Uploaded by jed

702-1M - SECOND FLOOR MEDICAL GAS PLAN - ZONE 1

advertisement
1
2
3
4
5
6
7
ELEC
2410
ZONE 1
POSTPARTUM
TOILET 5
2238
POSTPARTUM
TOILET 4
2240
RB
POSTPARTUM
TOILET 1
2246
POSTPARTUM
TOILET 2
2244
POSTPARTUM
TOILET 3
2242
4.9
ELEVATOR
SHAFT 2
9007
3/4" MA
POSTPARTUM 6
2036
POSTPARTUM 4
2040
POSTPARTUM 2
2044
POSTPARTUM 3
2042
CORRIDOR
2986
3/4" O
3/4" MA
1/2" N2O
RESOURCE
CENTER
1055
3/4" MV
1/2" O
3/4" MV
1/2" N2O
1/2" O
ZVB#2-2
CALL
2324
3/4" MV
1/2" MA
1/2" O
1/2" MA
1/2" N2O
1" MV
2"
1/
CLEAN SUPPLY
2319
1/2" O
TOILET
2321
PRIVATE
NURSERY (-)
2339
HSKP
2327
1/2" MA
1/2" O
D
3/4" MA
SOILED
2330
1/2" O
3/4" MV
"
/2
A 1
M
O
4"
3/
3/4" MV
1/2" MA
1/2" O
TOILET
2305
L.8'
O
NUTRITION
ALCOVE
2309
LDR 6
2001
ZVB#2-3
1/2" O
1/2" MA
3/4" MV
AAP#2-6
AAP#2-3
AAP#2-4
LDR 5 TOILET
2203
OFFICE
2316
2
CORRIDOR
2981A
D
OFFICE
2359
1/2" O
LINEN ALCOVE
2331
X6
This document may be an electronic file or may
be printed from an electronic file provided to
the user. It is the sole responsibility of the user
to ensure that the content and quality is
consistent with the content and quality of the
paper documents on file at BWBR.
I hereby certify that this plan, specification, or report was prepared by
me or under my direct supervision and that I am a duly Licensed
Professional Engineer under the laws of the State of Minnesota
RA
CORRIDOR
2983A
OFFICE
2314
C
XA
3/4" MV
1/2" MA
1/2" O
1/2" MA
3/4" MV
2"
1/
3/4" MA
1/2" MA
0412603-001
M'
V
M
DICT
2304
TOILET
37
bwbr.com
XB
1/2" O
V
M
3/4" MV
HALLWAY
2985
WOMEN'S
LOCKER
2310
651.222.3701
LDR 6 TOILET
2201
CLEAN SUPPLY
2306
4"
3/
3/4" MV
3/4" MA
TRIAGE 1
2004
SOIL
2308
HALLWAY
2984B
NURSE STATION
2334
3/4" MV
POSTPARTUM 12
2025
CORRIDOR
2983C
ELEC CLOSET
2320
HALLWAY
2987
ZONE 1
Saint Paul, MN 55102
RB.5
3/4" MA
PROVIDE
BACK FEED
OUTLETS
ON WALL
FOR 02 AND
MA SYSTEMS
NURSERY
2338
POSTPARTUM
TOILET 11 (ADA)
2227
TOILET
2322
AAP#2-5
380 St. Peter Street, Ste. 600
Consultants
3/4"WAGD
3/4" O
1 1/4" MV
1/2" O
3/4" MV
1/2" MA
NURSERY
2338
1/2" MA
1/2" N2O
3/4" MV
1/2" MA
ZONE 2
C-SECTION
2347
ZVB#2-6
1/2" O 1/2" MA
1/2" N2O 3/4" MV
STAFF
2323
3/4" MV
3/4" MA
1/2" O
POSTPARTUM 11
(ADA)
2027
3/4" MV
1/2" O
RF
TRIAGE 2
2002
PRIVATE
NURSERY
2340
POSTPARTUM 10
2029
CONSULT
2349
1/2" MA
WORKROOM
2342
1/2" MA
3/4" MV
1/2" O
3/4" O
3/4" MA
1 1/2" MV
1/2" N2O
1/2" O
1/2" MA
CAP
PIPING
B
1 1/4" MV
CALL
2326
ANTE ROOM
2336
RC
WAIT
2303B
3/4" O
NUT
2355
1/2" O
1/2" MA
CORRIDOR
2989
3/4" O
3/4" MA
3/4" MV
NURSE STATION
2346
POSTPARTUM
TOILET 12
2225
CONFERENCE
2407
DN
C-SECTION
2313
POSTPARTUM
TOILET 9 (ADA)
2231
3/4" O
STAIR 2
1957
ZVB#2-1
1/2" O
3
RECP
2303
STAIR 2A
1960
AAP #2-1
POSTPARTUM
TOILET 10
2229
ELEVATOR
SHAFT 2C
9011
UP
1 1/2" MV
POSTPARTUM 9
(ADA)
2031
C
SERVICE
ELEVATOR 4
9028
3/4" MA
SOIL
2357
4
1 1/4" MV
1/2" O
3/4" MV
B
POSTPARTUM 5
2038
3/4" MA
1/2" MA
3/4" MA
POSTPARTUM 7
2034
3/4" O
1" MV
3/4" O
1" MV
3/4" O
HSKP
2030
POSTPARTUM 8
2032
3/4" O
3/4" MA
1" MV
FUTURE
ELEVATOR 5
9029
1/2" O
3/4" O
1" MV
1 1/4" MV
3/4" MA
3/4" MV
3/4" O
3/4" MA 3/4" O
POSTPARTUM 1
2046
R1
2011 Expansion
and Remodel
A
3/4" MV
POSTPARTUM
TOILET 6
2236
1/2" MA
POSTPARTUM
TOILET 7
2234
A
POSTPARTUM
TOILET 8
2232
M
5
1/
2"
A
3/4" MA
ZONE 2
STORAGE
2318
CORRIDOR
2983A
CAP
PIPING
ZVB#2-5
ZVB#2-4
CORRIDOR
2982B
CORRIDOR
2991
LDR 10 TOILET
2223
3/4" MV
LDR 8 TOILET
2219
1/2" O
3/4" MV
1/2" O
1/2" O
LDR 2 TOILET
(ADA)
2209
1/2" MA
UP
DN
LDR 8
2019
2"
1/
O
2"
1/
3/4" MV
LDR 1
2011
BIRTHING TUB 2
2217
LDR 2 (ADA)
2009
4"
3/
A
M
V
M
X4
X3.9
2"
1/
LDR 3 (-)
2007
3/
4"
M
A
4"
3/
V
M
4"
3/
4"
3/
A
M
X5.2
R ON
O
F TI
T
Y
O RUC
L
N T
N
O
S
N
CE
O
N
C
E
ER
F
RE
R
FO
LDR 3 TOILET
2207
X2
10'
F
F
This Sheet may be a
Reduced Copy.
The bar above is 1" long on a Full Size Sheet.
Drawing Scales apply to Full Size Sheets.
9.2
9'
L.4
L
K.5
K
J.9
J.1 J
H
G
F
E
D
09/20/2013
E
Unoccupied
Unoccupied
O
Date
11'
O
3/
4
3/ " M
4" V
O
42401
AS-BUILTS
X3
1/2" MA
LDR 7
2017
1
CORRIDOR
2982A
3/4" MV
BIRTHING TUB
2211
LDR 9
2021
LDR 4
2005
Reg. No.
Issued For
Item
1/2" O
1/2" MA
3/4" MV
1/2" MA
1/2" MA
LDR 10 (-)
2023
L'
1/2" O
1/2" O
CAP
PIPING
E
LDR 9 TOILET
2221
NUTRITION
2328
TOILET
2217A
Darin May, P.E.
Date 09/20/2013
LDR 4 TOILET
2205
3/4" MA
1.8
Name
X5
LDR 5
2003
3/4" O
1" MV
CORRIDOR
2982C
ZONE 3
B.2
B
A.6
A
ZONE 2
C
7'
G
1
7.2'
X1
ZONE 1
8'
SECOND FLOOR MEDICAL GAS PLAN - ZONE 1
1/8" = 1'-0"
G
KEYPLAN
Date
Drawn
09/20/2013
TNH
Comm. No.
Checked
3.2011147.00
DM
Sheet Title
SECOND FLOOR
MEDICAL GAS PLAN ZONE 1
H
H
Copyright BWBR
9/19/2013 11:17:21 AM
Sheet No.
1
2
3
4
5
6
7
702.1M
Download