UNIVERSITI TEKNOLOGI MARA CENTER OF STUDIES FOR QUANTITY SURVEYING FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING LECTURE SCHEDULE SESSION : MARCH - AUGUST 2022 PROGRAMME COURSE COURSE CODE SEMESTER CREDIT HOURS LECTURE HOURS (PER WEEK) MEDIUM OF TEACHING LECTURER : BACHELOR OF QUANTITY SURVEYING (Hons) : MEASUREMENT OF CONSTRUCTION WORKS V : BQS601 : 05 :4 :5 : ENGLISH : PN NOR AZMI BINTI AHMAD BARI 1.0 OBJECTIVES Upon completion, students should be able to: CLO1 Demonstrate the ability to interpret drawings, specifications and producedraft bills for construction works. CLO2 Apply principles in measurement for building construction works. PLO2 PLO3 2.0 SYNOPSIS The course is designed to provide a further understanding of measurement of building works on external works, understanding and compilation of Prime Cost Sum, Provisional Sum and Preliminaries. 3.0 MODE OF DELIVERY No 1 2 Types Online Lecture Assignment/Tutorial Descriptions Google Meet/ Zoom/ YouTube/ Video Recording/ WhatsApp/Telegram/ Email/ Microsoft Team U-Future/ Google Drive/ Google Classroom/ Email/ WhatsApp/ Telegram 4.0 ASSESSMENTS No 1 2 CLO 1 PLO 2 2 3 Assessment Assignment/Tutorial % 50 Final Assessment 50 Sub-assessment Group Work Assignment/Tutorial 1 Assignment/Tutorial 2 Test Online Final Assessment Total % 20 10 10 10 50 100 5.0 READING LIST No 1 2 3 4 Title Pengukuran Kuantiti Bangunan (Edisi Kedua) (2004) Construction quantity surveying a practical guide for the contractor's QS (2012) Building Quantities Explained (1998) Author Ahamad Abdullah& Khairuddin Abd. Rashid Towey, D. Publisher PearsonPrentice Hall Wiley-Blackwell London Seeley, I. H Elements of Quantity Surveying (5th ed.)(1998) Willis, A. J. et al London: Palgrave Macmillan London: Blackwell Science (UK) 6.0 LECTURE SCHEDULE Week Date Topic 1 28/3 – 1/4 Introduction to the course and syllabus covered 2 4/4 – 8/4 Preliminaries, Prime Cost Sum & Provisional Sum 3 11/4 – 15/4 4 5 18/4 – 22/4 Remarks Group Assignment (20%) Submission via Ufuture/GC/ E-mail Assignment 1 (10%) Submission via Ufuture/GC/ E-mail Surface Water Drainage Surface Water Drainage (cont’d) Surface Water Drainage (cont’d) 25/4 – 29/4 Assessment MID-SEMESTER BREAK DAN HARI RAYA EIDUL FITRI [30/4/2022 – 8/5/2022] 6 9/5 – 13/5 Sewerage 7 16/5 – 20/5 Sewerage (cont’d) 8 23/5 – 27/5 Water Reticulation 9 6/6 – 10/6 10 13/6 – 17/6 CUTI KHAS PERAYAAN HARI GAWAI [28/5/2022 – 5/6/2022] Roadworks & Pavements Assignment 2 (10%) 11 20/6 – 24/6 12 27/6 – 1/7 Submission via Ufuture/GC/ E-mail Roadworks & Pavements (cont’d) Fencing & Gate Fencing & Gate (cont’d) 13 4/7 – 8/7 Landscape 14 11/7 – 15/7 Revision and Test Test (10%) STUDY WEEK (16 – 24 JULY 2022) FINAL ASSESSMENT (25 JULY – 14 AUGUST 2022) Submission via Ufuture/GC/ E-mail