 163 214 265 Power Power Consumption Consumption per per Year on Solar Year on Utility Power (275 days) Power (365 days) 47304 31536 47304 31536 70956 44825 228636 228636 176550 77 176550 kWH kWH % 58850 72875 POWER SAVING CALCULATIONS FOR TOWER A POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS Internal Flat Lighting Description Total No. of Fixtures/Flat Sr. no 1 2 3 Tower A 1BHK Flats 2 BHK Flats 3 BHK Flats No. of No. of flourescent incandescent tube lights No. of Flats bulbs considered considered per flat per flat 9 16 21 5 9 11 4 7 10 Total for Flats Description Sr. no 1 2 3 Lift Lobby Staircases Passage TOTAL 216 144 180 540 Area in Sq.ft Common Areas Details for Flourescent Tube Lights Type of Light Lighting load 40 W 40 W 40 W 8400 8400 20800 16953 29513 45241 91707 Details with using LED lights considered for this peoject Type of Light 20W 9W 15W 37600 For Flats (Considering 60% diversity) Total Lighting Load using 149 kW conventional lights Total Lighting Load using power 85 kW saving lights Consumption per day using conventional lights (@ 8 hous) 1189 kW /day Consumption per day using power saving lights (@ 8 hous) 681 kW /day For Common Areas Note: For Internal flat lighting, we have considered the En efficient Lighting fixtures to be used with electronic ba against conventional flouroscent tube lights with convent ballasts. This will save upto 50% of energy utilised for light fixtu For Common areas we have considered LED light fixtures ag conventional T5 light fittings. efficient Lighting fixtures to be used with electronic ba against conventional flouroscent tube lights with convent ballasts. This will save upto 50% of energy utilised for light fixtu For Common areas we have considered LED light fixtures ag conventional T5 light fittings. Total Lighting Load using flourescent lights 38 kW Total Lighting Load using LED lights 14 kW Consumption per day using flourescent lights (@ 12 hous) 451 kW /day Consumption per day using LED lights (@ 12 hous) 167 kW /day Power saving by using VFD and APFC Panel on Lifts Sr. no 1 Sr. no 1 Sr. no 1 Description TCL in kW Lifts 120 72 216 MD using Lifts with VFD and APFC panel 50.4 Power saving by using VFD and APFC Panel on Water Pumps with 90% Efficiency Using Water pumps with 60 % Effeiciency Using VFD and APFC Panel on Water Pumps with Power MD using in consumption MD using TCL in kW conventional per day in TCL in kW VFD and manner kWH (@ APFC panel 6hr.) 55.5 333 111 38.85 111 Power saving by using MBBR type STP with VFD Using Conventional type STP Using MBBR Type STP with VFD Power consumption TCL in kW MD in kW TCL in kW MD in kW per day in kWH 126 126 2520 126 100.8 Description Sr. No. 1 Power MD using in consumption per conventional day in kWH (@ 3 Lifts hr.) Using MH lamps (150W) ENERGY SAVING FOR EXTERNAL LIGHTING Power Assumed Connected Demand Consumptio Operative Hours Load (kW) Load (kW) n / day / day (kWH) 10 10 12 120 2 3 Using LED lamps (45W) 3.0 3.0 12 36 Using MH lamps (150W) 10 10 12 120 Using LED lamps (45W) considered for this project 3.0 3.0 12 36 Total Consumption Using Solar Power 4 5 POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS Sr. No. 1 2 3 Tower No. of units No. of Geysers per unit 1 BHK 2 BHK 3 BHK 216 144 180 1 2 3 TCL per unit (2kW per Geyser) Power Consumptio n / day (in kWH for 1 Hr / Day) 2 4 6 432 576 1080 Total 540 6 12 Total Power Consumption per year on Utility Power Total Power Consumption per year on Solar Power Power saving with Solar water heaters Sr.No. 1 1 1 2088 Description Area (sq.ft.) Usable Area kW 50% (kW) Tower A (Terrace) Tower B (Terrace) Tower C(Terrace) 6512 8557 10603 3256 4279 5301 326 428 530 163 214 265 POWER SAVING SUMMARY Description Maximum Demand in (kW) Common Lighting(parking + common areas) 14 Sr.No 1 Power Total Difference consumption Consumption / in power /year year by using consumptio without Energy saving n in kWh Energy measures 164688 60838 103850 2 Internal Flat Lighting 85 433935 248693 185242 3 VFD and APFC Panel on Lifts 151.2 78840 55188 23652 4 VFD and APFC Panel on 90% Effcient Water Pumps 233.1 121545 85082 36464 5 MBBR type STP with VFD 100.8 919800 735840 183960 7 External Lighting 10 43800 9900 33900 8 Water Heating on Solar 642 762120 176496 585624 TOTAL 1236 2524728 1372037 1152692 Total Demand Load 2822 Power Consumption in kWH / day 2822 Total Counted load ( where enregy saving tried) 1236 Total Un Counted load ( where enregy saving not tried) 1586 Consumption in kWH / year (Without Energy saving measures 9471573 Consumption in kWH / year (With Energy saving measures 8318882 Difference 1152692 Percentage Saving 12.2 % ATIONS FOR TOWER A / T5 LIGHTS FOR ALL AREAS Lighting Details using 25W Energy Details using 40W Conventional efficient T5 lights with Tube Lights and 20W Electronic Ballast and 9W CFL incandescent bulbs considered for this project for power saving Lighting Lighting Lighting load for all Lighting load/Flat load for all load/Flat flats flats 280 500 640 60480 72000 115200 161 288 365 34776 41472 65700 1420 247680 814 141948 Details with using LED lights considered for this peoject Lighting load No. of Fixtures 4200 1890 7800 210 210 520 13890 940 flat lighting, we have considered the Energy ixtures to be used with electronic ballasts al flouroscent tube lights with conventional ve upto 50% of energy utilised for light fixtures. we have considered LED light fixtures against t fittings. ixtures to be used with electronic ballasts al flouroscent tube lights with conventional ve upto 50% of energy utilised for light fixtures. we have considered LED light fixtures against t fittings. s Power consumption per day in kWH 151.2 h 90% Efficiency FC Panel on Water Pumps with Power consumption per day in kWH 111 233.1 BBR Type STP with VFD Power consumption per day in kWH 2016 NG Power No. of days of usage Consumptio in an year n / year (kWH) 365 43800 365 13140 275 33000 275 9900 R WATER HEATERS Power Power Consumpt Power Consumption Consumptio ion per / day on solar water n per Year Year on (in kWH for 1 Hr / on Utility Solar Day) Power (365 Power days) (275 days) 163 214 265 157680 210240 394200 44772 58832 72892 641.8035 762120 762120 176496 23 176496 kWH kWH % Required (kW) 432 576 1080