Uploaded by Technical HSE

Declaration

advertisement
ENVIRONMENTAL MANAGEMENT PLAN
DECLARATION BY PROJECT PROPONENT/AUTHORIZED PERSON
I certify that the Environmental Management Plan (EMP) has been prepared with
my knowledge and I shall undertake the responsibility to ensure the
actions/measures/plans/pollution prevention and mitigation measures (P2M2)
stated in the EMP will be implemented. I have provided sufficient allocation for the
implementation of the EMP and P2M2.
Project Title:
“Proposed construction of six (6) storey building for anolyte process
catholyte/dechlorination/chlorine & hydrogen handling Plant for MalaySino Chemical Industries Sdn. Bhd. at Lot 4406, Kawasan Perindustrian
Teluk Kalong, Mukim Teluk Kalong, District of Kemaman, Terengganu
Darul Iman”.
Project Address/Location:
Malay-Sino Chemical Industries Sdn. Bhd.
Lot PT 4406, Kawasan Perindustrian Teluk Kalong,
24000 Kemaman,
Terengganu Darul Iman.
Tel: 09-8633529 Fax: 09-8633531
……………………………….
Sathish A/L K. Sukumaran
General Manager
Date:
Download