Uploaded by eakman90

PDE-EQS-03-AB-0020-000-00-DPP-1

advertisement
Plant
Client
Code
Project No
Fertilizer Complex
Brunei Fertilizer Industries
BFI
KXE0-00045
Table of Contents - Construction Documentation
Doc Id Code: PDE-EQS-03-AB-0020
Plant
Discipline
Unit
Binder
Page
Ammonia
EQS
03
05_01_01
1/1
Document No.
Rv.
Description
TON
PDE-EQS-03-DZ-0656
PDE-EQS-03-DZ-0657
03
03
1031E001-Y01
1031E001-Y01
PDE-EQS-03-DZ-0659
02
PDE-EQS-03-DZ-0660
PDE-EQS-03-DZ-0661
PDE-EQS-03-DZ-0662
PDE-EQS-03-DZ-0663
PDE-EQS-03-DZ-0667
PDE-EQS-03-DZ-0670
PDE-EQS-03-DZ-0671
PDE-EQS-03-DZ-0672
02
01
03
04
03
02
01
02
PDE-EQS-03-DZ-0674
04
Refractory Lining - Inlet Process Gas Cooler
Refractory Lining - Inlet Process Gas Cooler
PGC Refractory Lining Proposal Arrangement Wood
Shuttering
PGC Proposal Wood Shuttering Inner Parts
PGC Proposal Wood Shuttering Outer Parts
Anchor Lay-out - Inlet Process Gas Cooler
PG Cooler: heat transfer calculations
PG Cooler: installation instruction
Storage instruction
Material safety data sheet
Technical data sheet
Inspection Test Plan Process Gas Cooler – Refractory
Lining
1031E001-Y01
1031E001-Y01
1031E001-Y01
1031E001-Y01
1031E001-Y01
1031E001-Y01
1031E001-Y01
1031E001-Y01
1031E001-Y01
1031E001-Y01
Rev
Date
Status
Prepared
Checked
Approved
CC
00
26.03.2020
IFC
Maresch, S.
Schaup, R.
Bodenheim, D.
3
This document is valid without signature
Download