CURVE N A= 28°2 o-02 (R) 3' R= 350 11" M TL= 88 . (5°) .519 M. CL= 17 3.40 TRs = 10 3 M. 0 Speed= M. 13 Shift=11 0 KMPH 90MM. Temple 327/02 327/03 28 27 TN. TS NEX UDA H MA F1 529 F1 529 41 R4 30 CURVE N A= 02°1 o-02B (L) 0' R= 2500 06" M. (0.7 TL= 47 °) .311 M. CL= 94 .611 TRs = 80 M. Speed= M. 13 Shift=10 0 KMPH 7MM. 5.690 327/07 33 32 34 C/L Of South Block PROJECT Ch.: 2147 .00 Km.: 327.498 SRJ 2100 8.294M. TPCC-2, CH: 200 8.29 4 M. 9.185 M. TPCC-1, CH: 197 30.310 .109M. 9.185 M. TPTC-2, CH: 1869 0.000M. NO: 2, TPTC-2, Ch: 1514.169 M. BR. No. 2, SPAN (2 X 6.10M.), RC TO BE EXTEN C Slab, KM: 327 DED AS SPAN /2-3, (2 X 6.415M.), RCC BOX AT 5.958M. 0.000M. .109M. TPCC-2, CH: 1809 TPTC-2, CH: 206 AT-2 327/09 2200 327/05 327/08 35 36 Cabin 327/10 2300 SRJ 31 .402M. 327/06 TPTC-2, CH: 2081 31.870 TPTC-1, CH: 172 TPTC-1, CH: 191 2000 327/04 1.402M. 6.791M. 29 TPCC-1, CH: 198 PROP. CURVE 31.390 TPTC-2, CH: 152 1500 . 01 M 30.3 h: 13 ,C CC-1 -2, Ch: 1414.169 M. PROP. CURVE NO: 2, TPCC P ,T O: 2 TPCC-2, CH: 1425.958M. 32.960 1400 2.090 M. VE N CUR 70 : 134 -1, CH 31.970 TPCC-1, CH: 178 1800 1900 59.7 P. PRO TPCC 42 1600 1700 Shop TPCC-2, CH: 200 S.E. Rly. Land Boundary 6.791M. TPTC-2, CH: 1852 TPTC-1, CH: 190 CURVE N A= 03°4 o-02A (R) 4' R= 1750 54" M. (1°) TL= 57 .264 M. CL= 11 4.48 TRs = 80 6 M. Speed= M. 13 Shift=15 0 KMPH 2MM. .395M. TPCC-2, CH: 1772 .395M. 30.030 TPCC-1, CH: 1737 T/C-5.900M . 327/01 .909M. TPTC-1, CH: 165 7.909M. : 1548.741 M. : 2, TPTC-2, CH EX. CURVE NO 3.704M. 6.620 1438.741 M. 326/26 37 TO BKSC . 77 15 326/25 FL=184.940M . CH:1980M. CURVE DEGR NO-02 EE KM=326 OF CURVE=5 ° C.L=330 /17-26 M TR. LE . N SE=140 GTH=110 M . MM TPTC-2, CH: 150 EX. CURVE NO: 2, TPCC-2, CH: TPCC-2, CH: 1403.704M. 30.940 0 130 326/24 M. 184 .76 CH:8 0M. 00M . FL= FL=184.884M . CH:1980M. CH: 1712.408 2(R) T/C-5.900M R FL=185.254M . CH:1500M. : NO URVE EX. C 70 M. . .048 1329 : 1330.301M H , CH: CC-1 TPCC-1, C P T , 2 60.2 /18 326 326/23 E No.0 T/C-5.900M . E 9 E No.0 2(R) . O /1 326 22 326/ 9.536M. EN 21 326/ '58.31 R= 35 " 0 TL= 9 M. (5.000°) 4.1 CL= 1 08 M. 83 TRs = .868 M. 1 Ca= 1 00 M. 40 Cd= 7 MM. 5 Speed MM. = Shift= 70 KMPH 1190M M. T/C-5.900M. URV X. C : 12 , CH C-1 TPT . 49 M 9 52 T/C-5.900M LE /20 CURV . TO T /17 326 D= 30°05 T/C-13.377M 326 M. . .048 01M 219 30.3 H: 1 : 12 C H , C 1 C-1, T C T P T TP : 2, 0 . 00M -5.9 120 T/C , 88.4 : 11 7-18 26/1 T CH M: 3 BOX A K , e C e Pip , RC Hum .20M.) 1 M.), 1.20 AN (1 X X (1 S SP A PAN 1, S NDED . E No. 01 M BR. E EXT 30.3 B : 12 TO , Ch 1 TC , TP O: 2 EN URV C . P M. PRO .090 '58 R= 35 0 M. (5 .31" .000°) TL= 9 4.1 CL= 1 08 M. 83.868 TRs = M. 1 Ca= 1 00 M. 40 Cd= 7 MM. 5 Speed MM. = Shift=1 70 KMPH 190MM . NW FL=185.172M . CH:1540M. N D= 30°05 E 0 CURV SE S 61 796 529 SW F R1 F1 W 96 NE R 17 F1 R 441 REVER S A= 02°0 E CURVE 2' R= 2500 32" M. (0.70° TL= 44 ) .559 M. CL= 89 .109 TRs = 60 M. Speed= M. 13 Shift=60 0 KMPH MM.