Prospecting Scheme PROSPECTING SCHEME FOR THE PROPECTING LICENSE OF LIMESTONE NEAR VILLAGE BAKOT LIMESTONE DEPOSIT AT DISTRICT ABBOTTABAD 1 File No.: MDW/AD/PL-Limestone (297)/2017 Name of Mineral/Lithology: Limestone Location Of Granted Lease: Near Village Bakot Acreage Of Lease Area: 99.173 District: Abbottabad Name of the Party/lessee: M/S Razvi Mining (Pvt) Prospecting Scheme 1. Date of Offer letter: 25th February 2021 2. Site/Location/Acreage of the Area: Covering 99.173 acreages near village and Union Council Bakot Tehsil and District Abbottabad. 3. Nature of a Mineral Prospecting: Limestone 4. The Prospecting Method To Be Adopted: The open mining system will be adopted 5. Details of Equipment/Machinery To Be Used: For the execution of mining, the following machinery and types of equipment will be mobilized I. II. Earth Movers including Excavator, Jackhammer and Tractor Trolly For dislocation/cutting a Pneumatic Hand Drilling Machine III. Tripod IV. Double drum winch V. Wheelbarrows and other conventional helpful tools used in developing of open mining Quarry 6. Staff To Be Employed: The following technical and non-technical staff will be employed for running a smooth mining operation I. Mine manager II. Site incharge III. Drilling Crew IV. Heavy Machinery operators V. 2 Security Guard VI. Cook VII. Others Prospecting Scheme 7. Facilities To Be Provided To The Staff/Labour: All possible and basic facilities will be provided to the staff/labour on the site like health, drinking water, sanitation, daily food, accommodation, etc. 8. Phases Of Prospecting Operations: Ist Phase: In this phase exploring and searching of location of granite within lease by keeping both the quality and quantity of the said mineral and also easily accessibility for running smooth work and its transportation. For this already site is proposed and shown in the scheme. 2nd Phase: In this phase the mobilization of heavy and others machineries and mining equipments/tools. Beside this the construction of approach and access road to location as described in phase 1 and the construction of labor camp. 9. Road/Labour Camp To Be Constructed: The Main paved road namely Mansehra-Chilas road is cut across the said lease. Approach/Access road will be constructed and also labour camp will be constructed if need 10. Estimation Expenditures: The below are the estimated expenditures for the completion of the said phases a Cost of Machinery/Equipments: Rs: 60, 0000/ approx. b Cost of Construction of Road/Labor Camp: Rs: 5, 00,000/ approx. c Cost Facilities To Be Provided To The Staff: Rs: 3, 50,000/ approx. d Wages of Staff: Rs: 2, 50,000/ approx. e Miscellaneous Cost: Rs: 5, 00,000 approx. 11. Proved and Probable reserves: Mineral reserve estimation already discussed in the geological report. 3 Prospecting Scheme PREPARED BY Tufail Ahmad Registered Geologist Directorate General of Mines And Mineral KhyberPakhtunkhwa Name of Lessee M/S Razvi Mining (Pvt) Limited Village Bakot District Abbottabad 4