Farming for Resilience Project (F4R)
PN: 2019.2324.2-001.00
Date: 16.02.2022
a) Work Package A: Development of Curriculum, Technical Content and Training
Materials for Training-of-Trainers (ToT) on Sustainable Vegetable and Fruit
Production (total max. 14 days)

Task A-1: Development of Curricula and Content for Horticulture Training-ofTrainers (ToT) (10 days)
 Deliverable A-1: Training Materials for the Horticulture Training-of
Trainers (ToT), including list of proposed technical experts to support
the roll-out of the ToT on specific topics
Date of Completion: 31st March 2022 (first version)
31st August 2022 (final version)

Task A-2: Design a Monitoring and Evaluation (M&E) System for the ToT
(max. 2 days)
 Deliverable A-2: M&E System, including data collection tools
Date of Completion: 30th April 2022

Task A-3: Road Map for the Roll-out of ToT (max. 2 days)
 Deliverable A-3: Road Map for Roll-out of ToT
Date of Completion: 15th March 2022
b) Work Package B: Roll-Out of Horticulture Training-of-Trainers (total max. 48 days
between June 2022 and February 2023)

Task B-1: Roll-Out of Horticulture Training-of-Trainers (max. 24 days)
 Deliverable B-1: Mission Reports (max. 3-4 pages), including training
programme, location details, images and attendance registers
Date of Completion: Within one (1) week after each field mission

Task B-2: Quality assurance and back-stopping of technical trainings (max.
12 days between August 2022 to March 2023)
 Deliverable B-2: Mission Reports (max. 3-4 pages), analysis of trainer
performance, location details, images and attendance registers
Date of Completion: Within one (1) week after each field mission

Task B-3: Support to MAWLR in the implementation of the National
Horticulture Support Programme (NHSP) (max. 12 days between June 2022 and
June 2023)
 Deliverable B-3: Mission Reports (max. 3-4 pages), analysis of trainer
performance, location details, images and attendance registers
Date of Completion: Within one (1) week after each field mission
Page 1 of 3
Farming for Resilience Project (F4R)
PN: 2019.2324.2-001.00
Date: 16.02.2022
c) Work Package C: Technical Trainings on Horticulture and Installation of
Gardens/Greenhouses at School and Community Level in Kavango East & West
and Zambezi Region and Up-scaling of Pilot Initiatives (total max. 34 days between
June 2022 and June 2023)

Task C-1: Technical Horticulture Trainings for Schools and Community
Gardens (max. 24 days)
 Deliverable C-1: Mission Reports (max. 3-4 pages), including training
contents, location details, images and attendance registers
Date of Completion: Within one (1) week after each field mission

Task C-2: Technical Support in the Up-scaling of Pilot Initiatives (max. 10
days)
 Deliverable C-2: Mission Reports (max. 3-4 pages), including training
contents, location details, images and attendance registers
Date of Completion: Within one (1) week after each field mission
d) Work Package D: Support the Development of Training Materials for the Farmer
Business School (FBS) Training Format on Horticulture (total max. 6 days between
February and July 2022)

Task D-1: Development of FBS Training Materials on Horticulture (max. 8
days)
 Deliverable D-1: FBS Training Materials, including training notebook,
workbook and GAP manual
Date of Completion: 31st July 2022
e) Work Package E: Final Report (max. 2 days)

Task E-1: Final Report (2 days)
 Deliverable E-1: Final Report (max. 15 pages)
Date of Completion: 30th June 2023
 Deliverable E-2: Presentation of Results (PowerPoint)
Date of Completion: 30th June 2023
Page 2 of 3
Farming for Resilience Project (F4R)
PN: 2019.2324.2-001.00
Date: 16.02.2022
Supervision, time frame and reporting
. The contract period for the performance of the assignments specified in these ToR shall cover
the period between 11th April 2022 and 30th June 2023 (437 calendar days) in which the
assignments as stipulated above need to be completed utilising one-hundred four (104)
billable consulting days.