BUILDTEK SOLUTIONS AEI ISDC Jon Kishaba Construction Manager, Project Manager C O N S T R U C T I O N | Project Delivery C O N S T R U C T I O N | Site Logistics and Safety C O N S T R U C T I O N | Risk Matrix C O N S T R U C T I O N | Schematic Design Schedule Design Phase Building Permits Submittals Sitework Caissons C O N S T R U C T I O N | Schematic Design Schedule Structural System Enclosure Interior Construction C O N S T R U C T I O N | Schematic Design Schedule Interior Systems Interior Finishes C O N S T R U C T I O N | Estimate - L1 C O N S T R U C T I O N | Core and Shell Detailed Estimate - L2 Core and Shell - $18,800,000 (47%) C O N S T R U C T I O N | Substructure - L2 Substructure- 3% Caissons - $496,000 Slab on Void - $735,00 3 C O N S T R U C T I O N | Superstructure - L2 Superstructure = 15% Steel Beams - $1,450,000 Steel Columns - $2,105,231 Wood Deck - $2,537,826 C O N S T R U C T I O N | Exterior Enclosure - L2 Superstructure - 30% Curtain Wall - $5,500,000 Brick Cladding - $325,513 Metal Panels - $191,000 Plaster - $111,000 C O N S T R U C T I O N | Roof - L2 Roof - 1.5% Built-up Roof - $700,000 C O N S T R U C T I O N | Estimate - L2 Interior Construction and Systems- 25% - $10,000,000 C O N S T R U C T I O N | Schematic Design Estimate Totals - L2 C O N S T R U C T I O N | Specialty Items - L3 ■ Green Roof - $22,568 ■ Emergency Power System - $7,164,984 ■ Shading Control System - $45,000 C O N S T R U C T I O N | Specialty Items - L3 C O N S T R U C T I O N | Specialty Items - L3 C O N S T R U C T I O N | Specialty Items - L3 Generator Size = 290 kW Battery Capacity = 17362 kWh Power = 383kW C O N S T R U C T I O N | Estimate Totals - L3 C O N S T R U C T I O N | Summary ■ ■ ■ ■ Design Bid Build Construction Delivery Method Site Logistics and Safety Measures Schedule Breakdown Level 1, 2, and 3 Estimate