WATER INGRESS TEST REPORT
PROCEDURE NO
DATE
: TOF-IPT-02-CEPL
: 31/08/2020.
Client Project Ref. : GC191008 B0 - EPIC for Route Survey, Design, Construction,
Installation & Hook-up of Well Flowlines in Dukhan Fields
Equipment Name : Wellhead Control Panel
Drawing Nos.
: CJ20 04 0042 GA 01
Testing Ref
: IP 66 Regulations
1.1
PURPOSE
Water Ingress is carried out to verify the water ingress protection as per below
procedure for the WHCP enclosure. WHCP enclosure under test needs to withstand
a continuous splashing of water.
1.2
REFRENCE DOCUMENTS
•
General Arrangement Drawing of CJ20 04 0042 GA 01
•
Std: IEC/EN60529
1.3
PRE – REQUISITE CONDITIONS
Before starting the actual water spray test; following points are checked for its
readiness
•
Clean water source with hose is available as per Water Ingress Protection.
•
Panel enclosure is completed for its 100% fabrication externally. All doors are closed.
All the auxiliary terminal plates such as bulkheads, cable gland entries to the enclosure
are blanked off.
1.4
•
TEST PROCEDURE
Since, the WHCP enclosure is seam welded all over, only ingress points are the doors
& on the bulkheads.
•
Opening which needs to be tested with splashing of water to verify entry of water
particles inside the panel.
•
Water is sprayed all over the Wellhead control panel by 12.5mm Dia Nozzle. Water
Flow rate shall be 100L/min, and Splashed water will be applied is for 1 min/m² at least
3 min.
•
Distance from nozzle to enclosure surface: 3 m.
•
Minimum test duration: 3 min
•
Once, water spraying is over doors are opened to verify entry of water particles inside
the WHCP enclosure.
TOF YEHAR SGR PTE LTD 280, Woodlands Industrial Park E5, Blk 2, #09-12, Harvest @ Woodlands,
Singapore – 757322 Tel: +65 62640792|Fax: +65 62640153 |Email: sales@tof.com.sg |Web: www.tof.com.sg
pg. 1
•
Non evidence of water particles inside successfully concludes the water ingress test
of the WHCP enclosure.
Testing done as per above procedure & WHCP enclosure will be confirmed as having
successfully passed the test.
Prepared By:
Witnessed By:
QA/QC, TOF
Inspector, Bureau Veritas