Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
On-Site Battery Backup Testing Report
Battery Model:
LFELI-48100TB
Battery Serial No:
TFP22012348100C0859
Testing Location:
Islamia Kamil Madrahsa, Uttar Badda
NTTN User:
Summit Communications Ltd
Required User:
Summit Communications Ltd & Fiber@Home Ltd.
Testing Dept:
Info-Sarker Phase 3 Project
Date of Testing:
May.19~May.20, 2022
1
Info Sarkar Phase3 Project
1.
LFELI-48100TB [V:01, 2022052301]
Information
Description of commodity (Name, Model, Quantity…)
Lithium-ion Battery
LFELI-48100TB 01Pcs
Procuring Entity (Name, Address…)
Info-Sarker Phase 3 Project
Bangladesh Computer Council (BCC), Information and Communication Technology Division, ICT
Tower, Plot#E-14/X, Agargaon, Dhaka-1207
Supplier (Name, Address…)
Ingen Technology Limited
Red Crescent Concord Tower (4th Floor), Mohakhali C/A, Dhaka-1212, Dhaka-1212
Item
Satisfactory
Non-conforming
Battery Backup
Test
2
Rejected
Subject to PE’s Evaluation
Info Sarkar Phase3 Project
2.
LFELI-48100TB [V:01, 2022052301]
Battery Backup Test - On Site (Qty: 01 Pcs)
Model
48100T
B
Serial
No
TFP22012348100C08
59
Nominal
Capacity
100Ah
Qty
01
Require
d Dept
Summit
Communications Ltd &
Fiber @Home Ltd
Test Date
May.19~May.2
0, 2022
Equipment
Charging Device: Huawei Rectifier Cabinet
Backup Uttar
Test
Badd
Location a
Test No.
01
Discharging Device: DC Load Device
Testing
Environment
al Conditions
Backup Test
Procedures
Ambient Temperature: (36±3)°C; Relative Humidity: 75%~85%
N.B.: Temperature: (25±5)°C
1) Set battery aside for 30 min
2) Discharge battery with 0.8~1.5A load current for 20 Hrs
3) Charge battery with 10~40A current charging, Charge about 30% of the rated capacity.
Sl No.
Voltage
Discharge
before
Current (A)
Discharge Time
Discharge
Criterion
Result
19.36~22.66
Discharge
PASS
AH
Capacity ≥ 20AH
Capacity (AH)
backup
test
01
50.99
0.88~0.9A
22h40min
3
Info Sarkar Phase3 Project
3.
LFELI-48100TB [V:01, 2022052301]
Battery Backup Test Result
Sl No.
Date & Time
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
19/05/2022 03:35PM
19/05/2022 04:07PM
19/05/2022 04:37PM
19/05/2022 05:07PM
19/05/2022 05:36PM
19/05/2022 06:07PM
19/05/2022 06:37PM
19/05/2022 07:07PM
19/05/2022 07:36PM
19/05/2022 08:07PM
19/05/2022 08:37PM
19/05/2022 09:07PM
19/05/2022 09:38PM
19/05/2022 10:07PM
19/05/2022 10:35PM
19/05/2022 11:17PM
19/05/2022 11:36PM
20/05/2022 00:35AM
20/05/2022 01:06AM
20/05/2022 01:35AM
20/05/2022 02:09AM
20/05/2022 02:35AM
20/05/2022 03:05AM
20/05/2022 03:35AM
20/05/2022 04:05AM
20/05/2022 04:35AM
20/05/2022 05:05AM
20/05/2022 05:35AM
20/05/2022 06:05AM
20/05/2022 06:44AM
20/05/2022 07:05AM
20/05/2022 07:20AM
20/05/2022 07:35AM
20/05/2022 08:07AM
20/05/2022 08:38AM
Battery Display
Voltage (V)
Battery Discharge
Current (A)
50.76
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
50.14
49.93
49.84
49.84
49.84
49.83
49.84
49.83
49.83
49.83
49.83
49.83
49.82
49.82
49.81
49.81
49.81
49.81
49.8
49.8
49.79
49.79
49.79
49.78
49.78
49.78
49.78
49.78
49.78
49.78
49.78
49.78
49.78
49.78
4
Rectifier
Display Voltage
(V)
52.8
50.2
50
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.9
49.8
49.8
49.8
49.8
49.8
49.8
Rectifier Load
Current (A)
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
Sl No.
Date & Time
Battery Display
Voltage (V)
Battery Discharge
Current (A)
Rectifier
Display Voltage
(V)
Rectifier Load
Current (A)
36
37
38
39
40
41
42
43
44
20/05/2022 09:07AM
20/05/2022 09:36AM
20/05/2022 10:06AM
20/05/2022 10:38AM
20/05/2022 11:08AM
20/05/2022 11:38AM
20/05/2022 12:06PM
20/05/2022 12:42PM
20/05/2022 02:07PM
49.77
49.77
49.77
49.77
49.77
49.77
49.77
49.77
49.77
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
49.8
49.8
49.8
49.8
49.8
49.8
49.8
49.8
49.8
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
Observing Disclaimer
In accordance with PE’s Instruction, InGen involved their resources at the NTTN test premises during battery
backup test and took the real time technical measurements. During the battery backup test, did not exclude
any device, action, or exclusion for the results of the battery backup analysis.
5
Info Sarkar Phase3 Project
4.
LFELI-48100TB [V:01, 2022052301]
Photos
6
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
7
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
8
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
9
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
10
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
11
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
12
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
13
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
14
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
15
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
16
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
17
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
18
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
19
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
20
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
21
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
22
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
23
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
24
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
25
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
26
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
27
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
28
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
29
Info Sarkar Phase3 Project
LFELI-48100TB [V:01, 2022052301]
30
Info Sarkar Phase3 Project
5.
LFELI-48100TB [V:01, 2022052301]
Time Sheet
Name
Monzur & Tanvir, InGen
Ashok Kumar Biswas, SCL
Mr. Atiq & Mr. Masud, BCC
Mr. Atiq & Mr. Masud, BCC
Ashok Kumar Biswas, SCL
Monzur & Tanvir, InGen
Monzur & Tanvir, InGen
Monzur & Tanvir, InGen
Mr. Mostofa, SCL
Mr. Mostofa, SCL
Date
19/05/2022
19/05/2022
19/05/2022
19/05/2022
19/05/2022
19/05/2022
20/05/2022
20/05/2022
20/05/2022
20/05/2022
Time
01:30-02:15PM
01:30-02:30PM
01:30-02:40PM
02:40-04:00PM
02:40-04:00PM
02:40-12:00AM
12:01-02:30PM
02:30-03:30PM
01:50-02:30PM
02:30-03:30PM
Description
Travelling
Travelling
Travelling
Working
Working
Working
Working
Travelling
Working
Travelling
Hours
45 Min
1 Hr
1 Hr 10 Min
1 Hr 20 Min
1 Hr 20 Min
9 Hr 20 Min
14Hr 30 Min
1 Hr
40 Min
1 Hr
Note: Both travelling time and working time are included
THIS BATTERY BACKUP TEST REPORT ONLY REFLECTED OUR ACTUAL FINDINGS. THE BACKUP TESTING WAS DONE
TO THE BEST OF OUR KNOWLEDGE AND ABILITY AND WITH DUE CARE. THE FINDINGS ARE VALID AS FOR TIME
PLACE OF INSPECTION.
Issued by:
Reviewed by:
Approved by
Title or
position:
Title or
position:
Title or
position:
Date:
May 24, 2022
Date:
May 24, 2022
END OF REPORT