Contractor: Reynolds Engineering Australia Project: ALL SA SITES Project Address: ALL SA SITES SMWS No: 04 Use of Power Tools Revision: 03 Plant Needed for this Activity: ☒ Not classified as High Risk Construction Work, as per W.H.S. Regulation 2011 [s291]. ☐ Involves a risk of a person falling more than 2m, as per W.H.S. Reg 2011 [s291a]. ☐ Is carried out in an area at a workplace in which there is any movement of powered mobile plant as per W.H.S. Reg 2011 [s291(o)] ☒Platform Ladder ☒ EWP ☒ Duct Lifter ☐ High Pressure Water Pump or Air Compressor ☐ Oxy & Acetylene Bottles & Equipment Equipment Needed for this Activity: ☒ Hi-Viz L/S Shirt ☒Steel Capped Boots ☒ Hard Hat ☒ Safety Glasses ☐Gloves ☐ Hearing protection ☐ Dust Mask High Risk Construction Work: Select PPE appropriate for Power Tool Persons Responsible for Compliance of SMWS: ☐ Acetylene ☐ R410a ☐ Duct Sealer ☐ Armaflex ☐ Flux Paste ☐ Silver Solder ☐ PVC Cement ☐ Oxygen ☐ Nitrogen ☐ Priming Fluid ☐ High Pressure Water Pump or Air Compressor – Current Test & Tag, Visual inspection, Plant & Equipment Register ☐Oxy & Acetylene Bottles & Equipment – Current Test & Tag, Visual Inspection, Plant & Equipment Register ☐ Extension Lead / Power Tools – Current Test & Tag, Visual Inspection, Plant & Equipment Register ☐ EWP – Daily Log Book and maintenance instructions – Haulotte, Plant & Equipment Register ☐ Duct Lifter - Visual inspection before each use, Plant & Equipment Register ☐ Platform Ladder – Visual inspection before each use, Plant & Equipment Register ☐ Construction Induction ☒ Site Specific Induction ☒ EWP Ticket ☐ HRW Licence ☐ Hot Works ☐ Working & Heights ☐ Confined Space Name: Mark Reynolds Position: Site Supervisor Signature: Persons Responsible for Reviewing SMWS: Name: Mark Reynolds S.D.S. Sheets Required: Plant and Equipment Inspections Required: Training or Licensing Required for this Activity: Permits Required: Position: Site Supervisor Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 1 Signature: Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 W.H.S. Act & W.H.S. Regulations 2011, Hazardous Material Tasks Code of Practice 2011: Managing Risks of Falls 2011, Managing Legislation, Aust. Standards or Codes of Practice Consulted: Risks of Plant in Workplace 2013, Managing Noise and Preventing Hearing Loss at work code of Practice 2011, Falling Objects code of Practice 2011, P.P.E in Building Industry 2010 Codes of Practice. HIERARCHY OF CONTROL C = Consequence L = Likelihood Hierarchy of Control 5 = Catastrophic Death, disablement, significant incident, unacceptable risk, significant financial cost. 5 = Almost Certain Could occur in most circumstances 4 = Major Extensive injuries leading to lost time, major risk-damage to plant and equipment, major financial cost for repairs/reinstatement. 3 = Moderate Medical treatment, medium risk-damage to plant and equipment, medium financial cost for repairs/reinstatement. 2 = Minor First Aid treatment, minor risk-damage to plant and equipment, minor financial cost for repairs/reinstatement. 1 = Insignificant: No injuries, slight damage, low financial cost for repairs/reinstatement. 4 = Likely May probably occur in most circumstances 1 = Elimination Modify the process method or material to eliminate the hazard completely 2 = Substitution Replace the material, substance or process with a less hazardous one 3 = Separate Isolate the hazard from the person by safeguarding or by space or time. 3 = Possible May occur at some time 4 = Redesign/Engineering Controls Redesign or modify the plant or process to reduce or eliminate the risk 2 = Unlikely Could occur at some time 5 = Administration Adjust the exposure time or conditions or process by training, procedure, signs etc 1 = Rare May occur only in exceptional circumstances 6 = PPE Use appropriately designed and properly fitted equipment where other controls are not practicable or are accepted SAFETY REFERENCE MATRIX *The following qualitative risk analysis matrix has been taken from AS/NZS 4360:1999 Risk Management Standard. This matrix is used to arrive at the “Level of Risk” score throughout the risk analysis and is presented here for reference. Consequences Likelihood 5 4 3 2 1 Catastrophic Major Moderate Minor Insignificant 5 - Almost Certain 25 20 15 10 5 4 – Likely 20 16 12 9 4 Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 2 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 3 - Possible 15 12 9 6 3 2 - Unlikely 10 8 6 4 2 4 3 2 1 Task Rating Step 2 Check All Electrical Equipment Consequences Step 1 Clear Work Area of Debris. Likelihood Potential Hazards Before Control Measures Untidy Work Area Slips, Trips and Falls 3 3 9 Faulty Equipment Electrocution 3 5 15 Control Measures After Control Measures All Personnel to ensure that work areas are clear of Debris, maintaining good housekeeping practices eg. Clean as you go. Wear gloves - Sufficient lighting - Sufficient room so operator will not be knocked or need to over-reach - Area clear of debris, cut-offs etc - Ground / floor even, stable clear of trip hazards - Work pieces are able to be secured and stable All Electrical Equipment to be Inspected for current test and tag (3 monthly) and for visible damage. Ensure electrical equipment is plugged into ELCB or portable RCD with current test tag Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 3 3 6 Supervisor, Worker 10 Supervisor, Worker 2 2 Responsibility Task Rating Sequence of job steps Consequences 5 Likelihood 1 – Rare 5 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 Step 3 Electrical leads to be elevated from trafficable and wet areas. Incorrect Use of Leads Electrocution 3 5 15 Extension leads should only be regarded as a temporary arrangement for power distribution. Run extension cords and power leads around the walls and around the backs of desks. Do not run cords across walk or trafficable areas, under chairs or furniture, under carpets or between rooms. Use heavy-duty extension cords outdoors and use a residual current device (RCD) for personal protection. Do not squash extension cords between furniture, walls, and windows. Keep cords away from hot or wet surfaces. Inspect cords to check that they are in good condition. Discolouration can indicate overheating due to overloading; this needs to be reported and checked to see if it is still safe to use. Extension leads and power cords are separate electrical items and need to be inspected separately. Even leads with moulded plugs and sockets may have manufacturing defects and should be checked for correct wiring. To help reduce subsequent testing costs, tested leads can be attached to a portable electrical appliance and tested as an integral part of the item, providing a visual inspection of the lead is still done. If a lead is cut or damaged it must be replaced unless it can be repaired by a suitably licensed person Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 4 2 5 10 Supervisor, Worker Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 Access by Unauthorised User Step 4 Operation Injury to Untrained Operator 3 4 12 Approve Operator Power Tools should not be used unless the operator is trained in the tool’s safe use. Do not permit anyone to operate, or have access to a power tool without Supervisor Authorisation. 2 2 4 Supervisor, Worker 10 Supervisor, Worker The manufacturers specifications and operating instructions for the model of tool should be read, understood and complied with at all times Ensure correct tool has been selected for the task Use caution when providing power to equipment. Example: - Do turn depress trigger when turning power on - Do not carry tool with trigger depressed. - Only operate when at work station - Do not leave unattended when plugged into power. - Unplug and store tool when not in use. Ensure Safety Guards and Handles are in place. Step 4 Operation Safe Use of Power Tool Sparking 3 Personal Injury Fire/Explosion/Burns 5 15 Ensure warning signs displayed are clearly visible to all workers and members of public. Barricade if necessary. If working aboveground, place barricade around area below hot work Sweep floor clean, wet down any combustible floors or cover them with sheet metal or similar. Move combustible material at least 10m away. Cover what cannot be moved with a fire proof blanket or metal guard. Remove any debris from immediate area, to avoid trip hazards. Ensure proper ventilation is available within the hot work area. Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 5 2 5 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 Ensure any flammable liquids, vapors, gases or dust are prevented from escaping from a hazardous area to a hot work location. Fire extinguisher to be within easy reach of work area, for any stray sparks. Make sure any firefighting equipment (Sprinkler system, hoses, extinguishers are in service and suitably located. Make sure you know how to use the equipment and what the fire emergency procedure is. . When using power tool or working overhead safety glasses should be worn at all times. Step 4 Continued Operation Safe Use of Power Tool Foreign Object in Eye 3 4 12 Personal Injury Eye Injury Safety Glasses should be certified to AS/NZS 1337.1:2010 Standards and must provide a minimum of Low Impact Protection. 2 2 4 Supervisor, Worker 2 2 4 Supervisor, Worker High impact face shield must be used if site requirements deem. Face Shields should be certified to AS/NZS 1337.1:2010 Standards and must provide a minimum of Medium Impact Protection. Excessive Noise 3 Personal Injury Hearing Loss 4 12 When working on a site where Noise level exceeds Safe Noise Threshold of 90dB(A) hearing protection must be a minimum of Class 3. When using Power Tool Uncorded Earplugs with a minimum of Class 5 Hearing Protection should be worn Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 6 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 Step 4 Continued Operation Safe Use of Power Tool Projectiles/Sharp Implements 3 4 12 Personal Injury Lacerations Gloves should be worn if appropriate to the task. 2 2 4 Supervisor, Worker Gloves should be tight and form-fitting, and of a variety specifically chosen to reduce the risks of entanglement. Gloves should be certified to Australian Standards AS/NZS 2161:2005. Gloves applicable to the Category EN388 – Mechanical Risks should be worn when operating Hammer Drill. Inhalation of fumes and dust particles If using Power Tool that creates dust or fumes, ensure P2 Respirator is worn at all times Personal Injury Respiratory Infection and /or Toxification Step 5 Completion of Works Storage of Power Tool Access by Unauthorised User 3 Injury to Untrained Operator 4 12 Ensure Power Tool is placed in lockable tool box . Disconnect from source and place in appropriate storage container provided by manufacturer Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 7 2 2 4 Supervisor, Worker Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 ENVIRONMENTAL REFERENCE MATRIX Consequences Likelihood 5 4 3 2 1 Disaster Environmental Harm Environmental Nuisance Insignificant Effect Day to day issue 5 - Almost Certain 25 20 15 10 5 4 - Likely 20 16 12 9 4 3 - Moderate 15 12 9 6 3 2 - Unlikely 10 8 6 4 2 1 - Rare 5 4 3 2 1 1. Elimination 2. Substitution 3. Separate 4. Engineering. Design / Redesign 5. Administration. Training 6. PPE. Environmental Controls Environmental Control Measures After Control Measures Responsibility Task Rating Before Control Measures Environmental Hierarchy of Control Conseque nces Potential Hazards Disaster Environmental Harm Environmental Nuisance Insignificant Effect Day to day issue Likelihood Activity that could harm the Environment & create an environmental hazard 5 4 3 2 1 Task Rating Almost certain Likely Moderate Unlikely Rare Conseque nces 5 4 3 2 1 Environmental Consequence of Risk: Likelihood Environmental Likelihood of Risk: N/A Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 8 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 Monitoring Periods Table Risk Rating 16-20 Extreme Monitor Works Work not to commence, review control measures immediately Record NA work does not progress NA 10-15 5-9 1-4 High Senior supervisory management to ensure all controls are in place before work commences. Strict monitoring of control measures. Work shall be conducted with Supervision and / or co-worker i.e. person involved with activity must not work alone. Responsibilities must be defined and understood by those involved before commencing work. Minimal Supervision required. Control by routine procedures Medium Low Daily ESWMS Inspection Sheet Weekly ESWMS Inspection Sheet Monthly ESWMS Inspection Sheet MONITORING This SWMS will be monitored using the inspection sheet to the periods in the table above, a copy will be forwarded to the principal Contractor Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 9 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 Personnel Consulted during Review Process of SWMS: Insert Name & Initial Workers to be consulted No Change Minor Change 1 ☒ ☐ ☐ ☐ 20/06/20 2 ☒ ☐ ☐ ☐ 12/04/21 3 ☒ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ Date of review Review Number Mark Reynolds 09/04/19 Mark Reynolds Mark Reynolds Major Change Reviews of the SWMS against the following criteria as a minimum to ensure: Safe and practicable engineering aspects of the work activity and Safe and appropriate work methodologies to complete the works. Safe work practices and appropriate legislation Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 10 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 I have had an opportunity to contribute to and have read and understood the content of this Safe Work Method Statement: Name Company Signature Date Mark Reynolds Reynolds Engineering Australia 13/09/21 Peter Rowland Reynolds Engineering Australia 13/09/21 Tony O’Dea Reynolds Engineering Australia 13/09/21 Jordan Reynolds Reynolds Engineering Australia In signing this declaration I am acknowledging that I have read and understand the contents of this Safe Work Method Statement and accompanying Site Safety Plan and I agree to implement and follow the guidelines identified in the above mentioned control measures. Additions that the workforce added to make this a workable and safe operation. Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 11 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 ADDITIONAL ACTIONS REQUIRED The persons listed above have signed attended to a toolbox talk on the risk assessment and have had input and made adjustments if it was necessary to the work procedure, understand the requirements to carry out the task in a safe and expeditious manner. The persons listed above have signed attended to a toolbox talk on the risk assessment and have had input and made adjustments if it was necessary to the work procedure, understand the requirements to carry out the task in a safe and expeditious manner. Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 12 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095 Project Contact List IN CASE OF EMERGENCY CALL 000 If Not Life Threatening Call Nearest Medical Centre Insert Nearest Medical Centre Here Reynolds Engineering Australia Site Supervisor – Mark Reynolds - 0409 670 361 Document ID: Original release date: Current version: 14/03/2017 2.0 Document Title: Originally released by: Document owner: SWMS 04 – Use of Power Tools Don D’Angelo Reynolds Engineering Date of last update: 12/04/2021 Page: 13 Reynolds Engineering ABN : 35 678 900 711 12 Kindale Court Pooraka SA 5095