HEALTH & SAFETY MANAGEMENT SYSTEM LOTO Process Application & Audit Process Flow Chart Tata Consumer Products Ltd Doc. No: TCPL/EHS/ANX – 160 E Rev. No/date: Issue. No/date: Supersedes: Effective date: 00/25th May 2021 01/25th May 2021 New Document 25th May 2021 Annexure Once the locks and tags are applied the PI will ask the isolation & the operation personnel to bring equipment / machine / process / system to zero energy state as per the Step-6 of LOTO process. Upon confirmation of zero energy state the PI will or may ask the operation personnel to try out. Once satisfied the PI will issue the PTW as per the Step-7 of LOTO process. The ME will assess the needs for the job and isolation. Then they will fill out PTW and the LOTO Implementation Checklist as per the Step - 1 of the LOTO process. Once the isolation is done the PI will ask the isolation personnel and others who will be on the job to apply there individual locks & tags as per the Step - 5 of the LOTO process. (Also Alternate LOTO if required) Upon receiving the PTW the ME will supervise the execution person (s) and perform the task as per the Step - 8 of the LOTO process. Once need for isolation is identified, the 1st section of LOTO implementation checklist i.e. "Energy details" will be filled in by the executive themselves. The Isolation personnel will turn off / shut down the energy sources and isolate the energy sources to the equipment / machine / process / system as per the Step - 3&4 of the LOTO process. Upon completion of the job the ME will approach the PI to close the permit. The PI will inspect the job site to ensure all personnel & tools are away from the job site as per the Step - 9 of the LOTO process. After filling the PTW and the LOTO Implementation checklist, the ME will request the PI to issue the Permit To Work (PTW). The PI will verify the details on the PTW and the LOTO Implementation Checklist and will inform the affected people & will call for suitable isolation personnel as per the Step - 2 of the LOTO process. Once the inspection is done the PI will ask the isolation personnel to restore the energy and the PTW will be closed thereafter as per the Step-10 of the LOTO process. OT faces issues with equipment / machine / process / system or If a scheduled preventive maintenance is due. They can do audit when any job where LOTO is applied is being carried out using the LOTO audit checklist by visting the site, checking the documents & by interviewing people. Authorized LOTO Auditors will conduct audit to check effectiveness of the LOTO process. They can also do audit when no job applying LOTO is happening by using the LOTO audit checklist, by checking the old documents and records and by interviewing persons who were involved in the audited instance. OT Operation Team ME Maintenance Executive PI PTW Issuer If the auditor (s) find everything in place and effective they will mention the same in the audit checklist and close the audit process. If the auditor (s) find gaps in the process they may ask the ME or the PI to act on it and continue doing the job. If any major gaps observed, then the PTW will be cancelled. If the auditor (s) find everything in place and effective they will mention the same in the audit checklist and close the audit process. If the auditor (s) find any gaps in the process, they will raise it to site management to act on, in case any major gaps observed no activity requiring LOTO should be allowed to happen till all such gaps are addressed. PTW Restricted: PRINTED COPIES OF THIS DOCUMENT ARE FOR REFERENCE ONLY. Permit to Work