Uploaded by Phani Naik

PAPI Proposal

advertisement
XEED CONSULTING
PRIVATE LIMITED
00 1, T o we r 7 , Un i t e c h Ha r mo ny, N i r v a n a C o u n t r y, Se c t o r 5 0, G u r g a o n - 1 2 2 0 1 8, H a r y a n a - I N D I A
Date: 09-May-2022
Superintending Engineer
R&B Kalahandi Division
Utkela Airport, Airstrip Road,
Utkela, Odisha 766011
Subject: Proposal for
• Site Survey for work assessment
• Repair / Relocation of PAPI
• Annual maintenance for PAPI
Dear Sir,
We are thankful to you interest shown in services provided by our organisation. Please find along with
this letter our initial proposal against the subject mentioned. Each of the points are covered in
separate annexures. The quote for repair of existing PAPI would be shared after site visit. Annual
maintenance for PAPI – Annexure 2 are budgetary quotes. These will be corrected and realigned with
the scope based on site survey and agreed scope of work.
Enclosures:
•
•
•
Thank you
Best Regards
Pallavi Sharma
Director
Annexure – 1
Annexure – 2
Terms and Conditions
XEED CONSULTING
PRIVATE LIMITED
00 1, T o we r 7 , Un i t e c h Ha r mo ny, N i r v a n a C o u n t r y, Se c t o r 5 0, G u r g a o n - 1 2 2 0 1 8, H a r y a n a - I N D I A
Annexure – 1
Site Survey
Sno
1
Description
Site Survey to ascertain the scope of work
for commissioning of PAPI and
Maintenance scope. Maximum planned
duration of 2 days.
Resources:
Skilled: 1
Unskilled 1
Total (INR)
Qty
Utkela Airport, Utkela,
Odisha - 766011
Amount
30,000
30,000
XEED CONSULTING
PRIVATE LIMITED
00 1, T o we r 7 , Un i t e c h Ha r mo ny, N i r v a n a C o u n t r y, Se c t o r 5 0, G u r g a o n - 1 2 2 0 1 8, H a r y a n a - I N D I A
Annexure - 2
Sno Item Description
No
1
1
Providing Operation And Maintenance Contract
of GLF and PAPI lights input voltage 240 V ,50 Hz
, 34 Amps Output 7.5 KW/20Kw/4kw at 6.6 Amps
(Current regulated 2.8 Amp ,3.4 Amp ,4.1 Amp
,5.2 Amp & 6.6 Amp )with attached Equipment's
(5 No. of CCR Panel,1 No. of RCD Panel , 8 No. of
PAPI Light fitting ) Rotating Airport Beacon light
fitting Including 4 nos. par 64 (2 as Master and 2
as standby) with lamp fault indication, Lens
colour-2 Green and 2 White , Operating Voltage 230 V AC , Frequency of flashing-25 to 30 flash
per minute visual checking of dimly burning and
burnt out lamps ,disposition /broken lenses etc. ,
externally cleaning of PAPI light fitting ,CCR Panel
,RCD ,checking of proper functioning of regulator
i/c noiseless operation ,checking of regulator for
operation of all steps of brightness on remote
control , checking clips/screws holding the lense
correct/replace ,base plate bolts , removed
vegetation obscuring light ,proper alignment and
orientation of light fitting for Day & Night
,checking of input voltage , current , load on CCR
, abnormal heating of CCR & ground calibration
PAPI units.
Unit
Qty Rate
Per
12
Month
Amount
76,500 9,18,000
Manpower:
Skilled- 2
Un-Skilled -1
Total (INR)
9,18,000
XEED CONSULTING
PRIVATE LIMITED
00 1, T o we r 7 , Un i t e c h Ha r mo ny, N i r v a n a C o u n t r y, Se c t o r 5 0, G u r g a o n - 1 2 2 0 1 8, H a r y a n a - I N D I A
Terms and Conditions
1. All prices are excluding GST
2. Applicable PF and ESIC extra
3. Payment Termsa. 100% advance with Purchase Order for work less than 60 days.
b. 100% Monthly advance for Purchase Order for work greater than 60 days
4. Works Duration after receiving PO and advance
a. Site Visit and evaluation – 7 days
b. Shifting / Installation of PAPI Lights – 30 Days
c. Maintenance of PAPI Lights - 12 months.
5. Any additional material required for execution of work apart from the material specified in
the description above will be charged extra.
6. Any additional labour work required to be done for successful shifting of PAPI to the new
location will be charged extra at actual.
7. The period of work will commence after clear and ready site is handed over by the authority.
8. Subject to Gurgaon Jurisdiction
Download