Index of Field Review / General Review Checklists Index of Field Review / General Review Checklists Section Name Page Number Introduction to the Checklists 2 1 General 3 2 2.1 2.2 2.3 2.4 Site Work Excavation Backfilling Site Work Landscaping 5 5 6 6 8 3 3.1 3.2 3.3 3.4 Concrete Footings/Foundations Slabs on Grade Structural/Architectural Concrete Structural/Architectural Precast Concrete 9 9 9 10 11 4 Masonry (incl. Fire Stopping/Smoke Seals) 13 5 5.1 5.2 5.3 Metals Structural Steel/Steel Joists/Steel Deck (incl. Fireproofing) Light Steel Framing Metal Fabrications 15 6 6.1 6.2 Wood and Plastic Wood Framing Cabinetwork/Millwork 17 17 17 7 7.1 7.2 7.3 7.4 Thermal and Moisture Protection Wall Cladding (incl. Exterior Insulation & Finishing Systems) Roofing/Flashing Shingles/Shakes Sealants 19 19 19 20 21 8 8.1 8.2 8.3 8.4 8.5 8.6 8.7 Doors and Windows Steel Doors & Frames Wood & Plastic Laminate Doors Special Doors Aluminum Entrances/Screens, Windows & Skylights Hardware Glass & Glazing Curtain Wall/Structural Sealant Glazing Systems 22 22 22 23 23 24 24 24 9 9.1 9.2 9.3 9.4 9.5 9.6 9.7 Finishes Gypsum Wallboard & Plastering (incl. Fire Stopping/Smoke Seals) Ceramic, Quarry & Terrazzo Tile Acoustical Ceilings Wood Flooring Resilient Flooring Carpeting Painting/Special Finishes/Wall Coverings 26 10 10.1 Specialties Specialities (incl. Chalk/Tackboards, Toilet Partitions, Louvres & Vents, Wall 33 33 15 15 16 26 27 27 28 29 30 31 & Corner Guards, Lockers, Demountable Partitions, Washroom Accessories) 15 Mechanical 35 16 Electrical 37 Field Review / General Review Checklists (2003). Field Review/General Review: Guidelines for Conducting and Documenting Construction Site Visits. Ottawa: The Royal Architectural Institute of Canada. Posted with permission. July 2003 Field Review / General Review Checklists Introduction to the Checklists The number and frequency of site visits, and specific items to be reviewed, are the prerogative of the architect and not the client, as some clients attempt to dictate. The architect must exercise appropriate professional judgment as to the extent of field review or general review necessary to fulfill both contractual commitment and obligation to meet standards of the profession. All items listed in these checklists are subject to review by the architect, even though some of them are primarily the responsibility of the professional of the appropriate discipline; in those cases, the role of the architect is to be aware of and observe those items and to be satisfied that the appropriate professional has performed the review. Field review or general review consists of a periodic review of sample locations within a project. The accompanying Checklists should be read in that context. Field review or general review is not a detailed comprehensive review, nor is it supervision. Items in this document may apply to certain projects and not to others. Comments with respect to timing and priority are guidelines only. From time to time the relevant field observation may not occur in the sequence indicated. The activities scheduled in the accompanying Checklists assume an agreement for architectural services that includes so called “full service for on-site contract administration”. The objectives of these Checklists are to prepare the architect to keep ahead of events on the site and to assist the construction process to run smoothly (which is clearly to the advantage of both the architect and the contractor), in order to achieve the desired end result for the client without undesirable compromises. The last objective affirms the principle that the contractor is obliged to construct a building for the client which is in full conformance with the contract documents. The degree to which the architect can enforce this intent varies, and depends on the type of project delivery. The greatest level of control is under a Stipulated Price Contract (usually using CCDC 2), whereas the least control will likely occur when the client is an owner-builder, whose objectives may only be quick completion at the lowest possible cost. The various forms of Construction Management and Design-Build fall between these extremes. Regardless of the project delivery method used, good practices in field review or general review should always constitute a significant part of the conscientious architect’s services to the client. Installation is the responsibility of the constructor. The architect’s field observations with respect to installation will necessarily be limited by the periodic and sampling nature of the review. This guideline assumes that the architect anticipates that effective integration between office contract administration and field review or general review at the site is maintained. PROCEDURE 1 Review the Checklists and establish an estimated schedule of visits to augment, as required, the schedule prepared to suit. 2 Review the schedule of visits when the construction contract has been awarded, making adjustments as necessary. Identify to the contractor all specific events about which you will require sufficient advance notification, particularly in relation to the scheduling of the portions of the work that will require preconstruction meetings. 3 Communicate regularly with consultants, testing and inspection agencies, and others whose services you are coordinating, and advise them of your expectations for recording and reporting on-site activities. 4 Refer to the Checklists prior to each site visit; take relevant sections with you to the site. July 2003 Introduction to the Checklists 2 Field Review / General Review Checklists Checklist: 1. General in preparation for site visit, assemble/bring as required: ❑ protective clothing/equipment (safety boots/glasses, hard hat, coveralls, ear plugs, rubber gloves, dust mask/respirator) ❑ recording equipment (clip board with blank Site Visit Report form and copy of last visit report, tape recorder, still/video camera with date and time imprint, etc.) • two-part Site Instruction forms with integral carbon copying are useful for: • writing instructions/comments • leaving copy with contractor at site • measuring/observation equipment (tape measure, pocket knife, pocket level, flashlight, binoculars, thermometer, moisture meter, small mirror (such as dentist’s mirror) for inspecting hard-toobserve places, markers, pocket calculator) • approved samples, colour chips pre-construction site meeting: ❑ purpose of meeting is to introduce all parties to each other, clarify expectations, review procedures, discuss contractor’s construction schedule ❑ prepare and distribute agenda prior to meeting ❑ instruct all engineers to attend ❑ architect should chair and record this meeting ❑ complete and issue minutes to all present within 48 hours regular site meetings: ❑ usually chaired and recorded by contractor: • minutes completed and issued to all present within 48 hours ❑ purpose of meeting is to: • clarify expectations for specific performance standards • review progress, identify, and resolve necessary action for, issues which may impact other trades’ work and/or have potential to cause delay • answer questions from general contractor or individual trades (or make commitment to provide answer, if further research or investigation is required) ❑ review minutes upon receipt; promptly send written notification of any errors or omissions to contractor and all other recipients planning site visits, monitoring and reporting site activities: ❑ schedule frequency of visits to suit progress, type and complexity of work under way at site, particularly: • at project start-up • at start-up of work of major sub-contractors • prior to work of one trade being covered by another trade • after unusual changes in weather ❑ review construction schedule, relevant specifications and standards ❑ notify engineers when their presence at site will be required, monitor their attendance and that their reports are issued promptly ❑ confirm that contractor notifies testing and inspection agencies in a timely manner when they are needed at site, monitor their attendance and that their reports are issued promptly: • review any recommendations with appropriate engineers • issue written instructions for any required corrective action ❑ ensure that all observations and instructions are recorded in writing ❑ prepare and issue Site Visit Reports promptly: • use section headings and standard forms • complete reports in clear concise wording, using short-form phrases • number each report consecutively • number each item consecutively, prefixed with report number July 2003 General 3 Checklists Field Review / General Review • if items have not been resolved, when observed at subsequent site visit(s), repeat item using original text and reference numbers, adding further comments as needed ❑ prepare and issue Site Instructions or Change Directives promptly inspect materials delivered to site for: ❑ conformance to specifications and shop drawings ❑ temperature/moisture conditions ❑ protective coverings ❑ storage off ground/flat/upright, as specified ❑ damage in transit/on site ❑ record and report observations after building closed in: ❑ arrange site meeting with contractor and all mechanical/electrical subcontractors: • may include subtrades, as appropriate, for plumbing & drainage, heating/cooling piping, ductwork, insulation, sprinklers, temperature controls, electrical conduits/raceways/lighting • review coordination of services to be installed above suspended ceilings/bulkheads • particular emphasis on congested locations • make each subtrade aware of: • importance of locating their work so as to avoid later conflicts with other trades’ work or with suspended ceilings/bulkheads • possibility that incorrectly located work will be ordered to be removed and reinstalled • review layout of services to be installed in visible locations • prevent first trade on site placing their piping/ductwork/conduits without consideration of design requirements/ other trades’ ability to work within space available • issue coordination drawings/sketches showing agreed layouts to all parties as required • observe conformance: • promptly issue Site Instructions for corrective work as needed • advise engineers as issues arise 4 General July 2003 prior to occupancy: ❑ assemble mechanical/electrical manuals, as specified • submit to Owner ❑ inspections/tests carried out/ certificates received ❑ if occupancy of unfinished building necessary: • measures required to prevent access to incomplete parts of building • means of egress free of loose materials/other hazards • all other conditions required by Authorities Having Jurisdiction met project completion: ❑ notification issued as required by Authorities Having Jurisdiction ❑ deficiencies: • prepare deficiency lists/establish timetable for completion • follow up persistently in addition to usually specified manuals, consider preparing facilities management manual for Owner: ❑ particularly significant for buildings incorporating energy efficient or sustainable design concepts ❑ contents of manual could include: • outline of design principles of building systems • schedule of recommended maintenance procedures • normal/expected functional life of components • how to utilize design features, for example: • partitioning or ceiling systems with inherent flexibility which permit building to be readily modified further reference: Canadian Handbook of Practice for Architects, chapter 2.3.11 Field Review / General Review Checklists Checklist: 2. Site Work 2.1 Site/Building Excavation ❑ bench marks/barge boards protected and maintained until no longer required: • review building location/levels/limits of work ❑ arrange for testing and inspection agency to record condition of on-site and off-site structures to remain: • obtain sign-off of condition reports on existing adjacent buildings from their owner(s) and from contractor • recording and sign-off completed prior to start of any work on site • forward copies of reports to Owner ❑ most Authorities Having Jurisdiction now require temporary site perimeter protection systems (‘siltation control devices’) to control runoff and contamination onto adjacent properties during construction: • observe that perimeter protection systems: • meet requirements • are maintained throughout construction period ❑ verify that report of geotechnical investigations is available on site and has been reviewed by contractor ❑ shoring/underpinning: • confirm that engineers attend at site to review work as frequently as necessary to suit progress and complexity of the work • coordinate reporting and instructions as required ❑ protection of existing buried utility lines by contractor: • location, identification and protection of lines to be retained • capping of lines to be removed or abandoned • identification of unknown lines ❑ protection of existing vegetation to be retained: • provision of temporary fencing or barriers • no vehicle parking or storage of materials within drip line of trees ❑ arrange for immediate measurement by testing inspection agency of all changes when unexpected subsurface conditions not identified by geotechnical investigations are encountered: • soft spots • springs • buried organic material • buried debris • rock or concrete over specified size ❑ it may be urgent for excavation work to continue so as not to cause delay: • advise testing and inspection agency that their attendance at site on short notice may be required • be prepared to make decisions on site and issue hand-written Site Instructions on how to proceed; do not give in to pressure to make a snap decision without first: • taking time to evaluate • consulting with engineer, if judged advisable • as soon as possible, review quantities and claims with engineer and testing and inspection agency • after review, promptly issue appropriate confirming Site Instructions, Change Directives or Change Orders • related additional charges are usually charged to Contingency Allowance • keep Owner informed on a regular basis • Owner may be anticipating that Contingency Allowance funds will not have been used by the end of the contract and can be assigned to pay for other unbudgeted items ❑ arrange for measurement and recording by testing and inspection agency of quantities of: • additional excavation • additional compacted backfill • reduced excavation • over-excavation • contractor will probably also measure quantities: • be prepared to negotiate an agreement fair to Owner and contractor July 2003 Site Work 5 Checklists Field Review / General Review ❑ when topsoil is specified to be salvaged and stockpiled on site for future use, arrange for measurement of quantities by testing and inspection agency: • if precautions to preserve this resource are not taken, it can diminish significantly during the life of the construction project: • advise contractor of his responsibility to secure its protection ❑ regularly review potentially hazardous conditions on site/protection of the public: • fencing, hoarding, lighting, signage installed as specified, maintained until no longer required • dewatering/drainage • be aware of potential hazards and advise contractor that immediate appropriate action must be taken to make safe, even if hazard is claimed to be only temporary: • site security provisions may not be adequate to control access after hours by members of the public, particularly children: • water from existing watercourses or springs, or from rainfall or melting snow and ice • ponding • pits left open can fill with water • unstable piles of spoil from excavation • partially demolished existing structures 2.2 Site/Building Backfilling ❑ confirm that contractor notifies testing and inspection agency in a timely manner when they are needed at site ❑ materials: • conformance to specifications ❑ placement/compaction: • no backfilling on frozen ground • in layers in specified depths • simultaneous placement/compaction on both sides of buried foundation walls • shoring/bracing foundation walls unsupported at top • prevention of damage to exterior foundation wall insulation/waterproofing • subgrade levels/moisture content/compaction confirmed/measured by testing and inspection agency 6 Site Work July 2003 • pay particular attention to measuring compaction adjacent to foundation walls • test reports issued promptly by testing and inspection agency • boundary markers, monuments, stakes maintained/replaced as required ❑ subsequent trenching/backfilling for buried utilities: • trenching coordinated to prevent duplication/crossovers • required separations maintained between incompatible services (e.g. between water/sewer lines) • avoid use of heavy vehicles • levels/slopes • angle of repose of sides of trenches • bedding of pipes/conduits • uncompleted piping closed off/sealed at end of each work day • tops of manholes/catch basins correctly located to meet final grades • prior to backfilling, completion of all: • inspection/testing/approvals of piping by engineers/testing and inspection agencies/Authorities Having Jurisdiction • backfilling materials/placement/ compaction consistent with adjacent work, unless specified otherwise ❑ protection: • no heavy vehicles permitted over completed subgrade • fencing/barricades provided around completed site grading/open pits/trenches • open pits/trenches free of standing water 2.3 Site Work ❑ confirm that contractor notifies testing and inspection agency in a timely manner when they are needed at site to test/inspect asphalt paving ❑ before delivery of materials, submission of: • samples of all asphalt paving materials, as specified, to testing and inspection agency for testing: • test reports submitted to architect for review minimum four weeks prior to commencing work • test data, as specified, for interlocking pavers to architect ❑ storage of materials on site: • interlocking pavers in cubes/on palettes/plastic wrapped/steel banded Field Review / General Review ❑ before final grading begins, review: • subgrade for conformity with elevations/slopes ❑ mock-up for interlocking pavers (if specified): • installed in location approved by architect • establishes standard for workmanship/appearance • left in place until work completed ❑ placement - asphalt paving: • subgrade: • graded/trimmed/built up so that finished work conforms to elevations/grades shown on drawings • proof rolled to specified minimum thicknesses/specified density • shaped/crowned to provide positive drainage • sub-base/base: • placed/compacted to specified density • asphalt: • no installation if: • all underground drains/utilities/ backfilling not completed/inspected • air temperature below specified minimum • mixture temperature not within specified minimum/maximum range • all work suspended if temperatures fall below specified minimums • binder/surface courses placed/compacted: • to specified minimum thicknesses • mechanically • by hand placing/tamping in areas inaccessible to rollers • positive grades to specified minimum slopes • edges shaped/tamped • expansion strips at junctions with building/sidewalks • construction joints: • previous work cut back to fresh vertical surface, free from broken/loose material • joints coated with emulsified asphalt prior to placing new work • repairs: • asphalt cut out to full depth • base re-compacted/augmented with additional material as required • all edges coated with emulsified asphalt prior to placing new binder/surface courses Checklists • inspection: • inspection reports issued promptly • lines painted after repairs completed/approved • no heavy traffic until asphalt curing completed ❑ interlocking pavers: • subgrade compacted to specified density • granular base placed/compacted to specified density • setting bed: • placed but not compacted • sufficient area which can be covered same day • placement of pavers: • working from installed units, not from setting bed • placed hand-tight in specified pattern(s) • started against building/straight edge to maintain alignment • compacted using vibratory plate compactor • fine graded sand spread/swept into joints • surplus sand removed from site • damaged units removed/replaced ❑ fencing: • concrete footings for line posts: • perimeter fencing locations confirmed within property lines • equally spaced at specified maximum • fencing: • all components galvanized • posts: • set in footings plumb/to specified height(s)/braced • grouted to manufacturer’s recommendations • top rail/bottom tension wire fixed • fence fabric: • fixed to top rail/line posts/bottom tension wire • stretched/tied securely • gates: • frames welded • complete with all specified hardware • entire assembly secure/rigid • damaged/scratched galvanizing touched up with zinc-rich primer ❑ protection: • no heavy vehicles permitted over completed subgrade July 2003 Site Work 7 Checklists Field Review / General Review 2.4 Landscaping Note: some or all of the work described in this section may be covered by a landscaping allowance included in the contract price for which documentation prepared by landscape architect may be issued later ❑ before delivery of materials, submission of: • samples of topsoil, as specified, to testing and inspection agency for testing: • soil analysis/recommendations for soil amendments submitted to architect • shop drawings for irrigation system, as specified ❑ storage of materials on site: • sod delivered not more than 5 days before placing ❑ before finished grading begins, review: • subgrade for conformity with elevations/slopes • backfilling to receive planting free from deleterious material, particularly construction debris • sleeves installed for irrigation piping/electrical conduits for site lighting ❑ protection: • no heavy vehicles permitted over completed subgrade • existing trees/other vegetation to be retained: • provision of temporary fencing or barriers • no vehicle parking or storage of materials within drip line of trees • no ponding permitted around trees • excavation/heavy equipment kept beyond drip line of trees • any essential pruning of roots/branches by qualified persons only • regular watering/feeding provided as required/specified ❑ grading: • uneven areas eliminated • low spots filled • deleterious material removed: • large stones/live weeds/wood/construction debris • final grades recorded, as specified • fencing/barricades provided around completed site grading 8 Site Work July 2003 ❑ topsoil: • no topsoil spread until subgrade inspected • subgrade scarified • topsoil spread to minimum compacted depth: • during dry weather/over unfrozen subgrade • top surface for sodded areas kept specified distance below finished grade • deleterious material removed: • large stones/live weeds/wood/ construction debris • soil amendments/fertilizer applied/mixed as specified/recommended by testing and inspection agency • fine graded mechanically to specified contours/elevations • finished surface: • rolled/compacted • smooth/uniform/firm/fine loose texture • free from footprints ❑ sod: • placement • rolled/compacted • watering/maintenance ❑ grass seeding: • moisture content confirmed • seeding • rolled/compacted • protected during germination • watering/maintenance ❑ plant materials: • soil preparation/fertilizing • condition of plant materials • caliper of trees as specified • trees staked/protected/pruned • watering/maintenance ❑ irrigation system/site lighting, as specified: • layouts as designed/approved • pipe/conduit trenches at specified depths • backfilling compacted • irrigation system pressure tested/sprinklers adjusted as required • controllers/timers operate as specified Field Review / General Review Checklists Checklist: 3. Concrete 3.1 Footings/Foundations ❑ before delivery of concrete commences, submission of: • mix designs to engineer for review • notice of scheduled concrete pours given to architect and testing and inspection agency: • typically 48 hours’ minimum notice prior to pours ❑ footings: • review bottoms of footing trenches for: • location, dimensions, level, steps as detailed • bearing capacity: • confirmed by testing and inspection agency • existing soil undisturbed, free from soft spots, water, frozen ground, organic material, debris, loose material • protective measures: • dewatering • authorize pouring of mud slabs or other measures as specified and if deemed necessary • frost protection • angle of repose of sides of trench/excavation ❑ formwork/reinforcing: • construction, dimensions, bracing • placement/support/tying of reinforcement • confirmed by testing and inspection agency ❑ placing/curing/testing concrete: • curing as specified • protection from frost/excessive heat • test samples taken as specified • test reports issued promptly by testing and inspection agency ❑ parging/dampproofing: • minimum specified thickness of parging maintained • parging coved over footing • uniform coverage by dampproofing ❑ waterproofing: • installation usually monitored by specialist testing and inspection agency: • preparation of substrate • application • testing/samples as specified • promptly issue instructions for corrective work as required/recommended by specialist testing and inspection agency ❑ perimeter insulation: • application of adhesive/placement of insulation • distance below grade as specified • protection from damage prior to backfilling: • promptly issue instructions for repair/replacement of damaged material ❑ foundation drainage: • condition of soil base • drain placement/joint coverage prior to backfilling • minimum coverage of granular material • filter cloth placement • placement of drainage medium on wall, if specified • uncompleted piping closed off/sealed at end of each work day ❑ special/deep foundations: • installation monitored by engineer and testing and inspection agency: • testing/samples as specified • promptly issue instructions for corrective work as required/recommended by engineer/testing and inspection agency 3.2 Slabs on Grade ❑ before delivery of concrete commences, submission of: • mix designs to engineer for review • notice of scheduled concrete pours given to architect and testing and inspection agency: • typically 48 hours’ minimum notice prior to pours July 2003 Concrete 9 Checklists Field Review / General Review ❑ review proposed procedures for placing/finishing/curing/testing concrete, well in advance of scheduled pours: • convey/deposit concrete as close to final position as possible: • use of dollies/hoppers/pumps • maintaining specified levels and trueness of slabs: • use of screeds • wood screeds removed as work proceeds • slopes to drains where required • locations of construction joints: • negotiate changes, if required to minimize impact on floor finishes, etc. • test samples taken as specified: • test reports issued promptly by testing and inspection agency • protecting newly poured slabs from frost/excessive heat • concrete curing method: • early raising of this issue is preferable to finding that an unauthorized alternative method is in use when slab pouring and curing are already under way • contractor may take the opportunity to propose an alternative method for consideration: • due consideration of an alternative method may be appropriate • architect is under no obligation to change the specification • promptly issue confirming instructions • correction/repair of defective areas, if required: • review proposed procedures • finishing: • specified finishes and their locations to ensure clear understanding of intent of specifications: • wood float/steel trowel • coloured/hardened concrete • non-slip/exposed aggregates • broom finish: direction or pattern • tooled edges: none, or if required, clarify type and location • areas where retardants specified ❑ vapour barrier/dampproofing • protection from perforation: • top surface of granular backfill smooth/free from sharp projections • caution contractor to minimize traffic on membrane 10 Concrete July 2003 • examine condition of membrane prior to placement of reinforcing • all laps to maintain continuity of air/vapour barrier: • in membrane • at perimeter at changes of material • promptly issue instructions for corrective ❑ ❑ ❑ ❑ work prior to placing of reinforcing/ pouring slab waterproofing • installation usually monitored by specialist testing and inspection agency: • preparation of substrate • application • testing/samples as specified • promptly issue instructions for corrective work as required/recommended by specialist testing and inspection agency perimeter/under-slab insulation: • protection from damage • promptly issue instructions for repair/replacement of damaged material reinforcing/conduits in slab: • placement/support of reinforcing: • confirmed by testing and inspection agency • spacing of parallel conduits in slab • additional reinforcing/slab thickening, as specified: • under masonry partitions • at large conduits • at conduit crossovers joints/saw cuts: • review layout and locations well in advance of scheduled work: • control/construction joints • clarify expected finishing of joints: • edges tooled or not • tool marks removed/retained protection: • control loading and traffic over newly poured concrete • special coverings, as required 3.3 Structural/Architectural Concrete ❑ before delivery of concrete commences, submission of: • mix designs to engineer for review • notice of scheduled concrete pours given to architect and testing and inspection agency: • typically 48 hours’ minimum notice prior to pours Field Review / General Review ❑ formwork: • supports/bracing/tying/spacers • cleaning/surface preparation: • oiled/wetted • dirt/water removed from steel deck flutes • locations of construction joints: • keys provided • placement/fixing of: • anchors/sleeves/inserts for other trades • expansion joints • chamfers/keys/chases • cleanouts/ports provided as required • for architectural concrete: • all the above • formwork/form release agent materials as specified • layout of joints/ties/chamfers/reglets • joint seals/fillers/gaskets as specified • retardant, as specified ❑ reinforcing/embedded conduits: • placement/support of reinforcing: • minimum coverage maintained • additional reinforcing at openings • studs for composite slabs installed, as specified • reviewed by engineer • checked and confirmed by testing and inspection agency • inspection reports issued promptly • spacing of parallel conduits • coverage at conduits • conduit crossovers ❑ placing concrete: • use of pumps/chutes/ports, as required, to deposit concrete as close to final position as possible • removal of temporary spreaders as placing proceeds • vibration • delivery planned to allow continuous placement/avoidance of unplanned cold joints • locations of construction joints in slabs: • negotiate changes, if required, only if consistent with structural design • obtain engineer’s approval of proposed changes • use of screeds to maintain specified levels and trueness of slabs: • wood screeds removed as work proceeds • slopes to drains where required • test samples taken as specified Checklists • test reports issued promptly by testing and inspection agency ❑ finishing/curing slabs: • review specified finishes and their locations well in advance of scheduled pours: • wood float/steel trowel • coloured/hardened concrete • non-slip/exposed aggregates • concrete curing as specified (refer also to Section 3.2 Slabs on Grade) • saw cuts as specified ❑ formwork removal: • forms left in place until: • end of specified curing period • adequate concrete strength reached • removed with care to avoid damage to surfaces/corners/reglets • newly exposed surfaces protected • reshoring installed as required/specified • patching carried out promptly using approved procedures • spreader cones left in place until concrete fully cured • install tie-hole plugs as soon as cones removed ❑ curing/finishing architectural concrete: • same length of time for each separate pour: • before removal of forms, to minimize colour variations • between removal of forms and application of curing compound • sandblasting as specified • to match approved sample panel • no patching unless authorized 3.4 Structural/Architectural Precast Concrete ❑ before fabrication begins, submission of: • shop drawings to architect/engineer for review • concrete mix design(s) to engineer for review ❑ visit manufacturing plant to observe: • formwork • fabrication methods • conformance to approved sample for architectural precast • reinforcing checked and confirmed by testing and inspection agency • inspection reports issued promptly ❑ before erection on site begins, submission of: • welders’ qualifications for review by engineer July 2003 Concrete 11 Checklists Field Review / General Review ❑ erection: • temporary guys/braces installed as work progresses • left in place until no longer required • joints/unit alignment within specified tolerances • protective coating on connectors/ fasteners undamaged • all field connections/scratched or marred surfaces touched up when erection completed • built-in flashings/gaskets • caulking/weep holes • checked and confirmed by testing and inspection agency • inspection reports issued promptly ❑ cleaning architectural precast: • review procedures and materials prior to commencement • conduct test cleaning in an inconspicuous location • no cleaning unless authorized, using approved procedures only • cleaning from top of building downwards • adjacent materials protected 12 Concrete July 2003 Field Review / General Review Checklists Checklist: 4. Masonry ❑ arrange site meeting in advance of commencement of masonry work to review procedures and expectations with contractor and masonry subcontractor ❑ before delivery of masonry products, submission to architect of: • samples of all materials • laboratory reports certifying compliance with specifications of: • masonry units • mortar ingredients ❑ storage of materials on site: • off ground • covered • protected from freezing • reject chipped/damaged/defective units ❑ sample panel(s) (if specified): • erected in location approved by architect: • free-standing or part of permanent structure • must incorporate all components/materials/ conditions specified • establishes standard for workmanship/appearance: • masonry bonds • distribution of colour variations • mortar colour • joint alignment/thickness/tooling • masonry work not to proceed until sample panel approved • left in place until masonry work completed ❑ protection: • secure cover over walls at end of each day • sills/projections/exposed edges • completed masonry/work of other trades from splashing/marking • temporary bracing of walls until permanent lateral supports in place • cold weather precautions: • heating mortar ingredients/maintaining mortar temperature after mixing • heated enclosures of work area/newly completed work for minimum 48 hours or as specified • stop work if suitable precautions not in place ❑ mortar: • mixing • colour consistency • used within maximum time after mixing • test samples taken as specified: • test reports issued promptly by testing and inspection agency ❑ workmanship: • brick dampened as specified • concrete block units laid dry • application of mortar to units as specified • coursing uniformity maintained by use of: • storey pole or other vertical measure • level line for each course • steel frames filled solid with: • mortar for interior frames • insulation for exterior frames • joint reinforcement: • lapping at splices • special units: corners/tees • broken at control joints • anchors for masonry veneer • control joints constructed as specified • anchors/inserts/built-ins installed as work proceeds • mortar/concrete fill, as specified, placed for block wall areas to be filled solid • steel lintels: • end bearing • touch-up corrosion protection after installation • through-wall flashing/dampproof course: • when multiple layers specified, observe each layer prior to commencement of next • observe potentially hazardous sharp edges on metal flashing projections, particularly near grade at laps/corners ❑ reinforced concrete block masonry: • temporary shoring as required • placement/support of reinforcing steel/concrete fill for: • block lintels/bond beams July 2003 Masonry 13 Checklists Field Review / General Review • other wall areas where detailed • test samples of concrete taken as specified: • test reports issued promptly by testing and inspection agency ❑ cavity wall construction: • insulation does not sag/obstruct cavity • continuity of air barrier: • over entire wall surface inside cavity • laps sealed to adjacent air barrier material (e.g. at window frames) • monitor procedures to prevent accumulation of mortar droppings in cavity: • weep holes unobstructed by mortar droppings • vents unobstructed by soffits or fascias ❑ fire/acoustical separations: • where specified/noted on drawings • masonry carried up continuously through ceiling space to underside of floor/roof structure above: • leave specified clearance at top for deflection of structure above • fire stopping installed: • continuously for full length along top of wall • into flutes of steel deck, as required • voids filled with mortar around structural members/sleeves/pipes/ducts/fire dampers: • leave provision for structural deflection/movement where required • fire stopping installed • voids in acoustical separations caulked ❑ caulking: • matching selected colour(s) • backer rod where required • continuous application in all specified locations ❑ final cleaning: • excess mortar/smears removed • review proposed procedures and materials prior to commencement • select inconspicuous location for test application of approved cleaning product • cleaning not to proceed until test area approved ❑ clean-up: • all rubbish/surplus material removed from site promptly 14 Masonry July 2003 Field Review / General Review Checklists Checklist: 5. Metals 5.1 Structural Steel/Steel Joists/ Steel Deck ❑ before fabrication begins, submission of: • shop drawings stamped by registered professional engineer • mill test reports, upon request • welders’ qualifications for review by engineer ❑ storage of materials on site: • off ground • covered if stored for prolonged period • joists stored upright • steel deck in stacks, tilted to drain, covered ❑ protection: • all components free of scale/ other contamination • shop painted/galvanized/unpainted, as specified • field touch-up after welding: • field connections • bolt heads/nuts • welded areas • exposed cut galvanized edges • any other damaged surfaces ❑ steel joists: • bridging/anchorage/bottom chord extensions completed/true • special openings (e.g. for large ducts) aligned ❑ steel deck: • gauges as specified • flute closures/edge forms provided • special types (e.g. acoustic deck) ❑ erection: • anchor bolts’ size/location • base plates shimmed • grouted after frame alignment completed • temporary guys/braces: • left in place until alignment completed • studs (if specified for composite slabs) welded to beams/joists/directly or through deck ❑ fastening steel deck: • no welding until frame alignment completed • dirt/water removed prior to: • welding • placement of concrete topping/sound absorbing batts/roofing • puddle welds • side laps button punched/tack welded, as specified • closures/edge forms installed • closures around sleeves by other trades • edge reinforcement as specified around larger openings • special deck types correctly located ❑ inspection/testing: • review by testing and inspection agency of: • fabrication in plant • erection/fastening on site • test reports issued promptly by testing and inspection agency 5.2 Light Steel Framing ❑ storage of materials on site: • off ground • covered if stored for prolonged period ❑ immediately following delivery, examine all products: • metal gauges of framing members • promptly reject items not in conformance with specifications ❑ erection - frame construction: • anchor bolts: • size • located to fall between studs • sill runners leveled • joints in top runners located over studs/properly connected • all components set plumb/true/aligned • holes in studs aligned • studs in fire-rated walls cut short below top runner to allow for expansion • corners/intersections constructed to provide support for cladding July 2003 Metals 15 Checklists Field Review / General Review • studs doubled/tripled at sides of openings: • depending on opening width • screwed/crimped/welded together • blocking/bracing/fire stopping • placing of dampproof courses/air barrier as required • laps with adjacent air barrier material to maintain continuity • blocking/furring provided for fixing/ supporting wall-mounted cabinets, etc. • no unauthorized cutting/notching/drilling of framing members • temporary bracing: • left in place until sheathing installed 5.3 Metal Fabrications ❑ before fabrication begins, submission of: • shop drawings for all fabricated items • drawings for stairs/handrails/ guards stamped by registered professional engineer ❑ built-in items: • supplied for installation as concrete/masonry work proceeds ❑ workmanship: • all welds ground smooth ❑ protection: • shop painted/galvanized/unpainted, as specified • field touch-up after welding: • field connections • bolt heads/nuts • welded areas • any other damaged surfaces ❑ stairs/handrails/guards: • uniform run and rise in any one flight • heights/vertical element spacing/ returns/extensions as detailed ❑ inspection/testing: • review by testing and inspection agency of: • erection/fastening on site • load capacity of handrails/guards • test reports issued promptly by testing and inspection agency 16 Metals July 2003 Field Review / General Review Checklists Checklist: 6. Wood and Plastic 6.1 Wood Framing/Carpentry • protective coating on connectors/ ❑ before fabrication of glulam columns/beams or roof trusses begins, submission of: • shop drawings stamped by registered professional engineer • testing and inspection agency reports, as specified ❑ storage of materials on site: • off ground • covered • per glulam/truss manufacturer’s recommendations ❑ protection: • preservative treatment for all builtin/concealed components • protective covering on glulam members • reject members having structural defects/defects on parts to remain visible ❑ erection - frame construction: • anchor bolts: • size • located to fall between studs • sill plates leveled • plates lapped/joints staggered and located over studs/properly connected • minimum clearances maintained • 50 mm at chimneys/flues • joists set with crown up • all components set plumb/true/aligned • blocking/bracing/fire stopping • placing of dampproof courses/air barrier as required • laps with adjacent air barrier material to maintain continuity • blocking/furring provided for fixing/ supporting wall-mounted cabinets, etc. • no unauthorized cutting/notching/drilling of framing members • temporary bracing: • left in place until sheathing installed ❑ erection - structural timber/glulam: • fire protection provided during construction • temporary guys/braces installed as work progresses • left in place until no longer required fasteners undamaged • all field connections/scratched or marred surfaces touched up when erection completed • no unauthorized cutting/notching/drilling of framing members • authorized cuts made on site sealed • exposed work protected from weather/humidity after erection 6.2 Cabinet Work/Millwork ❑ before fabrication, submission of: • shop drawings • samples of materials • test reports/certificates, as specified • sample cabinet unit, as specified ❑ storage of materials on site: • heated/dry/secure • humidity within specified range • protective covering/cartons • do not remove until final inspection prior to commencement of installation ❑ preparation: • grounds/blocking/built-in anchors ❑ cabinetwork installation: • all components set plumb/true/aligned • spacers/scriber strips in place/snug • no unauthorized cutting/notching/drilling • backs/bottoms of cabinets backprimed/sealed, as specified • plastic laminate faced countertops: • underside finished with backing grade plastic laminate • underside of front overhang finished with plastic laminate • cabinet hardware: • installed • locks/latches/hinges/drawer guides function smoothly • doors/drawers operate freely without sticking • protected from dirt/damage until final occupancy July 2003 Wood and Plastic 17 Checklists Field Review / General Review ❑ millwork: • approved/specified grades/species • plumb/true/aligned • preservative treated/backprimed • fastenings secure/inconspicuous • splicing: • material installed in longest possible lengths • excessive splicing avoided • splices staggered • finishing: • free from splits/hammer marks • work sanded smooth • edges eased ❑ clean-up: • all rubbish/surplus material removed from site promptly 18 Wood and Plastic July 2003 Field Review / General Review Checklists Checklist: 7. Thermal and Moisture Protection 7.1 Wall Cladding ❑ before fabrication of prefabricated/proprietary cladding systems begins, submission of: • shop drawings stamped by registered professional engineer • test results, as specified • testing and inspection agency reports, as specified ❑ storage of materials on site: • off ground • covered • cladding systems components crated • check for damage during shipping ❑ before installation of cladding begins, review: • sheathing • anchorage/supports • continuity of air barrier: • over entire wall surface • laps sealed to adjacent air barrier material (e.g. at window frames) • through-wall flashing • provisions for vented cavity for exterior insulation and finishing systems (EIFS) ❑ installation - cladding: • corrosion-resistant fasteners • minimum clearances from adjacent construction maintained • EIFS: • control joints • flashing • weep holes/vents • cold weather precautions: • heated enclosures of work area to maintain minimum temperature of 10oC during application and for 48 hours thereafter ❑ installation - prefabricated/proprietary cladding systems: • fasteners/supports: • anchor bolts • girts/intermediate supports • connectors • protective coating on connectors/fasteners undamaged • all field connections/scratched or marred surfaces touched up when erection completed • all components set plumb/true • joints/unit alignment within specified tolerances • fire stopping at floors • placing of vents/dampproof courses/air barrier, as specified • laps sealed to adjacent air barrier material to maintain continuity • joints as specified: • sealed/caulked • gaskets • caulked/vented • open • site installed internal flashings • built-in flashings • no unauthorized cutting/notching/drilling ❑ cleaning/protection: • dust/smears removed • other cleaning to manufacturer’s recommendations • protective covering as required • all rubbish/surplus material removed from site promptly 7.2 Roofing/Flashing ❑ before installation begins, submission of: • samples of roofing/insulation • notification to roofing consultant prior to commencement/restarts/completion of work ❑ storage of materials on site: • rolls of membrane off ground/well ventilated/flat • covered/in original containers • solvent-based liquids away from excessive heat/open flame • granular surfacing material (if used) free from dirt/contamination • check for damage during shipping: • reject damaged material ❑ protection: • walls/other work from damage by roofing operations July 2003 Thermal and Moisture Protection 19 Checklists Field Review / General Review • materials from inclement weather: • reject damp material • avoid excessive loads on structure • parapets/roof edges • fence/barricade around ground operations: • kettle (if used) locked/removed nightly • cold weather precautions: • no work if air/substrate temperature below specified minimum • temporary walkways over finished areas ❑ workmanship - roofing: • roof deck: • clean/dry/free from ice/snow • dirt/water removed from steel deck flutes • roof drains/curbs in place/flashed • positive slopes to drains: • wells or tapered insulation at roof drains • sound absorbing batts placed in acoustic deck • continuity of air/vapour barrier: • over entire roof deck • laps with adjacent material at perimeter • work arranged to complete watertight application over insulation by end of each day: • includes base flashing/temporary sealing of exposed edges • granular surfacing material (if used) spread evenly • roof protection course/walkways installed • roof hatch(es)/plastic skylight(s)/ insulation breathers placed/built in ❑ workmanship - flashing: • fabrication: • not longer than specified maximum lengths • counter/through-wall flashings provided to masonry subcontractor for building in • coordinated with roofing installation • joints: • provision for expansion • equally spaced • protection from corrosion/electrolytic action: • underlay applied over masonry/ concrete/wood • backpainted where in contact with other metals • fastenings: • concealed • exposed permitted only where concealed not possible • counter flashings at roof hatch(es)/plastic skylight(s), as required • reglets caulked 20 Thermal and Moisture Protection July 2003 • finished surfaces free from buckling/dents/other defects ❑ inspection/testing: • review by roofing consultant of: • roof deck/curbs/roof drains prior to commencement • weather conditions • installation/workmanship • cut tests • test reports issued promptly by roofing consultant ❑ clean-up: • all rubbish/surplus material removed from site promptly • drains cleared 7.3 Shingles/Shakes ❑ before installation begins, submission of: • samples of shingles/shakes ❑ storage of materials on site: • off ground • covered/in original bundles/packages • check for damage during shipping: • reject damaged material ❑ examine substrate: • clean/dry • sheathing undamaged: • no knotholes/splits • no work to proceed until deficiencies corrected ❑ installation: • no installation of asphalt shingles if air/substrate temperature below specified minimum • eaves protection/air barrier/underlayment: • continuity • laps with adjacent material at perimeter • drip edge • exposure/joint width as specified • exposure/alignment • valley/hip flashings as specified: • sheet metal • composite membrane • roll roofing • counter flashing at walls/chimneys installed as shingling proceeds • saddles • roof vents ❑ clean-up: • all rubbish/surplus material removed from site promptly Field Review / General Review Checklists 7.4 Sealants ❑ before installation begins, submission of: • samples of each type of sealant specified • approved signed samples/colour boards retained on site • colours for selection by architect ❑ substrates: • clean/dry/free from foreign material • no incompatible sealers/coatings/release agents on surfaces to be caulked • commencement of work by caulking subcontractor implies acceptance ❑ preparation: • sides of joints primed • joint filler/bond breaker tape • backer rod as required ❑ installation: • quality control: • check containers periodically to confirm use of specified products • periodic review by manufacturer’s representative, as specified • no installation if air/substrate temperature below specified minimum • vents installed at bottom of masonry wall cavities • finished surface concave ❑ clean-up: • adjacent surfaces cleaned of excess material/droppings as work progresses • masking tape removed • all rubbish/surplus material removed from site promptly July 2003 Thermal and Moisture Protection 21 Field Review / General Review Checklists Checklist: 8. Doors and Windows 8.1 Steel Doors & Frames ❑ before fabrication begins, submission of: • shop drawings/schedules • samples as specified ❑ storage of materials on site: • off ground • frames stacked vertically • temporary spreaders in place • doors: • protected from damage • stacked doors separated by spacers • covered if stored for prolonged periods ❑ immediately following delivery, examine: • all items per schedules • welding, as specified • metal gauges • frame anchors: • type/number • reinforcement at: • corners • heads • hardware locations • top closures on exterior doors • labels on fire-rated doors/frames • check for damage/dents during shipment: • promptly reject incomplete/damaged units ❑ installation: • frames: • supported straight/level/plumb in preparation for building in to masonry • all anchors in place • continuity of air barrier at exterior walls: • positive seal to air barrier material around perimeter • filled solid with: • mortar for interior frames • insulation for exterior frames • doors: • hung straight/level/plumb • clearances as specified • hardware: • all scheduled items installed • locks/latches/hinges function smoothly • closers adjusted for: • correct degree of back checking • minimum force required to open door/positive latching of door • final adjustment after air-movement systems in operation • panic bars adjusted to release latch under prescribed operating force • doors operate freely/latch securely without sticking • rubber bumpers in place on frames ❑ protection: • field touch-up to all damaged surfaces following installation 8.2 Wood & Plastic Laminate Doors ❑ before fabrication begins, submission of: • shop drawings/schedules • samples as specified ❑ storage of materials on site: • heated/dry/secure • stored flat • off floor • wrapped/protected from damage • stacked doors separated by spacers ❑ immediately following delivery, examine: • all items per schedules • labels on fire-rated doors • check for damage during shipment: • promptly reject damaged units ❑ installation: • doors hung straight/level/plumb • reject warped doors • clearances/beveling as specified • tops/bottoms/edges of cutouts sealed/painted, as specified, immediately following final fitting • hardware: • all scheduled items installed • locks/latches/hinges function smoothly • closers adjusted for: • correct degree of back checking • minimum force required to open door/positive latching of door • final adjustment after air-movement systems in operation • doors operate freely/latch securely without sticking July 2003 Doors and Windows 22 Checklists Field Review / General Review • rubber bumpers in place on frames • first coat of paint/sealer to veneer-faced doors applied to both sides of door in same operation ❑ protection: • doors cleaned/dusted immediately following completion of installation • protected from construction damage ❑ clean-up: • all rubbish/surplus material removed from site promptly 8.3 Special Doors (Panel Folding Doors, Sectional Metal Overhear Doors) ❑ before fabrication begins, submission of: • shop drawings • wiring diagrams for power-operated doors • folding walls: • samples of partition finish • sound transmission test data ❑ installation: • entire assembly installed to manufacturer’s instructions • electrical connections completed for power-operated doors • operable parts adjusted: • sound seals to acoustically rated doors • exterior doors: • weatherstripping forms weathertight seal • accessories, as specified • operating components lubricated/adjusted • field touch-up to all damaged surfaces following installation ❑ final acceptance: • withheld until operation/maintenance manuals provided ❑ clean-up: • all rubbish/surplus material removed from site promptly 8.4 Aluminum Entrances/Screens, Windows & Skylights ❑ storage of materials on site: • window/glazing units stored upright/ off ground • wrapped/protected from damage • ventilators closed/tied shut until hardware installed ❑ immediately following delivery, examine: • all items per shop drawings/samples • glass types/thicknesses • finishes/hardware 23 Doors and Windows July 2003 • check for damage during shipment: • promptly reject damaged units ❑ installation: • blocking/anchorage • corrosion protection wherever aluminum members in contact with dissimilar metals/concrete/mortar/masonry • entrances/windows set plumb/square: • windows set into openings without forcing • fastenings concealed • continuity of air barrier: • positive seal to air barrier material around perimeter of entrance/window/ skylight frames • window sills: • positive slope • end caps, as specified • skylights: • internal drainage slots • condensate gutter • glazing: • sealing surfaces cleaned • clearances as specified around perimeter/in rebates • setting blocks • gaskets/tapes/sealant • test ventilators for operation/ friction adjustment • door hardware: • all scheduled items installed • closers adjusted for: • correct degree of back checking • minimum force required to open door/positive latching of door. • final adjustment after air-movement systems in operation • door release hardware: • panic bars adjusted to release latch under prescribed operating force. • power door operators function as specified. • doors operate freely/latch securely without sticking • screens, as specified • finishes protected ❑ final cleaning/adjustments: • droppings/strippable protective coatings removed • hardware adjusted for proper operation • glass/metal cleaned Field Review / General Review 8.5 Hardware ❑ before installation begins, submission of: • hardware list • samples as specified • master keying schedule: • forward to Owner for approval ❑ storage of materials on site: • clean/dry/locked area • each item packaged/labeled • inventory list maintained ❑ keying: • construction master key used until takeover by Owner: • cancelled by first use of building master key ❑ periodic inspections by hardware supplier, as specified: • replace defective/non-conforming items • check: • adjustment of closers • power door operators • issue reports/certificate of final inspection promptly ❑ clean-up: • all rubbish removed from site promptly for hardware installation refer to: 6.2 Cabinetwork/Millwork 8.1 Steel Doors & Frames 8.2 Wood & Plastic Laminate Doors 8.4 Aluminum Entrances/Screens 8.6 Glass & Glazing ❑ before installation begins, submission of: • samples as specified ❑ storage of materials on site: • packaged/labeled ❑ immediately following delivery, examine: • types/thicknesses/patterns as specified: • promptly reject items not in conformance ❑ glazing: • sealing surfaces cleaned • clearances as specified around perimeter/in rebates • setting blocks as required • gaskets/tapes/sealant • patterns/wires in wired glass lined up in adjacent lights • labels left in place until final cleaning ❑ final cleaning: • remove labels/sealant/paint • all glazing left clean/polished Checklists 8.7 Curtain Wall/Structural Sealant Glazing Systems ❑ arrange site meeting in advance of commencement of installation to review procedures and expectations with contractor and installation subcontractor ❑ before fabrication of curtain wall systems begins, submission of: • shop drawings stamped by registered professional engineer • samples/product data as specified • mock-up(s), as specified • testing and inspection agency reports, as specified • test reports indicating that wall system meets or exceeds specified performance standards • evidence that insulating glass complies with specified standard ❑ storage of materials on site: • curtain wall panels/glazing units stored upright/off ground • wrapped/protected from damage • ventilators closed/tied shut until hardware installed ❑ immediately following delivery, examine: • all components per shop drawings/samples: • finishes/colours • check for damage during shipment: • protective coatings/lacquers • promptly reject damaged units ❑ installation: • anchorage: • clips/angles/hangers alignment checked/verified • noncorrosive • tightened after alignment of curtain wall/glazing system • scratched or marred surfaces touched up when erection completed • corrosion protection wherever aluminum members in contact with dissimilar metals/concrete • all components set plumb/true/aligned: • joints sealed • no installation of sealants if air/substrate temperature below specified minimum • expansion joints: • sizes/locations as detailed/specified • fastenings concealed • reinforcement to framing members as specified July 2003 Doors and Windows 24 Checklists Field Review / General Review • fire stopping at floor slab edges/ other intersections • flashing/air barrier: • positive seal to air barrier material around perimeter • flashings in place • weep holes/drainage systems clean • thermal/acoustical insulation • loose insulation where required to maintain continuity of thermal barrier • glazing: • sealing surfaces cleaned • clearances as specified around perimeter/in rebates • setting blocks • gaskets/tapes/sealant • structural sealant glazing installed to manufacturer’s recommendations • debris removed from interior of curtain wall panels • test ventilators for operation/ friction adjustment • screens, as specified • finishes protected • surfaces cleaned • damaged materials/finishes repaired/replaced ❑ inspection/testing: • quality of installation/glazing monitored by specialist testing and inspection agency, as specified • promptly issue instructions for corrective work as required/recommended by specialist testing and inspection agency ❑ final cleaning/adjustments: • droppings/strippable protective coatings removed • glass/metal cleaned 25 Doors and Windows July 2003 Field Review / General Review Checklists Checklist: 9. Finishes 9.1 Gypsum Wallboard & Plastering ❑ before installation begins, submission of: • designs/test reports for fire-rated assemblies ❑ storage of materials on site: • no outside storage • dry/clean • wallboard stacked flat without overhanging boards ❑ immediately following delivery, examine: • metal gauges • hanger rods • wallboard types/thicknesses • plastering materials • promptly reject items not in conformance with specifications ❑ partitions: • anchored securely to floors/columns/walls • studs doubled-up at jambs • studs carried up continuously through ceiling space to underside of floor/roof structure above: • unless noted otherwise • top support provides for deflection of structure • bracing above suspended ceiling level, as required • partitions true plane/plumb • holes in studs aligned • framing/reinforcing/blocking for recessed/wall-hung items • access panel frames built-in • wood grounds/metal or gypsum lath/corner beads/casings for plaster as required • studs/sills/top plates around entire perimeter of sound-attenuating partitions set in acoustical sealant, both sides, before application of wallboard ❑ ceiling suspension/bulkheads/furring: • hanger spacing • additional hangers to support light fixtures/grilles/diffusers/other built-in items • access panel frames built-in • bracing • secondary framing below large ducts • furring channels: • spacing between channels/from boundary walls, etc. • fixed securely to runner channels • splices • all work true plane/level/plumb • wood grounds/metal or gypsum lath/corner beads/casings for plaster as required ❑ wallboard application: • before closing-in commences: • inspections of all built-in mechanical/electrical work performed by engineers/Authorities Having Jurisdiction • no work unless temperature maintained within specified range for minimum 24 hours before installing wallboard until after joint cement/adhesives cured: • temporary heat provided as required • adequate temporary lighting/ventilation • wallboard installed clear of floor • joints on opposite sides of assemblies staggered/layers staggered • screw spacing • corner/casing beads • control joints • compressible tape separating wallboard from exterior door/window frames • water-resistant wallboard applied in specified/scheduled locations • edges sealed ❑ joint finishing: • joint tape • taping compound feathered out • screw head depressions finished flush/smooth • lightly sanded • completed work smooth/level/plumb, ready for painting ❑ fire-rated partitions/assemblies: • tested/labeled materials only • complete rated assembly, including wallboard, carried up continuously through ceiling space to underside of floor/roof structure above: July 2003 Finishes 26 Checklists Field Review / General Review • if partition falls under steel joist/beam, continuity of rated separation maintained by wallboard enclosing joists/sprayed fireproofing on beams, or other means as specified • fire stopping: • continuously for full length along top of partition • into flutes of steel deck, as required • in voids around structural members/ sleeves/pipes/ducts/fire dampers • leave provision for structural deflection/movement when required ❑ sound-attenuating partitions: • insulation as specified • acoustical sealant around: • perimeter of partitions, not visible • pipes/conduits/outlet boxes: • backs/sides of outlet boxes coated with sealant ❑ plastering: • no work unless temperature maintained within specified range: • temporary heat provided as required • adequate temporary lighting/ventilation • mixing • application • finished work true/even plane • colours/textures as scheduled/specified ❑ clean-up: • all rubbish/surplus material removed from site promptly 9.2 Ceramic, Quarry & Terrazzo Tile ❑ before installation begins, submission of: • samples • tile setting drawings as specified • maintenance instructions ❑ storage of materials on site: • in original containers ❑ immediately following delivery, examine: • tile • setting/grouting materials • promptly reject items not in conformance with specifications ❑ mock-up panel(s) (if specified): • install in location approved by architect: • may be incorporated into permanent structure • must incorporate all components/ materials/conditions specified • establishes standard for workmanship/appearance: 27 Finishes July 2003 • grouted joints • tile patterns • grinding/polishing precast terrazzo tile • tile work not to proceed until sample panel approved • left in place until tile work completed ❑ substrates: • clean/dry/free from foreign material • commencement of work by tiling subcontractor implies acceptance ❑ installation: • no installation if air/substrate temperature below specified minimum • broken/chipped tiles rejected • floor tile: • layout per setting drawings or preplanned to be symmetrical within walls • perimeter tiles minimum half-size • waterproof membrane, as specified • tile cut neatly around fitments/drains • control joints • joints uniform/aligned • tiles sounded/hollow tiles removed/replaced • finished level to specified tolerance/ positive slope to drains • grouting fills joints solid • precast terrazzo tile ground/polished • foot traffic prevented until grout fully set • wall tile: • joints uniform/aligned • accessories/trim located accurately • tiles sounded/hollow tiles removed/replaced • finished surface plumb/true • grouting fills joints solid ❑ clean-up: • all rubbish/surplus material removed from site promptly 9.3 Acoustical Ceilings ❑ before installation begins, submission of: • samples as specified • approved signed samples retained on site • designs/test reports for fire-rated assemlies ❑ storage of materials on site: • in original containers ❑ immediately following delivery, examine: • acoustical panels/grid: • labeling of fire-rated materials. • promptly reject items not in conformance with specifications Field Review / General Review ❑ installation: • no installation if air/substrate temperature below specified minimum • materials stored in work area minimum 48 hours prior to installation after humidity reaches acceptable level ❑ ceiling grid: • centred in room or as detailed • longest practical lengths of components used • hangers: • anchorage/fixing to ceiling/ structure above • spacing • additional hangers to support light fixtures/grilles/diffusers/other built-in items • grid: • level/true • provision for thermal movement • secondary/heavier framing below large ducts • scratched/damaged components rejected/replaced ❑ acoustical panels: • no installation of acoustical panels if humidity above specified maximum: • panels will sag if installed while humidity inside building too high • to lower humidity quickly may require operating permanent ventilation/air conditioning system • may force postponing panel installation, even until after specified occupancy date required by Owner: • should not prevent occupancy from proceeding (unless ceiling system is a fire-rated assembly) • advise Owner, explaining necessity for delay in panel installation • if building already occupied when humidity level has dropped to acceptable level: • panel installation must be scheduled so as not to interfere with Owner’s use • no additional cost unless justified by circumstances beyond contractor’s control • broken/damaged panels rejected • before panel installation commences: • inspections of all above-ceiling work, including: • fire/smoke/acoustical separations • mechanical work/fire dampers • electrical work Checklists ❑ fire-rated assemblies: • tested/labeled components only. • acoustical panels installed with holddown clips • recessed light fixtures enclosed • additional hangers to support fire stop flaps. ❑ clean-up: • all rubbish/surplus material removed from site promptly 9.4 Wood Flooring ❑ before installation begins, submission of: • samples • maintenance instructions ❑ storage of materials on site: • clean/dry/ventilated/secure areas • minimum temperature as specified ❑ immediately following delivery, examine all products: • promptly reject items not in conformance with specifications ❑ substrates: • clean/dry/free from foreign material • commencement of work by flooring subcontractor(s) implies acceptance ❑ job conditions: • no installation if: • air/substrate temperature not within specified minimum/maximum range, before/during/after installation • humidity in area of installation above specified maximum • substrate moisture content not within specified minimum/maximum range • materials stored in area of work specified minimum time prior to installation ❑ installation - wood strip flooring: • membrane dampproofing, as specified • sleepers, as specified: • shimmed/leveled • butt joints staggered • expansion space at walls/obstructions • sheathing: • stagger/offset joints • expansion space at joints • flooring: • warped/twisted pieces rejected • butt joints staggered/separated by at least two strips • small strips distributed evenly/never near others • joints driven up tight • tongues undamaged July 2003 Finishes 28 Checklists Field Review / General Review • finishing: • sanded smooth/true • materials/number of coats as specified • vacuumed • foot traffic prevented until finish thoroughly dried • perimeter base fixed to wall/clear of floor surface • thresholds fixed to adjacent rigid floor ❑ installation - wood parquet flooring: • primer applied to concrete subfloors • when wood subfloor on sleepers used: • same procedures as for wood strip flooring • adhesive application: • limited to area which can be covered before adhesive working time expires • adhesive which has set up removed before flooring placed • flooring: • lay out from centre of room/to specified pattern • perimeter units minimum half-size • joints aligned • units rolled per manufacturer’s recommendations • check adhesive coverage: • remove random parquet units • replace immediately if coverage acceptable • finishing: • sanded smooth/true • vacuumed • foot traffic prevented until finish thoroughly dried ❑ clean-up: • completed floors protected until Owner’s takeover • all rubbish/surplus material removed from site promptly 9.5 Resilient Flooring ❑ before installation begins, submission of: • samples of all products • resilient sheet flooring: • mock-ups of interior/exterior integral cove bases • shop drawings showing seaming layouts/treatment at adjacent conditions • maintenance instructions for all products ❑ storage of materials on site: • clean/dry/secure areas • minimum temperature as specified ❑ immediately following delivery, examine all products: 29 Finishes July 2003 • promptly reject items not in conformance with specifications/colour schedule ❑ substrates: • clean/dry/free from foreign material/coatings • free from carbonization/dusting • commencement of work by flooring subcontractor(s) implies acceptance ❑ job conditions: • no installation if: • air/substrate temperature not within specified minimum/maximum range, before/during/after installation • substrate moisture content above specified maximum ❑ installation - resilient tile flooring/base: • substrate preparation: • ridges/bumps ground smooth • leveling compound applied: • to fill low spots/cracks/joints, leaving smooth hard surface • at doorways/adjacent flooring materials to make finished surface flush with adjacent finishes • foot traffic prevented until filler cured • entire area dry vacuumed prior to application of adhesive • adhesive application: • limited to area which can be covered before adhesive working time expires • waterproof adhesive used on slabs on grade • adhesive which has set up removed before flooring placed • flooring: • laid out from centre of room/to specified pattern • perimeter units minimum half-size • joints aligned • colour variations evenly distributed • flooring rolled as installation proceeds • specified edging/trim installed at junction with adjacent flooring materials • base: • fix to prepared substrate • firm contact at wall & floor • joints minimized • internal corners coped • external corners premoulded • scribed neatly to door frames/ other obstructions • toeless base installed in carpeted areas before carpet • extra materials left for Owner as specified Field Review / General Review ❑ installation - resilient sheet flooring: • substrate preparation: • same procedure as for resilient tile flooring • sheet flooring allowed to relax in area of installation for specified minimum time prior to installation • adhesive application: • same procedure as for resilient tile flooring • flooring: • installation procedures to manufacturer’s recommendations • flooring rolled as installation proceeds • watertight seal provided at all penetrations/pipes through floor • joints: • minimized • widths/lengths largest possible • staggered • double-cut • heat welding, as specified: • no welding to start until after minimum time specified for adhesive to set has passed • all seams/joints welded • integral coved bases formed/ mitred/welded, as scheduled/specified • foot traffic/rolling loads prevented until adhesive thoroughly set ❑ clean-up: • excess adhesive removed as work proceeds • floors cleaned, waxed as specified • completed floors protected until Owner’s takeover • all rubbish/surplus material removed from site promptly 9.6 Carpeting ❑ before installation begins, submission of: • samples • seaming diagrams • maintenance instructions: • cleaning/repair procedures • recommended solvents/ techniques/equipment ❑ storage of materials on site: • clean/dry/locked area • minimum temperature as specified • carpet: • in protective waterproof covering • no hoisting by ropes: • only wide straps used • each roll labeled/numbered showing run/dye lot Checklists ❑ immediately following delivery, examine all products: • promptly reject items not in conformance with specifications/colour schedule ❑ substrates: • clean/dry/free from foreign material/coatings • compatibility of adhesive with concrete curing membrane, if used • commencement of work by carpeting subcontractor implies acceptance ❑ job conditions: • no installation if: • air/substrate temperature not within specified minimum/maximum range, before/during/after installation • humidity in area of installation above specified maximum • substrate moisture content not within specified minimum/maximum range ❑ quality control: • periodic review by manufacturer’s representative, as specified ❑ carpeting: • no installation until after all finishing work completed, except: • acoustical ceiling panels delayed by interior humidity conditions (refer to section 9.3) • demountable partitions • floor pedestals for power/communications • substrate preparation: • primer applied to concrete subfloors • ridges/bumps ground smooth • leveling compound applied to fill low spots/cracks/joints • entire area dry vacuumed • installation: • to manufacturer’s recommendations • carpeting unrolled in area scheduled for installation for specified minimum time prior to installation/cutting • sections of carpet cut/dry laid all in same direction to: • permit confirmation of colour/ pattern match • maintain constant pile direction • butt joints kept to minimum • chalk line snapped on floor to mark seam location nearest centre of room/area • adhesive application: • waterproof adhesive used on slabs on grade July 2003 Finishes 30 Checklists Field Review / General Review • carpet sections folded back half width lengthwise from chalk line • adhesive spread uniformly both sides of chalk line • each section of carpet rolled onto adhesive • trapped air smoothed out using heavy roller rolling towards seam • overlapping edges of carpet sections double-cut using straightedge • one edge rolled back: • seaming adhesive applied to edge • carpet fitted into place against adjacent carpet section to form tight seam • sequence repeated over entire floor area • carpet trimmed/fitted neatly at walls/columns/other obstructions • adhesive spots removed immediately as work proceeds • accessories: • carpet grippers installed at perimeter • binder bars installed on carpet edge, centred in door openings • prevent traffic over carpet for specified minimum time • extra materials left for Owner as specified ❑ clean-up: • dirt/scraps removed • carpet vacuumed • loose pieces of yarn removed • completed floors protected until Owner’s takeover • all rubbish/surplus material removed from site promptly • paint: • in sealed, originally labeled ❑ ❑ ❑ ❑ ❑ 9.7 Painting/Special Finishes/ Wall Coverings ❑ before installation begins, submission of: • paint/finishes material lists • samples, as specified: • special finishes • wall coverings • maintenance instructions • warranties as specified ❑ storage of materials on site: • ventilated/secure area • flammable materials storage area approved by Authorities Having Jurisdiction • fire protection equipment in storage area • minimum temperature as specified • used rags stored in closed metal containers removed from premises daily 31 Finishes July 2003 ❑ containers bearing: • manufacturer’s name • coating and finishing systems reference numbers, if applicable • special finishes: • in sealed, originally labeled containers • wall coverings: • each roll labeled/numbered immediately following delivery, examine all products: • promptly reject items not in conformance with specifications/colour schedule mock-ups: • samples of work, as specified • locations approved by architect substrates: • clean/dry/free from foreign material/coatings • commencement of work by painting/ finishing subcontractor implies acceptance job conditions: • no installation if: • air/substrate temperature below specified minimum, before/during/ after installation • humidity in area of installation above specified maximum • substrate moisture content above specified maximum • ventilation/lighting inadequate quality control: • painting inspection by field quality control inspector, as specified • special finishes review by product manufacturer’s representative, as specified application - painting: • protection: • drop cloths/masking adjacent surfaces not to be painted • hardware/grilles/cover plates etc. removed/masked • removed items replaced after painting completed • ‘wet paint’ signs posted • substrate preparation: • surfaces filled/smoothed to eliminate irregularities • tested for moisture content/alkalinity • application: • to manufacturer’s recommendations • number of coats: Field Review / General Review • not less than as specified • as required to achieve even, full coverage • first coat tinted to differentiate from second coat • suction spots touched up after first coat applied • sanding/dusting between coats to remove defects • adequate drying time allowed between coats • finished work fully hiding/uniform in sheen/colour/texture: • require entire plane of incomplete/unsatisfactory coverage to be repainted • patching not acceptable • no painting of exterior surfaces: • during cold/windy/rainy/frosty weather • when temperature below specified minimum • when surfaces damp/exposed to hot sun • bottoms/edges/tops/cutouts of doors sealed/painted: • visible edges of plastic laminate faced doors painted to match plastic laminate colour • upper surfaces/projecting ledges finished: • above/below sight lines • use small mirror to check concealed surfaces • inside of ductwork painted where visible • extra materials left for Owner as specified ❑ application - special finishes: • protection: • drop cloths/masking adjacent surfaces not to be painted • special finishes applied before adjacent work painted • ‘wet paint’ signs posted • substrate preparation: • surfaces filled/smoothed to eliminate irregularities • tested for moisture content • application: • to manufacturer’s recommendations • no application over non-hardening sealants/caulking • substrate surfaces primed/allowed to dry • finished work even/uniform in colour/ free from defects/matching approved samples • arrange random tests by product manufacturer’s representative to verify minimum dry film thickness of coatings, as required Checklists • finishes made good after tests completed ❑ installation - wall coverings • preparation: • wall covering unwrapped in area of installation for specified minimum time before application • substrate surfaces: • prepared to manufacturer’s recommendations • sealed/sized • installation: • rolls used in numerical sequence • panels placed consecutively in order cut from roll: • including spaces above/below windows/doors/other penetrations • alternate strips reversed except on match patterns • adhesive applied to substrate or fabric back, as specified • non-matched patterns hung with overlapped edges: • double-cut through both thicknesses using metal back-up strip to prevent damage to substrate • no cutting at corners: • unless pattern/colour change • fabric wrapped 150 mm beyond inside/outside corners • no horizontal seams • excess adhesive removed as work progresses • finished work: • smooth/clean • free of wrinkles/gaps/overlaps/ air pockets • finished surfaces/exterior corners protected from damage until Owner’s takeover • extra materials left for Owner as specified ❑ clean-up: • all rubbish/surplus material removed from site promptly July 2003 Finishes 32 Field Review / General Review Checklists Checklist: 10. Specialties ❑ before installation begins, submission of: • shop drawings/schedules • samples as specified • templates for: • locating threaded studs through ceilings for ceiling-hung toilet partitions • attachment of washroom accessories ❑ storage of materials on site: • dry/warm/secure area • in original unopened packages/protective covering, as appropriate • large louvre units stored upright/off ground/in original temporary protective frames ❑ immediately following delivery, examine all products: • metal gauges of metal lockers • promptly reject items not in conformance with specifications ❑ substrates: • true/rigid/free of irregularities • commencement of work implies acceptance ❑ chalkboards/whiteboards/ tackboards/pegboards: • installed after completion of painting: • parallel to floor/rigid/secure/plumb • trim: • mitred corners/butt joints hair-line fit/free of rough edges • all fastenings concealed: • toggle bolts or equivalent used for fastening to hollow-core masonry • horizontal sliding units operate freely • vertical sliding units correctly counter-balanced • direct-mounted tackboard fully adhered to substrate • all surfaces cleaned after installation completed ❑ toilet partitions: • installed after completion of painting/special finishes: • secure/plumb/square • secondary steel framing in place to support ceiling-hung partitions • colours as scheduled • protective covering left on until immediately prior to final review • fixing brackets fastened securely to walls: • toggle bolts or equivalent used for fastening to hollow-core masonry • uniform spaces between walls and end panels/pilasters • floor/ceiling adjustable pilaster fixings concealed by stainless steel shoes • hardware: • all specified items installed (note: confirm whether School Board policy requires that coat hooks be omitted) • adjusted/aligned • doors set to hold open at 30o • outswinging doors equipped with door pulls ❑ louvres & vents: • note: may be specified in architectural or mechanical divisions • blocking/anchorage • fastenings concealed • continuity of air barrier: • positive seal to air barrier material around perimeter of louvres/ connecting ducts • sills: • positive slope • bird screens attached to inside faces, as specified • finishes protected ❑ wall & corner guards: • installed to solid backing/blocking: • straight/level/plumb • fastenings concealed wherever possible • finishes protected ❑ metal lockers: • colours/colour arrangement as scheduled • installed to solid backing/wood grounds: • secure/straight/plumb • closures/trim/filler panels to complete installation • finished end/back panels to exposed ends/backs • numbers • locks as specified July 2003 Specialties 33 Checklists Field Review / General Review ❑ demountable partitions: • installation: • after completion of floor finish(es) • to manufacturer’s recommendations • runners fastened to floor/abutting vertical surfaces/ceilings: • ceiling fasteners rigidly support partition without damage to ceiling grid/panels • partitions erected plumb/square/level: • fitted accurately to abutting surfaces • shimmed at floor as required • continuous light/sound seal around perimeter • secure fixing to floor to provide lateral stability for rail-height partitions • battens applied to joints, as specified ❑ washroom accessories: • review each location prior to installation for: • potential conflict with door swings/exit widths/disabled accessibility • correct recess dimensions, including depth • promptly issue instructions for required changes/relocations • installed to manufacturer’s recommendations/ true/plumb/level/straight/tightly fitted/secure • fasteners match material/finish of item when exposed to view • operating units adjusted • damaged/defective units removed/replaced ❑ clean-up: • all rubbish/surplus material removed from site promptly 34 Specialties July 2003 Field Review / General Review Checklists Checklist: 15. Mechanical ❑ plumbing & drainage - underground/ underfloor work: • locations of piping correspond accurately with future connections to risers/fixtures • buried copper lines type K certified for underground use • floor drain(s): • clamped to vapour barrier membrane • uncompleted piping closed off/sealed at end of each work day • testing/inspection: • inspect underfloor drains prior to pouring of floor slab • ball/water tests of gravity drainage piping ❑ plumbing & drainage - roughing-in: • fire protection precautions taken during soldering • no unauthorized cutting/notching/drilling of framing members • drains/vents sloped • dielectric couplings between dissimilar metals • copper piping wrapped with tape against metal studs • shutoff valves: • at all fixtures • accessible • entire system tested/inspected before walls closed in ❑ plumbing & drainage - fixtures: • placement of sinks in countertops clarified/confirmed prior to commencing installation • blocking/brackets provided to support wall-mounted fixtures • floor/shower drains: • clamped/sealed to waterproofing membrane • all water/drainage connections completed: • exposed piping chrome-plated • escutcheons/flanges/cover plates installed • fixtures: • installed level/true • undamaged/protected until Owner’s takeover • damaged fixtures/fittings removed/replaced • check operation of all fixtures/fittings • no use of fixtures permitted until system completed/tested ❑ heating/ventilating: • natural ventilation: • unobstructed openable ventilation areas (usually windows): • minimum unobstructed area obtained when fully opened • equipped with screens • exhaust fans: • principal exhaust fan manual or automatic: • manual control switch centrally located/labeled ventilation fan • supplemental exhaust fans: • in each kitchen/bathroom/water closet room • duct diameter/length per building code • manual switch located in room served • mechanical ventilation: • in buildings where ventilation systems coupled with forced air heating systems: • forced air heating system circulation fan controlled by manual switch located adjacent to principal exhaust fan switch/labeled circulation fan • in buildings where: • ventilation systems not coupled with forced air heating systems or • building does not contain a forced air heating system: • outdoor air distributed by ductwork from heat recovery ventilator to interior per OBC • doors undercut/louvred/with grilles to provide for free flow of ventilation air to all rooms • heat recovery ventilator: • may function also as principal exhaust fan July 2003 Mechanical 35 Checklists Field Review / General Review • if building heated by forced air heating system, supply side of heat recovery ventilator usually connected to return air side of heating system • free-flowing condensate drain provided if ventilator installed in unheated space • outdoor intake/exhaust openings: • located to avoid contamination of ventilation air: • by exhaust air • from other local sources • bottom of air intake located above expected snow accumulation/minimum 450 mm from finished ground level, whichever is greater • bottom of exhaust outlet located minimum 100 mm above finished ground level/other horizontal surface • louvres/weather cowls/screens of corrosion-resistant material • combustion air: • provided from within building envelope except if building heated by forced air heating system • solid fuel-fired combustion appliances: • carbon monoxide detector required • ductwork: • supported/clipped to prevent sagging/excessive movement/vibration • no unauthorized cutting/notching/ drilling of framing members ❑ clean-up: • all rubbish/surplus material removed from site promptly 36 Mechanical July 2003 Field Review / General Review Checklists Checklist: 16. Electrical ❑ before fabrication/installation begins, submission of: • shop drawings/wiring diagrams/data sheets • short circuit/coordination studies, as specified ❑ site work: • trenching/backfilling: • refer to procedures in section 2.2 • concrete bases for pole lights correctly located • concrete duct banks: • minimum slope as specified • ducts supported/spaced by base/intermediate spacers • duct joints staggered in adjacent layers • duct interiors cleaned as specified immediately after concrete poured • refer also to section 3.1 • direct buried cable ducts: • minimum slope as specified • duct interiors cleaned as specified • concrete base for pad-mounted transformer correctly located ❑ service entrance board/panel boards/motor control centres: • concrete bases laid out by electrical subcontractor for installation by others • sprinkler drip-proof hoods as required • clearances/access around panels to Code ❑ conduits/busways/cable trays: • in concrete/masonry: • anchors/sleeves/inserts provided for building in • all encased conduit placed/supported • locations of floor outlets confirmed prior to concrete pouring • minimum concrete coverage • conduits/crossovers located in middle third of concrete slabs/walls • parallel conduits spaced in concrete slabs • not more than specified maximum number of parallel conduits in any bay of slab/wall • large conduit coordinated with required additional thickness of slabs on grade • refer also to sections 3.2 & 3.3 • conduit prepared for placement in masonry walls as erection proceeds • in above-ceiling spaces: • in locations/at levels agreed in pre- ❑ ❑ ❑ ❑ construction meeting (refer also to section 1) • conduit/busways/cable trays installed so as not to conflict with structure/light fixtures/mechanical trades/access wiring in wood framed partitions: • no unauthorized cutting/notching of framing members outlets/service fittings: • weatherproof type: • exterior of building/damp locations • outlet box locations: • as specified/scheduled/shown on drawings • switches accessible/adjacent to room entrance(s)/clear of opened doors • receptacles clear of built-in cabinetwork • cover plates: • material/finish/type/ganging • installed plumb/true • not bowed/dished lighting fixtures: • damaged/broken fixtures removed/replaced • supported independently of suspended ceilings • fixture mountings suitable to ceiling type • recessed/semi-recessed fixture frame/trim types correct for ceiling conditions • fixtures in continuous/broken rows aligned accurately • fixtures in mechanical/service rooms installed after all equipment in place, located to clear all obstructions/hangers • wire guards as specified • exit signs visible: • from every location along exit route • from within every room, as required special systems, as specified: • occupancy sensor lighting control devices: • sensor locations tested in each space to determine most suitable location July 2003 Electrical 37 Checklists Field Review / General Review • additional cable provided to each sensor to permit relocation as required • intercom/paging/clock system: • audibility of intercom/paging speaker in every room • all clocks display same/correct time • sound systems: • automatically muted when intercom/ paging emergency page operated • assistive listening devices: • inductive loop system in floor slab fully installed/tested prior to pouring slab • fire alarm system: • audibility of alarm throughout building • visible alarms, as required, visible throughout each floor area where specified ❑ prior to project completion: • as-built drawings/manuals submitted • systems demonstrations/training provided to engineer/Owner/Authorities Having Jurisdiction, as specified • inspections/tests carried out/ certificates received ❑ clean-up: • clean lighting reflectors/lenses/ other surfaces • all rubbish/surplus material removed from site promptly 38 Electrical July 2003