2140 Regent St. South, Unit 12A Sudbury, Ontario, Canada, P3E 5S8 705.675.6881 705.675.8330 FIELD REVIEW REPORT FRR ME-11 3rd Line Studio Inc. February 10, 2022 Attention: Vanessa Vachon Re: Marina Point Addition and Renovation – Building ‘C’ North Bay, Ontario Project No. 2015-629046 Date of Visit: January 31, 2022 ANY ITEM OR DEFICIENCY NOT SPECIFICALLY NOTED IN THIS OR ANY OTHER FIELD REVIEW REPORT DOES NOT ALLEVIATE THE CONTRACTOR OF HIS RESPONSIBILITY FROM COMPLYING WITH THE INTENT OF THE DRAWINGS, SPECIFICATIONS OR LOCAL INSPECTION AUTHORITIES. The above site was visited on the date noted, to review the progress of the project and to note any deficiencies. The following are our comments: FIELD REVIEW: 1. The mechanical and electrical work is progressing well.. a. The sanitary and storm drainage is being installed throughout the addition. b. Water piping installation is in progress. Some pipe insulation has begun. c. Duct risers are installed in the shaft and are insulated. Ductwork installation in the Corridors is in progress. d. Sprinkler piping installation is well underway. e. Main electrical equipment is installed in the Electrical Room. f. Suite electrical panel tubs are installed in many locations. Wiring to the panels and within partitions is in progress. DEFICIENCIES: Legend: Item - O = Outstanding C = Completed R = Resolved Deficiency Description None identified during this field review Status C CO-ORDINATION: 1. Interference drawings to be made for co-ordination between mechanical and electrical disciplines. If ceiling heights are not obvious, refer to Architect to provide clear direction. Scaling drawings is not acceptable. 2. Any comments on the permit review set are to be brought to the Consultants attention for comment and revision if necessary. 3. M & E to maintain proper protection and care of work and equipment throughout the project. 4. M & E record drawings to be maintained regularly c/w dimensions from fixed reference points. 5. M & E to maintain regular/required inspections from all authorities having jurisdiction 6. Coordination with other trades shall be maintained. ATTACHMENTS: 1. Construction Progress - 4 photos . Typical mechanical and electrical installations in Corridor on Lower Floors. Typical Suite electrical panel installation and wiring Page 2 of 4 Typical mechanical and electrical installation in Corridor on Lower Floors Typical mechanical and electrical installations on Upper Floors Page 3 of 4 SNC-LAVALIN INC. Buildings Ontario per: Laurier Lalande, Dipl. Arch. Tech. per: Anthony Celestini, C.E.T. P:\2015\2015-629046 Marina Point\Block C Addition\docs\const\Field Reviews and Reports\2015-629046 FRR ME-11 January 31, 2022.docx Page 4 of 4