DNV Offshore wind seminar

advertisement
Project Certification for Offshore Wind
海上风电项目认证
Dong Chao
28 March 2013
Introduction of DNV Standard
DNV标准介绍
标准介绍
Introduction of Project Certification Procedure
项目认证流程介绍
Offshore Wind Tribune Certification
海上风机型式认证
Consequence of Foundation Verification and
Project Certification
地基审核和项目认证的重要性
Project Certification for Offshore Wind
28 March 2013
Introduction of DNV Standards
DNV标准介绍
Project Certification of Offshore Wind Farm
海上风场项目认证
Project Certification for Offshore Wind
28 March 2013
Design of Offshore Wind Turbine Structures
海上风机结构设计
Introduction of DNV Standards
DNV标准介绍
Standard for Classification of Wind Turbine
Installation Units DNV-OS-J301
Offshore Substations for Wind Farms DNV-OS-J201
Design and Manufacture of Wind Turbine Blades,
Offshore and Onshore Wind Turbine DNV-DS-J102
Project Certification for Offshore Wind
28 March 2013
4
Introduction of DNV Standards
DNV标准介绍
DNV-RP-J101
Use of Remote Sensing for Wind Energy Assessments
风能评估中的远程遥测应用(声达、雷达)
DNV-OS-C101
Design of Offshore Steel Structures, General (LRFD Method)
海上钢结构设计,概况(LRFD方法)
DNV-RP-C203
Fatigue Design of Offshore Steel Structures
海上钢结构疲劳设计
DNV-RP-C204
Design of Against Accidental Loads
意外碰撞载荷设计
DNV-RP-C205
Environmental Conditions and Environmental Loads
环境条件与环境载荷
DNV-OS-B101
Metallic Materials
金属材料
DNV-RP-C401
Fabrication and Testing of Offshore Structures
海上结构的建造与测试
Project Certification for Offshore Wind
28 March 2013
5
Introduction of DNV Standard
DNV标准介绍
标准介绍
Introduction of Project Certification Procedure
项目认证流程介绍
Offshore Wind Tribune Certification
海上风机型式认证
Consequence of Foundation Verification and
Project Certification
地基审核和项目认证的重要性
Project Certification for Offshore Wind
28 March 2013
Introduction of Project Certification Procedure
项目认证流程介绍
项目认证流程介绍
What is the Project Certification?
什么是项目认证
One or more specific wind turbines, including the foundation, seabed, geological,
corrosion, wave, typhoon, collision and plankton
对一台或几台特殊的风机进行分析,包含地基、海床、地质、腐蚀、浪、台风、
碰撞及浮游生物
Evaluated for the specific external conditions
对特殊的极限条件进行评估
At a specific installation site
对特殊的安装场地进行评估
Project Certification for Offshore Wind
28 March 2013
7
Introduction of Project Certification Procedure
项目认证流程介绍
项目认证流程介绍
DNV System
Design Basis
Design
Manufacturing
Installation
Commissioning
Project Certificate
In-service
IEC System
Project Certification for Offshore Wind
28 March 2013
8
Introduction of Project Certification Procedure
项目认证流程介绍
♥ Design Basis: Design Basis Evaluation
设计基础:设计评估
Define design parameters
定义设计参数
Identify applicable standards
确定应用标准
Turbine type
风机类型
Support structure concept
支撑结构概念
Procedure requirements
流程要求
Site conditions
场地条件
Project Certification for Offshore Wind
28 March 2013
9
Introduction of Project Certification Procedure
项目认证流程介绍
♥ Design: Support Structure Design Evaluation
设计:支撑结构设计评估
Project Certification for Offshore Wind
28 March 2013
10
Introduction of Project Certification Procedure
项目认证流程介绍
♥ Manufacturing Verification
制造审核
Project Certification for Offshore Wind
28 March 2013
11
Introduction of Project Certification Procedure
项目认证流程介绍
♥ Transportation and Installation
Surveillance
运输与安装审查
Transportation & Install.
Surveillance
Project Certification for Offshore Wind
28 March 2013
12
Introduction of Project Certification Procedure
项目认证流程介绍
Design Basis
Design
Manufacturing
Installation
Commissioning
Project Certificate
♥ Commissioning Surveillance
试运行审查
Inservice
Project Certification for Offshore Wind
28 March 2013
13
Introduction of Project Certification Procedure
项目认证流程介绍
Design Basis
Design
Manufacturing
Installation
Commissioning
Project Certificate
Inservice
Project Certification for Offshore Wind
28 March 2013
14
Introduction of Project Certification Procedure
项目认证流程介绍
Design Basis
♥ Operation and Maintenance Surveillance
运营和维护审查
Design
Manufacturing
Installation
Commissioning
Project Certificate
Inservice
Project Certification for Offshore Wind
28 March 2013
15
Introduction of DNV Standard
DNV标准介绍
标准介绍
Introduction of Project Certification Procedure
项目认证流程介绍
Offshore Wind Tribune Certification
海上风机型式认证
Consequence of Foundation Verification and
Project Certification
地基审核和项目认证的重要性
Project Certification for Offshore Wind
28 March 2013
Offshore Wind Tribune Certification
海上风机型式认证
海上风机型式认证
Why do we care about certification?
为什么关注认证
Project certificate requirement 项目认证必要条件之一
Client requirements 客户要求
To identify quality and also reduce risk as well later cost
(including repair and maintenance)
认证可以确保质量,降低风险和成本
Bank or Financing requirements
银行或融资的要求
Capture more confidence and investment
认证可以获得更多信任和投资
Insurance company requirement
保险公司的要求
Reduce economic loss, downtime and risk causing
认证可以减少经济损失、停机时间以及风险的发生
Government or policy requirements
政府或政策要求
Offshore wind turbine used must be certified in Europe
Regional or National mandatory requirement
在欧洲,
在欧洲,所有海上风机必须经过认证
当地或国际的强制要求
Project Certification for Offshore Wind
28 March 2013
Using Offshore Wind Turbine Certification Status
海上风电机组认证现状 (部分)
Project Certification for Offshore Wind
28 March 2013
Type Certification Governing Standards
型式认证主要适用标准
IEC
DNV
GL Guideline
DIBt
Project Certification for Offshore Wind
28 March 2013
Type Certification Standard – IEC 61400-22
型式认证标准–
式认证标准– IEC 6140061400-22
Project Certification for Offshore Wind
28 March 2013
Design Basis Evaluation
设计基础评估
Design Basis Evaluation
Design Evaluation
Foundation Design
Evaluation
Manufacturing Evaluation
Foundation Manufacturing
Evaluation
Type Testing
Type Characteristics
Measurements
Mandatory
Final Evaluation
Optional
Type Certificate
Identification of: Requirements, Assumptions, Methodologies
验证:要求、假设及方法
Project Certification for Offshore Wind
28 March 2013
Design Evaluation
设计评估
Design Basis Evaluation
Design Evaluation
Foundation Design
Evaluation
Manufacturing Evaluation
Foundation Manufacturing
Evaluation
Type Testing
Type Characteristics
Measurements
Mandatory
Final Evaluation
Optional
Type Certificate
Review documents
技术文件审核
Perform independent analyses
独立分析和计算
Project Certification for Offshore Wind
28 March 2013
Loads and Load Cases
载荷和载荷工况
Project Certification for Offshore Wind
28 March 2013
Components Evaluation
部件评估
部件评估
Design Control
Evaluation of component
tests
Control and Protection
System
Foundation Design
Requirements
Loads and Load Cases
Manufacturing Process
Rotor Blades
Transportation Process
Machine and Structural
Components
Installation Process
Electrical Components
Maintenance Process
Housings
Personnel Safety
Design Evaluation
Conformity Statement
Project Certification for Offshore Wind
28 March 2013
Foundation Design Requirements
地基设计要求
Project Certification for Offshore Wind
28 March 2013
Manufacturing Evaluation
生产审核
Design Basis Evaluation
Design Evaluation
Foundation Design
Evaluation
Manufacturing Evaluation
Foundation Manufacturing
Evaluation
Type Testing
Type Characteristics
Measurements
Mandatory
Final Evaluation
Optional
Type Certificate
Ensures requirements from Design Evaluation are
implemented in production and assembly
确保设计要求在生产和装配中的执行情况
At least one of everything is inspected
所有生产工序至少要保证检查一项
Project Certification for Offshore Wind
28 March 2013
Type Testing
型式测试
型式测试
Design Basis Evaluation
Design Evaluation
Foundation Design
Evaluation
Manufacturing Evaluation
Foundation Manufacturing
Evaluation
Type Testing
Type Characteristics
Measurements
Mandatory
Final Evaluation
Optional
Type Certificate
Review test reports
审核测试报告
Participate in Safety & Function Tests
参与安全和功能性测试
Inspect personnel safety features in installed
test turbine
对已安装风机的人员安全设备进行审核
Project Certification for Offshore Wind
28 March 2013
Final Evaluation
最终审核
Final Evaluation
Project Certification for Offshore Wind
28 March 2013
Final
Evaluation
Report
Foundation Design and Manufacturing Evaluation (optional)
地基设计和制造审核(
地基设计和制造审核(可选)
可选)
Design Basis Evaluation
Design Evaluation
Foundation Design
Evaluation
Manufacturing Evaluation
Foundation Manufacturing
Evaluation
Type Testing
Type Characteristics
Measurements
Mandatory
Final Evaluation
Optional
Type Certificate
Offshore wind project will pay more
attention to foundation of wind turbine.
海上风电项目会对风机的基础给予 更多
的重视。
的重视
。
Project Certification for Offshore Wind
28 March 2013
Type Characteristics Measurements (optional)
型式特性测试(
式特性测试(可选)
可选)
Design Basis Evaluation
Design Evaluation
Foundation Design
Evaluation
Manufacturing Evaluation
Foundation Manufacturing
Evaluation
Power Quality
Measurements
Low Voltage Ride Through
Measurement
Type Testing
Type Characteristics
Measurements
Mandatory
Final Evaluation
Optional
Acoustic Noise
Measurements
Type Certificate
Type Characteristics
Measurements Conformity
Statement
Project Certification for Offshore Wind
28 March 2013
Type Certificates and Other Certificates
型式认证证书和其他证书
Certificate
证书
Description
类型
Validation period
有效期
-
Type
5 years
Class C
Prototype
3 years
Class B
Provisional
1 year
-
Component Prototype
3 years
-
Component Provisional
1 year
Certificate =
Project Certification for Offshore Wind
28 March 2013
Introduction of DNV Standard
DNV标准介绍
标准介绍
Introduction of Project Certification Procedure
项目认证流程介绍
Offshore Wind Tribune Certification
海上风机型式认证
Consequence of Foundation Verification and
Project Certification
地基审核和项目认证的重要性
Project Certification for Offshore Wind
28 March 2013
Offshore Wind Foundations - Overview
Project Certification for Offshore Wind
28 March 2013
33
Consequence of Foundation Design Verification
地基设计审核的重要性
地基设计审核的重要性
Foundation Cost Distribution in Offshore Wind Project
地址在海上风电项目中所占比重
▲ The substructure of a turbine is one of the largest single
cost factors of the overall project
风机地基是整个项目最大的成本之一
▲ Reducing the cost of construction, transportation and
installation of these foundations will have a big impact on
supply chain optimization.
降低地基建造、运输和安装的成本将会对供应链的优化启
到很大作用。
Project Certification for Offshore Wind
28 March 2013
34
Consequence of Foundation Design Verification
地基设计审核的重要性
▲ The design of specific offshore foundations, with reduced manufacturing costs is
essential to ease this link in the supply chain.
对于特殊条件下的海上地基设计,降低制造成本对整个供应链至关重要。
▲ Breaking wave influence (spilling, plunging)
破坏性波浪影响(溅射破碎波、卷跃破碎波)
Project Certification for Offshore Wind
28 March 2013
35
Consequence of Foundation Design Verification
地基设计审核的重要性
▲ Rationality of foundation design will directly impact to
risk of whole project.
地基设计的合理性将直接影响整个项目的风险。
▲ For foundation, there is a lot of special elements need
to be considered, for instance wave, geotechnical,
corrosion and collision.
对于地基,有许多的特殊因素需要考虑。例如波浪、地
勘、腐蚀及碰撞等的影响。
Project Certification for Offshore Wind
28 March 2013
36
Consequence of Foundation Transportation Verification
地基设计审核的重要性
Transportation: Monopiles, tripods and
braced frames are usually transported to the
site on barges. In some cases, for the larger
diameter monopiles, the ends are capped and
sealed and they are floated to the site.
运输:
运输:单桩、三桩及支撑结构通常用驳船运送到
现场。有时候,对于大直径的单桩,底部需要加
盖并密封,然后用浮船运动到现场。
Project Certification for Offshore Wind
28 March 2013
37
Consequence of Foundation Transportation Verification
地基运输
地基运输审核
运输审核的重要性
审核的重要性
Gravity caissons either are floated to the site, and then filled with ballast or
transported by barge. The turbine is usually transported in one piece.
重力式地基,可装满配重,利用浮船进行运输;或者用驳船运输。风机通常是
被单独运输。
Project Certification for Offshore Wind
28 March 2013
38
Consequence of Foundation Installation Verification
地基安装
地基安装审核
安装审核的重要性
审核的重要性
Erection: A jack-up rig serves as a fairly
stable platform for carrying out the
operation of installing the piles, the tower,
nacelle and rotors. However, its inherent
stability brings with it a lack of
maneuverability during installation of the
tower.
施工:自升式平台对于安装桩、塔筒、机舱
和轮毂充当着非常稳定的平台。但他自身的
稳定性在安装塔筒的过程中,也暴露了可操
作性的缺憾。
Project Certification for Offshore Wind
28 March 2013
39
Consequence of Project Certification
项目认证的重要性
项目认证的重要性
Reducing Risk
降低风险
Overall Planning for Project
统筹项目计划
Reasonable Construction Schedule
合理的施工进度
Optimization Design and Procedure
优化设计与流程
Professional Technical Support
专业的技术支持
Project Certification for Offshore Wind
28 March 2013
40
Consequence of Project Certification
项目认证的重要性
Cost Control
Project Delivery Inspection
成本控制
项目交付审核
Quality Assurance
Project Revenue Analysis
质量保证
营收分析
Authoritative 3rd Party Supervision
Policy Understanding
权威的第三方监管
政策解读
Project Certification for Offshore Wind
28 March 2013
41
Thanks for your attention!
Project Certification for Offshore Wind
28 March 2013