Test Report of Harened Concrete Cubes for Reinforced Concrete
To / Shahan Company - Special Request
Contractor Name :
Project Name :
Casting location:
Shahan Company
Shahan Tower
Slab (Level +21.64)
Page Number
1 of 2
Lab. Number
Casting date
Receiving date
Testing Date for 7 Days
Testing date for 28 Days
Req. Strength
N/mm²
2 / 2021
13 November 2021
14 November 2021
20 November 2021
11 December 2021
55.0
Group No.
A
B
C
Spec. No.
4
1
5
1
4
1
Age (Days)
7
Length (mm)
Width mm
Height (mm)
Mass (kg)
Density
(kg/m³)
Cross-Sec.
Area (mm²)
Max. Load
(KN)
Comp. Strength
(N/mm²)
150
150
150
8.256
2446
22500
1330.2
59.12
150
150
150
8.254
2446
22500
1421.6
63.18
150
150
8.245
2443
22500
1466.8
65.19
62.50
45
8.256
8.254
8.245
2446
2446
2443
22500
22500
22500
1415.3
1480.1
1561.7
62.90
65.78
69.41
66.03
52.0
70.74
65.11
69.32
68.39
52.0
69.96
71.03
63.36
70.77
55.17
66.06
52.0
62.79
71.07
69.74
67.87
52.0
67.40
69.88
68.72
68.67
52.0
150
Average Strength N/mm²
1
1
2
3
7
150
150
150
150
150
150
150
150
150
Average Strength N/mm²
2
1
2
3
28
150
150
150
150
150
150
150
150
150
8.290
8.280
8.250
2456
2453
2444
22500
22500
22500
1591.7
1465.0
1559.7
Average Strength N/mm²
A
3
1
2
3
4
5
28
150
150
150
150
150
150
150
150
150
149
150
150
150
150
149
8.310
8.440
8.470
8.468
8.520
2462
2501
2510
2509
2558
22500
22500
22500
22500
22350
1574.1
1598.2
1425.6
1592.3
1233.0
Average Strength N/mm²
4
1
2
3
28
150
149.5
150
150
150
149.5
149
149.5
149
8.368
8.338
8.386
2496
2487
2510
22500
22425
22425
1412.8
1593.7
1563.9
Average Strength N/mm²
5
1
2
3
28
150
149.5
150
150
150
150
150
149.5
150
8.344
8.416
8.482
2472
2510
2513
22500
22425
22500
1516.5
1567.1
1546.2
Average Strength N/mm²
Batch Pant QA/QC Engineer
Eng. Khalid Qasim
Batch Plant Manager
Eng. Qays Harbi
Min Strength
(N/mm²)
Shahan Tower P.M
Eng. Yunis
Hiwa Batch Plant
No. :
Date :
2 / 2021
12/11/2021
Test Report of Harened Concrete Cubes for Reinforced Concrete
To / Shahan Company - Special Request
Contractor Name :
Project Name :
Casting location:
Shahan Company
Shahan Tower
Slab (Level +21.64)
Page Number
2 of 2
Lab. Number
Casting date
Receiving date
Testing Date for 7 Days
Testing date for 28 Days
Req. Strength
(N/mm²)
2 / 2021
13 November 2021
14 November 2021
20 November 2021
11 December 2021
55.0
Group No.
1
Spec. No.
Age (Days)
Length (mm)
Width mm
Height (mm)
Mass (kg)
Density
(kg/m³)
Cross-Sec.
Area (mm²)
Max. Load
(KN)
Comp. Strength
(N/mm²)
Min Strength
(N/mm²)
1
2
3
28
150
150
150
150
150
150
150
150
150
8.540
8.248
8.180
2530
2444
2424
22500
22500
22500
985.1
1177.4
1172.3
43.78
52.33
52.10
49.40
52.0
28
150
150
150
150
150
150
149.5
150
150
8.466
8.462
8.440
2517
2507
2501
22500
22500
22500
70.96
65.42
67.52
67.97
52.0
28
150
150
150
150
150
150
150
150
150
8.484
8.416
8.554
2514
2494
2535
22500
22500
22500
71.11
70.14
63.80
68.35
52.0
28
150
150
150
150
150
150
150
150
150
8.362
8.380
8.330
2478
2483
2468
22500
22500
22500
64.00
65.03
54.62
61.22
52.0
28
150
150
150
150
149.5
149.5
150
149.5
149.5
8.342
8.362
8.368
2472
2494
2496
22500
22425
22425
73.27
73.28
71.03
72.53
52.0
28
150
150
150
150
150
150
150
150
150
8.370
8.360
8.416
2480
2477
2494
22500
22500
22500
71.07
71.10
71.88
71.35
52.0
28
150
150
150
150
150
149
150
150
149
8.276
8.344
8.282
2452
2472
2487
22500
22500
22350
71.06
64.98
66.31
67.45
52.0
28
150
150
150
149.5
149
150
149
149
149.5
8.460
8.414
8.424
2532
2527
2504
22425
22350
22500
70.17
71.00
71.05
70.74
52.0
28
150
150
150
150
150
149.5
149.5
149.5
149
8.360
8.320
8.334
2485
2473
2494
22500
22500
22425
70.51
67.77
66.82
68.37
52.0
28
150
150
150
150
150
150
149.5
150
149
149
149
149
8.368
8.404
8.364
8.394
2496
2507
2503
2504
22500
22500
22425
22500
Average Strength N/mm²
63.07
63.15
62.02
69.92
64.54
52.0
Total Average Groups Strength N/mm²
66.59
58.0
Average Strength N/mm²
2
1
2
3
1596.6
1472.0
1519.2
Average Strength N/mm²
B
3
1
2
3
1600.0
1578.2
1435.5
Average Strength N/mm²
4
1
2
3
1440.0
1463.2
1229.0
Average Strength N/mm²
5
1
2
3
1648.6
1643.3
1592.8
Average Strength N/mm²
1
1
2
3
1599.1
1599.8
1617.3
Average Strength N/mm²
2
1
2
3
1598.9
1462.1
1482.0
Average Strength N/mm²
C
3
1
2
3
1573.6
1586.9
1598.6
Average Strength N/mm²
4
1
2
3
1586.5
1524.8
1498.4
Average Strength N/mm²
5
Reasults:
1
2
3
4
Conformed to the required strength ( ‫) مطابق‬
1419.1
1420.9
1390.8
1573.2