ADDENDUM A TO PARTIAL TAKING-OVER CERTIFICATE (PTOC) NAME OF PROJECT : BDIP CONTRACT REFERENCE No. CLIENT: IPDC CONSULTANT: MH CONTRACTOR: CCECC Date:2022.03.16 O&M Manual submittal & Approval List Item 1 of 1 Description of Handed Over Items O&M M App Status Remark 1 FA APP 2 STRUCTURAL CABLING SOLUTION (SCS) INCS please include 3 IP-PBX INCS please include 4 PA APP 5 MATV INCS please include 6 DATA CENTER INCS please include 7 CCTV APP 8 IAS INCS 9 IPDC LAN: Active Device ( Core & Access SW) APP 10 Traffic LTG Controller Station INCS 11 WiFi APP 12 One Card System: VACS, PACS, AC, CM APP 13 WATER SUPPLY PUMP STATTION INCS please include 14 ET OSP :MH INCS please include 15 ET WAN :Pasive Device (HAYT & FO) INCS please include 16 ET WAN : Active Device (RT & CORE SW) APP 17 ET WAN : Active Device (access switch) APP please include please include