TUGAS MANAJEMEN OPERASI BAB 14 NO. 14.7 Diketahui: S 2U 1T 1V 2W 1X Keterangan : = Level 0 = Level 1 = Level 2 PARENTS : S, T, U KIDS/COMPONENTS : T,U,V,W,X,Y,Z BILL OF MATERIAL (BOM) S = 100 units T = 100 * 1 = 100 units U = 100 * 2 = 200 units V = 100 * 1 = 100 units X = 100 * 1 = 100 units Y = 100 * 2 = 200 units Z = 100 * 3 = 300 units 2Y 3X GROSS REQUIREMENT PLANNING ITEM Week Lead Time 1 2 3 4 5 6 7 S 100 Order 100 Release 2 T 100 Order 100 Release 1 U 200 Order 200 Release 2 V 100 Order 100 Release 2 W 200 Order 200 Release 3 X 100 Order 100 Release 1 Y 400 Order 400 Release 2 Z 600 Order 600 Release 1 14.7 Using the information in Problem 14.5, construct a net material requirements plan using the following on-hand inventory ITEM S T U V ON-HAND INVENTORY ITEM 20 20 40 30 W X Y Z ON-HAND INVENTORY 30 25 240 40 NET REQUIREMENTS PLANNING Lot Size Lot for Lot Lot for Lot Lot for Lot Lot for Lot Lot for Lot Lead Time (weeks) 2 1 2 2 3 On Safety Allo- Hand Stock cated 20 20 40 30 30 - - - - - - - - - - LowLevel Code 0 1 1 2 2 Item Week Identification S T U V W 1 Gross Requirements Scheduled Receipts Projected On Hand | 20 Net Requirements Planned Order Receipts Planned Order Released Gross Requirements Scheduled Receipts Projected On Hand | 20 Net Requirements Planned Order Receipts Planned Order Released Gross Requirements Scheduled Receipts Projected On Hand | 40 Net Requirements Planned Order Receipts Planned Order Released Gross Requirements Scheduled Receipts Projected On Hand | 30 Net Requirements Planned Order Receipts Planned Order Released Gross Requirements Scheduled Receipts Projected On Hand | 30 Net Requirements Planned Order Receipts 20 2 20 3 4 20 5 20 6 20 80 80(S) 20 20 20 20 20 60 60 60 160(S) 40 40 40 40 120 60(T) 30 30 30 30 30 30 30 120(T) 30 30 30 30 90 90 40 120 120 20 7 100 20 80 80 Lot for Lot Lot for Lot Lot for Lot 1 2 1 25 240 40 - - - - 2 2 - 2 X Y Z Planned Order Released Gross Requirements Scheduled Receipts Projected On Hand | 25 Net Requirements Planned Order Receipts Planned Order Released Gross Requirements Scheduled Receipts Projected On Hand | 240 Net Requirements Planned Order Receipts Planned Order Released Gross Requirements Scheduled Receipts Projected On Hand | 40 Net Requirements Planned Order Receipts Planned Order Released 90 60(T) 25 25 25 25 35 35 35 240(U) 240 240 240 0 0 0 360(U) 40 40 40 320 320 320 14.26 Courtney Kamauf schedules production of a popular Rustic Coffee Table at Kamauf Enterprises, Inc. The table requires a top, four legs, 1/8 gallon of stain, 1/16 gallon of glue, 2 short braces between the legs and 2 long braces between the legs, and a brass cap that goes on the bottom of each leg. She has 100 gallons of glue in inventory, but non,, e of the other components. All items except the brass caps, stain, and glue are ordered on a lot for-lot basis. The caps are purchased in quantities of 1,000, stain and glue by the gallon. Lead time is 1 day for each item. Schedule the order releases necessary to produce 640 coffee tables on days 5 and 6, and 128 on days 7 and 8.