CEB4013 PROCESS PLANT DESIGN Assignment Marking Scheme (To be completed by the lecturer/GA) GROUP NO: Items Marks Marks allocated obtained 1. Question 1 Technical accuracy, elaboration, thoroughness and specific description on ALL TWELVE (12) factors of plant location selection based on logical reasoning and arguments • • • • • • • • • • • • Factor 1 Factor 2 Factor 3 Factor 4 Factor 5 Factor 6 Factor 7 Factor 8 Factor 9 Factor 10 Factor 11 Factor 12 Raw materials availability Markets Energy availability Climate Transportation facilities Water supply Waste disposal Labor supply Taxation and legal restrictions Site characteristics Flood and fire protection Community factors [4 marks] [4 marks] [4 marks] [4 marks] [4 marks] [4 marks] [4 marks] [4 marks] [4 marks] [4 marks] [4 marks] [4 marks] 60 • Comparison based on THREE (3) alternatives and final selection of site based on the discussed reasoning [12 marks] 2. Question 2 Plant layout • Accuracy and completeness of drawing [15 marks] • Relevant description and justification on the safety aspects of the layout [15 marks] • Layout follows Codes of Practice and Industry Guidance [5 marks] 35 3. Others • Adequate referencing technique • Neatness and consistency in formatting style • Precise use of English 5 [ [ [ [ [ [ [ [ [ [ [ [ ] ] ] ] ] ] ] ] ] ] ] ] [ ] [ ] [ ] [ ] [ ] Group Total Comments: _________________________________________________________________________ .………………………… Lecturer/GA’s signature Date: ………………………