Uploaded by shahidaliattari12

Operational Summary

advertisement
Operational Summary
Casings shoe @ (M)
Rig HL-02 / Nashpa – 10
Hole Size
Depth (M)
Progress (M)
WOB (Ton)
GPM
P. Pre (psi)
RPM
ROP
Formation
T.D(M)
Mud
S.G
Depth Dev.
Date: ___________
20”
14”,
13-3/8”
9-7/8”,
9-5/8”
7”
5”
7”
5”
7”
5”
7”
5”
7”
5”
@0600 hrs.
**********************************
Casings shoe @ (M)
Rig HL-16 / KUC – 01
Hole Size
Depth (M)
Progress (M)
WOB (Ton)
GPM
P. Pre (psi)
RPM
ROP
Formation
T.D(M)
Mud
S.G
Depth Dev.
20”
14”,
13-3/8”
9-7/8”,
9-5/8”
@0600 hrs.
**********************************
Casings shoe @ (M)
Rig HL-17 / QP HRL – 15 (HOR)
Hole Size
Depth (M)
Progress (M)
WOB (Ton)
GPM
P. Pre (psi)
RPM
ROP
Formation
T.D(M)
Mud
S.G
Depth Dev.
20”
14”,
13-3/8”
9-7/8”,
9-5/8”
@0600 hrs.
**********************************
Casings shoe @ (M)
Rig SIN-078 / Rajian – 10 (S/T)
Hole Size
Depth (M)
Progress (M)
WOB (Ton)
GPM
P. Pre (psi)
RPM
ROP
Formation
T.D(M)
Mud
S.G
Depth Dev.
20”
14”,
13-3/8”
9-7/8”,
9-5/8”
@0600 hrs.
**********************************
Casings shoe @ (M)
Rig CCDC-26 / Siab – 01
Hole Size
Depth (M)
Progress (M)
WOB (Ton)
GPM
P. Pre (psi)
RPM
ROP
Formation
T.D(M)
Mud
S.G
Depth Dev.
**********************************
20”
@0600 hrs.
14”,
13-3/8”
9-7/8”,
9-5/8”
Download