Building Survey Terms and Conditions Please Return signed and dated This is an agreement between Samuels Surveyors & Valuers, whose registered office is Bentinck House, Bentinck Road, West Drayton, Middlesex, UB7 7RQ and the clients (as described below) relating to the production of a Building Survey Report. Client information Client name Louise and Ben Dunster Client address 4A The Barons St Margarets TW1 2AN Email: Louise Dunster <louiseldunster@gmail.com> Cost of report £700.00 + VAT Property information to be surveyed Address 2 Norfolk Close St Margarets London Postcode TW1 2AN Tenure Leasehold Date of the survey 7th April 2021 Purchase Price £490,000 The Report. ⮚ Based on an inspection as defined below, the Surveyor, who will be a qualified Surveyor and/or an Registered Valuer, will advise the Client by means of a written Report as to his/her opinion of the visible condition and state of repair of the subject property. ⮚ A Building Survey Report will not include advice on value or a reinstatement cost assessment for insurance purposes unless asked to provide this service. ⮚ Unless specifically instructed, advice will not be given on any proposed works, structural alterations, improvements, etc, although comment with preliminary advice can be given on feasibility, likely costs, etc, upon request. Similarly, previous works carried out on the property will only be commented upon where appropriate to the condition of the building, and the presence or otherwise of any guarantees pertaining to same should be ascertained by the Client or legal advisers. ⮚ The Client is strongly recommended to ensure that matters raised via the Report are entirely and satisfactorily resolved prior to proceeding to exchange of contracts for the purchase of the property. ⮚ The report will conclude with a summary of the surveyors findings. These will include Serious Defects, Essential Repairs, Other Repairs and Further Investigation. Comments in the summary are listed for convenience and are covered in more detail in the body of the report. The summary must therefore be read in conjunction with the full comments in the report. ⮚ Serious Defects are those that threaten the stability of the structure or the safety of those using the property. These might include subsidence, severe bowing or cracking of brickwork or serious and extensive rot to structural timbers. ⮚ Essential Repairs are those that require attention within six months to prevent the defect becoming a Serious Defect. These might include beetle infestation to timbers, major defects to roof coverings and blocked or damaged rainwater goods. ⮚ Other Repairs are those required at some stage to put the property into good condition for its age and type. ⮚ Further Investigation is recommended where the surveyor suspects the presence of a Serious Defect or Essential Repair but is unable at the initial survey stage to confirm this or the extent of the defect. This could include defective drains, damp and timber decay or inadequate alterations to the structure. ⮚ Budget Costs may be included in the report but are based on information available to the surveyor from similar repairs in the past. They are indicative only and we recommend that competitive quotations are obtained prior to committing to expenditure. We could, if instructed, assist with this. ⮚ We are not qualified to report on the condition of services or sports and leisure facilities. We will draw attention to any obvious defects or matters that give us cause for concern but we recommend that specialist tests are undertaken by suitably qualified contractors Inspection Accessibility and Voids: The Surveyor will inspect as much of the surface area of the structure as is practicable but will not inspect those areas which are covered, unexposed or not reasonably accessible, i.e. cavity wall ties and insulation, fireplace flues, etc will not be inspected. Floors The Surveyor may lift accessible sample loose floorboards and trap doors, if any, which are not covered by heavy furniture, ply or hardboard, fitted carpets or other fixed floor coverings. The Surveyor will not, however, attempt to raise fixed floorboards where there may be a risk of damage, and/or without permission. Dampness and Timber Decay and Infestation Where accessible for inspection, walls, partitions and solid ground floor structures will be tested for the presence or otherwise of rising dampness and/or penetrating dampness using an electronic moisture meter fitted with standard probes. Physical signs of timber infestation, insect attack and/or decay will be noted and, if felt necessary, an inspection and report by a specialist will be advised. Roof The Surveyor will inspect the roof spaces if there are available hatches. The Surveyor will have a ladder of sufficient height to gain access to a roof hatch or to a single storey roof, not more than 3.0m (10'0") above the floor or adjacent ground. It might therefore not be possible to inspect roofs above this level; in such cases, otherwise visible pitched roofs will be inspected by binoculars. The Surveyor will follow the guidance given in Surveying Safely issued by the Royal Institution of Chartered Surveyors in April 1991, which incorporates the advice given in Guidance Note GS31 on the safe use of ladders and step ladders issued by the Health and Safety Executive. Boundaries, Grounds and Outbuildings: The surveyor inspects the condition of boundary walls, fences, and areas in common (shared) use. To inspect these areas, the surveyor walks around the grounds and any neighbouring public property where access can be obtained. Where there are restrictions to access (e.g. creeper plant, these are reported), and advice is given on any potential underlying risks that may require further investigation. Buildings with swimming pools and sports facilities are treated as permanent outbuildings and therefore are inspected, but the surveyor does not report on the leisure facilities, such as the pool itself and its equipment internally and externally, landscaping and other facilities (for example, tennis courts and temporary outbuildings) Services: The Surveyor will carry out a visual inspection of the service installations where accessible. Manhole covers will be lifted where accessible and practicable. No tests will be applied unless previously agreed. The Surveyor will report if, as a result of inspection, it is considered that tests are advisable and, if felt necessary, an inspection and report by a specialist should be obtained. Outside The surveyor carefully and thoroughly inspects the outside of the main building and all permanent outbuildings, recording the construction and defects (both major and minor) that are evident. This inspection is intended to cover as much of the external element of the property as physically accessible. The surveyor will use a telescopic camera to inspect as much of the roof structure and chimneys as possible and where this is not possible an explanation is provided in the ‘limitations of inspection’ box in the relevant section of the report. Areas not inspected: The Surveyor will identify any areas which would normally be inspected but which could not be inspected, and indicate where it is considered that access should be obtained or formed and, furthermore, advice will be given on possible or probable defects based on evidence from what has been able to be seen. Flats Unless otherwise agreed, the Surveyor will inspect only the subject flat and garage (if any), the related internal and external common parts and the structure of the building in which the subject flat is situated. Other flats or properties will not be inspected. The Surveyor will state in the Report any restrictions on accessibility to the common parts or visibility of the structure. The Surveyor will state whether a copy of the lease has been seen and, if not, the assumptions as to repairing obligations on which the report is based. The Client is reminded that, particularly in the case of large blocks, the object of the inspection is to give guidance on the general standard of construction and maintenance, pointing out those items which will require attention within the reasonably foreseeable future, and not to list those minor points which would normally be taken care of in the course of routine maintenance. (Many flats form part of large developments consisting of several blocks. In such cases the Surveyor will be inspecting only the block in which the flat is situated). Advice will not generally be given in respect of management arrangements and, where relevant, the Client and legal advisers should ascertain whether there is a management company correctly set up to deal with the running and maintenance of the building, and a suitable maintenance fund exists to deal with routine matters arising together with relevant comments in the Report. It should also be ascertained that suitable arrangements are made for the insurance of the building and that any future developments, major repairs, etc have been budgeted and advised. Deleterious & Hazardous Materials Unless otherwise expressly stated in the Report, the Surveyor will assume that no deleterious or hazardous materials or techniques have been used in the construction of the property. However, the Surveyor will advise in the Report if, in his/her view, there is a likelihood that high alumina cement (HAC) concrete has been used in the construction and that, in such cases, specific enquiries should be made or tests carried out by a specialist. Lead water supply pipes and asbestos will be noted, and advice given, if these materials can be seen but it must be appreciated that such materials are often only visible after opening up which cannot be carried out at the risk of causing damage – See Accessibility and Voids. The Surveyor will advise in the Report if the property is in an area where, based on information published by the National Radiological Protection Board, there is a risk of radon. In such cases the Surveyor will advise that tests should be carried out to establish the radon level. The report will not comment specifically on the presence of asbestos or other hazardous materials as this falls outside the scope of a building survey. However the suspected presence of such materials will be reported if seen to enable further investigations and testing to be undertaken by a specialist if appropriate. The Surveyor will advise if there are transformer stations or overhead power lines which might give rise to an electro-magnetic field, either over the subject property or visible immediately adjacent to the property, but the Surveyor cannot assess any possible effect on health. For obvious reasons, the Surveyor cannot report on any underground cables Contamination The Surveyor will not comment upon the existence of contamination as this can only be established by appropriate specialists. Where, from local knowledge or the inspection, it is considered that contamination might be a problem, advice will be given as to the importance of obtaining a report from an appropriate specialist. Consents, Approvals & Searches The Surveyor will assume that the property is not subject to any unusual or especially onerous restrictions or covenants which apply to the structure or affect the reasonable enjoyment of the property. The Surveyor will assume that all bye-laws, Building Regulations and other consents required have been obtained. In the case of new buildings, and alterations and extensions which require statutory consents or approvals, the Surveyor will not verify whether such consents have been obtained. Any enquiries should be made by the Client or his legal advisers. Drawings and specifications will not be inspected by the Surveyor. The Surveyor will assume that the property is unaffected by any matters which would be revealed by a Local Search and replies to the usual enquiries, or by a Statutory Notice, and that neither the property, its condition, use, or intended use, is or will be unlawful. Fees & Expenses The client will pay the surveyor the agreed fee for the Report and any additional services requested and also agreed disbursements in addition. The cost of invoice for further investigations will normally be based on current hourly rates with a budget price to be agreed prior to investigations being undertaken. Any costs incurred by the surveyor in employing labour, specialist contractors etc. will be charged as disbursements at cost. The invoice is payable prior to the release of the building survey report and any additional reports requested and within 7 working days. If the report remains unpaid for over 7 working days, the surveyor has the right to charge interest on the unpaid account at 3% above the bank of England base rate. Restrictions on Disclosure The Report is for the sole use of the named Client and is confidential to the Client and his/her/their professional advisers. Any other persons rely on the Report at their own risk. Complaints Procedure The surveyor will have a complaints handling procedure and will give you a copy if you ask. The surveyor is required to provide you with contact details, in writing, for their complaints department or the person responsible for dealing with client complaints. Where the surveyor is party to a redress scheme, those details should also be provided. If any of this information is not provided, please notify the surveyor and ask that it be supplied. GDPR Whilst using our service, we may ask you to provide us with certain personal identifiable information that can be used to contact or identify you. Personal identifiable information may include, but not limited to, your email address, name, phone number, postal address and other information (“Personal Information”). In supplying your contact information, you agree that, for the purpose of the Data Protection Act and General Data Protection Regulations, we may keep your contact details and supply them electronically or by other means, to parties directly or indirectly involved in the execution of this contract in accordance with their professional duties.. You hereby authorise us to keep these details for 16 years following the completion of the contract which you entered into for the works to be undertaken. You understand that you have a right of access, rectification, and objection to your information held in our office. Papers, electronic emails, correspondence cannot be deleted as they must be kept the purposes of, and in accordance with the requirements of the Professional Indemnity Insurance and other purposes Declaration I/We confirm that I/we have read and understood the Description of the Homebuyer Service the RICS Home Surveys Information Sheet which are both attached below. I/We confirm that I/we accept Samuels Surveyors & Valuers Standard Terms of Engagement to prepare an RICS Homebuyer Report on the above property which I/we will sign, date and return to Samuels Surveyors & Valuers. prior to commencement of the inspection Signed:..…………………………… ……………...………………………… Dated: ….. ……………. 2021 Print Name ………………16/05/21 Louise Dunster……………………………………… Signed:..…………………………………………...………………………… Dated: ….. ……………. 2021 Print Name ………………………………………………………