BUILDTEK
SOLUTIONS
AEI ISDC
Jon Kishaba
Construction Manager, Project Manager
C O N S T R U C T I O N | Project Delivery
C O N S T R U C T I O N | Site Logistics and Safety
C O N S T R U C T I O N | Risk Matrix
C O N S T R U C T I O N | Schematic Design Schedule
Design Phase
Building Permits
Submittals
Sitework
Caissons
C O N S T R U C T I O N | Schematic Design Schedule
Structural
System
Enclosure
Interior
Construction
C O N S T R U C T I O N | Schematic Design Schedule
Interior
Systems
Interior
Finishes
C O N S T R U C T I O N | Estimate - L1
C O N S T R U C T I O N | Core and Shell Detailed Estimate - L2
Core and Shell - $18,800,000 (47%)
C O N S T R U C T I O N | Substructure - L2
Substructure- 3%
Caissons - $496,000
Slab on Void - $735,00
3
C O N S T R U C T I O N | Superstructure - L2
Superstructure = 15%
Steel Beams - $1,450,000
Steel Columns - $2,105,231
Wood Deck - $2,537,826
C O N S T R U C T I O N | Exterior Enclosure - L2
Superstructure - 30%
Curtain Wall - $5,500,000
Brick Cladding - $325,513
Metal Panels - $191,000
Plaster - $111,000
C O N S T R U C T I O N | Roof - L2
Roof - 1.5%
Built-up Roof - $700,000
C O N S T R U C T I O N | Estimate - L2
Interior Construction and Systems- 25%
- $10,000,000
C O N S T R U C T I O N | Schematic Design Estimate Totals - L2
C O N S T R U C T I O N | Specialty Items - L3
■ Green Roof - $22,568
■ Emergency Power System - $7,164,984
■ Shading Control System - $45,000
C O N S T R U C T I O N | Specialty Items - L3
C O N S T R U C T I O N | Specialty Items - L3
C O N S T R U C T I O N | Specialty Items - L3
Generator
Size = 290 kW
Battery
Capacity = 17362 kWh
Power = 383kW
C O N S T R U C T I O N | Estimate Totals - L3
C O N S T R U C T I O N | Summary
■
■
■
■