Simhadri NTPC R&R Colony, Darlipali NTPC Bhadla NTPC Kudgi NTPC Welcomes You Follow us on: /ntpc1 /ntpcltd1 NTPC Koldam /ntpclimited NTPC Kayamkulam /Company/ntpc NTPC Rojmal /ntpclimited BOTTOM ASH DEASHING Presented By Raghu, Satish, Ramesh Diploma Trainees 2 Bottom Ash Deashing What is Bottom Ash? Solid Mineral Residue (Ash) Collected at Bottom of the Furnace that results from burning of coal in Boiler Indian coal contains 40% of ash content, out of which 20% is Bottom Ash, 80% is Fly Ash. Typical Ash Composition : SiO2, Al2O3, Fe2O3, CaO , MgO etc. “Ash is Necessary Evil” A typical 2000MW Power Station produces 9000 – 12000 tons Bottom Ash per day Frequency of Deashing - every 3 hrs at 500MW, 5 hrs at 275MW 3 Ash Volume Bottom Ash Fly Ash 4 Bottom Ash Hopper Arrangement 5 Bottom Ash Deashing Scheme Bottom Ash Hopper Ash Slurry Sump B1 B2 A1 A2 Slurry Pumps BAHP Water Ash Water Sump Ash Dyke 6 BAHP Scheme Our BAHP line arrangement consists of a Main Isolating valve (which we always keep open in normal condition) and individual clinker grinder jet pump valves will be opened during Deashing time and close after Flushing complete. 7 To Ash Slurry Sump To Ash Slurry Sump Bottom Ash Deashing Procedure BAHP I/S BAHP STANDBY 8 Bottom Ash Handling System - Parts Bottom Ash Hopper Seal Trough Feed Gates Clinker Grinders Ejectors/Jetpumps Bottom Ash Overflow Tank Hopper, Seal Trough Filling Lines 9 Bottom Ash Handling System 10 Check 10.5m peepholes • Check Ash Buildup • Observe Sound 11 Check Overflow Lines Chokage Overflow Lines Overflow Tank Overflow Tank Level Check Auto Start of Overflow Pumps Inform AHP Control Room Obtain Clearance for Bottom Ash Deashing 14 Check Seal Trough, Refractory Cooling Water Seal Trough Filling Water Valve Ensure Seal Trough is Overflowing Refractory Cooling Sources of Refractory, Seal Trough Water: Water Valve 1. BAHP Header 2. Fire Water Open Discharge Gate Discharge Gate BAHP Lineup At a time only two jet pumps are charged Ensure Flushing is Completed in Previous Deashing Lines 17 Charge BAHP water to Jetpump BAHP Line Vents Pressure Gauge Jet Valve BAHP Main Isolating Valve Observe BAHP Header Pressure 8 Charge Grinder Seal Water Sources of Seal Water: 1. BAHP Header 2. Fire Water Seal Water Pressure Gauge Seal Water Valve Start Clinker Grinder Motor, Observe any abnormality Fluid Coupling Clinker Grinder Motor Clinker Grinder Clinker Grinder Chain Open Feed Gate Feed gate Open Indication After Taking Clearance from AHP Control Room, Feed gate has to be opened Check Chamber Vent 23 Local Operation Panel CG Current Overflow Tank Level Discharge Gate Operation Feed Gate Operation Check Discharge By touching the Discharge Pipe Also by checking at Ash Slurry Sump end Check Bottom Ash Hopper Level Observe W Portion Split Hopper Flushing Individual Flushing Water Valve BAHP Flushing Water Valve (Main) Ensure Empty of Hopper Ensure Grinder Chamber is Empty Close Feedgate after that Hopper Filling BALP Filling Valve Firewater Filling Valve LHS Firewater Filling Valve RHS Discharge Pipe Flushing Atleast 15minutes Line flushing should be done after Bottom Ash Deashing 31 Special Cases Grinder Jam Grinder Not Discharging Back Flushing Procedure To Ash Slurry Sump 4 8 Discharge Gate Feed Gate 33 Migratory Birds at NTPC Dadri Thank You NTPC Ramagundam Website: www.ntpc.co.in | Email: info@yoursite.com Follow us on: /ntpc1 /ntpcltd1 /ntpclimited /Company/ntpc /ntpclimited