Production Review Weekly 3 2022 STM – HENGJAYA MINERALINDO REVIEW Weekly III TOTAL MOVEMENT PER MATERIAL IN PIT, PLAN VS ACTUAL (BCM) REVIEW Weekly III TOTAL MOVE ALL MATERIAL, PLAN VS ACTUAL (BCM) REVIEW Weekly III TOTAL MOVE ALL MATERIAL, PLAN VS ACTUAL (BCM) ALL PIT Material OB/Ws Limonite Saprolite Total Mined Week to Plan 24,727 18,754 15,843 59,325 Date (BCM) Act %Acv 31,617 127.9% 13,013 69.4% 12,406 78.3% 57,035 96.1% Plan 83,311 63,186 53,378 199,874 MTD (BCM) Act 101,850 32,044 48,565 182,458 %Acv 122.3% 50.7% 91.0% 91.3% Plan 40,191 18,528 1,243 59,961 MTD (BCM) Act 8,300 806 5,224 14,330 %Acv 20.7% 4.4% 420.4% 23.9% Plan 38,916 33,206 27,815 99,938 MTD (BCM) Act 59,600 11,231 19,535 90,367 %Acv 153.2% 33.8% 70.2% 90.4% MTD (BCM) Act 21,367 20,006 41,373 %Acv 0.0% 0.0% 0.0% 0.0% MTD (BCM) Act 12,583 23,806 36,389 %Acv 299.3% 0.0% 97.9% 91.0% PIT CW-1 Material OB/Ws Limonite Saprolite Total Mined Week to Date (BCM) Plan Act %Acv 11,929 233 2.0% 5,499 0.0% 369 0.0% 17,797 233 1.3% PIT CW-2 Material OB/Ws Limonite Saprolite Total Mined Week to Date (BCM) Plan Act %Acv 11,551 18,133 157.0% 9,856 3,056 31.0% 8,256 5,347 64.8% 29,663 26,537 89.5% PIT CW-3 Material OB/Ws Limonite Saprolite Total Mined Week to Date (BCM) Plan Act %Acv 9,317 0.0% 9,956 0.0% 0.0% 19,273 0.0% Plan PIT BBE Material OB/Ws Limonite Saprolite Total Mined Week to Date (BCM) Plan Act %Acv 1,248 3,933 315.2% 3,399 0.0% 7,218 7,059 97.8% 11,865 10,992 92.6% Plan 4,204 11,452 24,319 39,975 REVIEW Weekly III RAIN HOUR REVIEW Weekly III SLIPPERY TIME Rain (h) Plan 26.00 Slippery (h) Actual 23.32 Plan 9.10 Actual 8.33 Rain + Slippery (h) Plan 35.10 Actual 31.65 Curah Hujan (mm) Actual 149.50 REVIEW Weekly III EFFECTIVE WORKING HOURS PLAN EWH Description Hrs per Day Work Hour/day Day Daily Check Delay Shift Rest Friday Pray Prepare Front & Disposal Others Mechanical Availability/week Rain/day Slippery/day Eff Working Hour 15-Feb-22 24.00 24.00 1.00 0.33 0.50 2.00 0.00 2.40 0.00 1.20 4.00 1.40 12.2 16-Feb-22 24.00 24.00 1.00 0.33 0.50 2.00 0.00 2.40 0.00 1.20 4.00 1.40 12.2 17-Feb-22 24.00 24.00 1.00 0.33 0.50 2.00 0.00 2.40 0.00 1.20 4.00 1.40 12.2 Date 18-Feb-22 24.00 24.00 1.00 0.33 0.50 2.00 1.00 2.40 0.00 1.20 4.00 1.40 11.2 19-Feb-22 24.00 24.00 1.00 0.33 0.50 2.00 0.00 2.40 0.00 1.20 4.00 1.40 12.2 20-Feb-22 24.00 12.00 0.50 0.17 0.25 1.00 0.00 1.20 0.00 0.60 2.00 0.70 6.1 W3 144.00 132.00 5.50 1.84 2.75 11.00 1.00 13.20 6.60 22.00 7.70 65.91 ACTUAL EWH Date Description W3 15-Feb-22 16-Feb-22 17-Feb-22 18-Feb-22 19-Feb-22 20-Feb-22 Hrs per Day 24 24 24 24 24 24 144.00 Work Hour/day 24 24 24 24 24 12 132.00 1 1 0 1 1 1 4.50 Daily Check 0.45 0.43 0.44 0.19 0.62 0.18 2.31 Delay Shift 1.03 0.77 0.87 0.50 0.66 0.39 4.22 Day Rest 1.0 2.0 1.0 2.0 2.0 1.0 9.00 Friday Pray Prepare Front & Disposal Others Mechanical Availability/week Rain/day Slippery/day Eff Working Hour 0.00 0.00 0.00 1.00 0.00 0.00 1.91 0.28 0.00 4.52 1.49 13.3 3.31 0.27 0.00 4.25 1.67 11.3 1.09 0.41 0.00 8.28 2.67 9.2 1.00 0.15 1.07 5.27 2.00 10.8 2.26 0.10 1.63 1.00 0.50 15.2 1.42 0.13 1.00 0.00 0.00 7.9 1.00 10.99 1.33 3.70 23.32 8.33 67.80 REVIEW Weekly III EFFECTIVE WORKING HOURS Description Hrs per Day Work Hour/day Day Daily Check Delay Shift Rest Friday Pray Prepare Front & Disposal Mechanical Availability/week Others Rain/day Slippery/day Eff Working Hour Others : refueling & greassing W3 Plan 144.00 132.00 5.50 1.84 2.75 11.00 1.00 13.20 6.60 0.00 22.00 7.70 65.91 Actual 144.00 132.00 4.50 2.31 4.22 9.00 1.00 10.99 3.70 1.33 23.32 8.33 67.80 % 100% 100% 82% 126% 154% 82% 100% 83% 56% 0% 106% 108% 103% REVIEW Weekly III ORE HAULING Material Sap Ore Week to Date (WMT) Plan Act %Acv 26,394 26,269 99.5% Plan 88,927 MTD (WMT) Act 57,321 %Acv 64.5% REVIEW Weekly III ORE BARGING Material Sap Ore Week to Date (WMT) Plan Act %Acv 25,867 43,057 166.5% MTD (WMT) Plan Act 87,148 120,939 %Acv 138.8% Remarks Waiting Cargo Waiting Barge Setting Rampdoor Rain Daily Inspection Unit Friday Pray Rest Total Loss Time Total (hours) 0.00 0.00 11.63 13.25 2.33 1.92 7.50 36.63 % 0% 0% 32% 36% 6% 5% 20% 100% REVIEW Weekly III STRIPPING RATIO ALL PIT SR (bcm/wmt) MATERIAL YTD 2020 Overburden 429,231 Limonite 542,547 OB + Lim 971,778 Saprolite 561,441 SR 1.73 YTD 2021 1,729,917 1,134,481 2,864,398 1,419,415 2.02 Jan-22 195,353 68,072 263,425 155,952 1.69 YTD 297,203 100,116 397,319 238,512 1.67 PTD 2,456,351 1,777,144 4,233,495 2,219,369 1.91 SR PIT ALL PTD bcm/wmt 4,233,495 SR (wmt/wmt) MATERIAL YTD 2020 Overburden 772,615 Limonite 868,075 OB + Lim 1,640,691 Saprolite 561,441 SR 2.92 YTD 2021 3,113,851 1,815,170 4,929,021 1,419,415 3.47 Jan-22 351,635 108,916 460,551 155,952 2.95 YTD 534,965 160,186 695,151 238,512 2.91 PTD 4,421,431 2,843,431 7,264,862 2,219,369 3.27 2,219,369 SR (bcm/wmt) Plan Act 2.00 1.91 REVIEW Weekly III STRIPPING RATIO PIT CW SR (bcm/wmt) MATERIAL YTD 2021 Overburden 1,201,873 Limonite 479,460 OB + Lim 1,681,332 Saprolite 745,962 SR 2.25 Jan-22 159,654 68,072 227,727 84,940 2.68 Feb-22 8,300 806 9,106 8,880 1.03 YTD 167,954 68,879 236,833 93,820 2.52 PTD 1,369,827 548,338 1,918,165 839,782 2.28 SR PIT CW PTD bcm/wmt 1,918,165 SR (wmt/wmt) MATERIAL Overburden Limonite OB + Lim Saprolite SR YTD 2021 2,163,371 767,135 2,930,506 745,962 3.928 Jan-22 287,378 108,916 396,293 84,940 4.67 Feb-22 14,940 1,290 16,230 8,880 1.83 YTD 302,318 110,206 412,523 93,820 4.40 PTD 2,465,688 877,341 3,343,030 839,782 3.98 839,782 SR (bcm/wmt) Plan Act 2.00 2.28 REVIEW Weekly III STRIPPING RATIO PIT CW-2 SR (bcm/wmt) MATERIAL Overburden Limonite OB + Lim Saprolite SR Feb-22 59,600 11,231 70,831 33,210 2.13 SR PIT CW-02 PTD bcm/wmt 70,831 33,210 SR (wmt/wmt) MATERIAL Overburden Limonite OB + Lim Saprolite SR Feb-22 107,280 17,970 125,250 33,210 3.77 SR (bcm/wmt) Plan 2.00 Act 2.13 REVIEW Weekly III STRIPPING RATIO PIT BBE SR (bcm/wmt) MATERIAL YTD 2021 Overburden 308,372 Limonite 8,484 OB + Lim 316,855 Saprolite 254,160 SR 1.25 Jan-22 35,699 35,699 72,750 0.49 Feb-22 12,583 12,583 40,470 0.31 YTD 48,282 48,282 113,220 0.43 PTD 356,654 8,484 365,137 367,380 0.99 SR (wmt/wmt) MATERIAL YTD 2021 Overburden 555,069 Limonite 13,574 OB + Lim 568,643 Saprolite 254,160 SR 2.24 Jan-22 64,257 64,257 72,750 0.88 Feb-22 22,650 22,650 40,470 0.56 YTD 86,907 86,907 113,220 0.77 PTD 641,977 13,574 655,551 367,380 1.78 SR PIT BBE PTD bcm/wmt 365,137 367,380 SR (bcm/wmt) Plan Act 0.87 0.99 REVIEW Weekly III PRODUCTIVITY UNIT EXCA TMM PIT TO DISPOSAL AND ETO The productivity under targer because waiting prepare front & disposal, Front not wide REVIEW Weekly III PRODUCTIVITY UNIT EXCA TMM PIT TO DISPOSAL AND ETO Ore hauling can’t maximize due to waiting Slipepry hauling road, maintenance loading point and dumping point Review Weekly III Model Compliance CW1 PIT CW Ore Type LGSO MGSO HGSO Total SSO ETO CAMP STM ETO POS 2 ETO Total Material Type OB/WST LGL HGL Total Actual Mining Rec. Dilution Grade Ni Dilution Grade Fe Survey Factor Weighbridge Ton Ni (%) Fe (%) 1,460 1.63 13.71 1,518 1.85 13.34 2,978 1.74 13.52 ####### Block Model Ton Ni (%) Fe (%) 1,127 1.61 12.54 372 1.87 8.55 1,265 2.28 7.95 2,764 1.95 9.90 1,080 1,800 3,300 9,158 2,764 ####### 0.8560163 6.636210804 Truck Count Block Model Ton Ni (%) Fe (%) Ton Ni (%) Fe (%) 14,940 62,618 0.39 5.43 390 170 0.94 34.25 900 1,061 1.21 40.70 1,290 1,230 1.17 39.81 17,918 23,820 ####### 331% 0.00 0.00 259% (Volume TC < Volume by Survey) Ton 333 1,146 (1,265) 214 6,394 Ton (47,678) 220 (161) 60 47,465 Variance Ni (%) 0.02 (0.02) (2.28) (0.21) Fe (%) 1.17 4.79 (7.95) 3.62 Variance Ni (%) Recovery 130% 408% 0% 108% - Fe (%) 331% B A B’ Recovery 24% 230% 85% 105% 27% 365% A’ #NAME? #NAME? Situation update 1- 20 Febaruary 2022 A B B’ A’ Review Weekly III Model Compliance CW 2 PIT CW02 Ore Type LGSO MGSO HGSO Total SSO WST Waiting Assay ETO Total Material Type OB/WST LGL HGL Total LIM Actual Mining Rec. Dilution Grade Ni Dilution Grade Fe Survey Factor ####### Ton 4,438 9,566 3,084 17,088 Weighbridge Ni (%) Fe (%) 1.65 18.93 1.89 17.61 2.04 17.51 1.85 17.93 Ton 25,543 7,905 5,058 38,505 Block Model Ni (%) Fe (%) 1.63 14.10 1.89 16.15 2.15 13.95 1.75 14.50 2,403 14,160 33,650 38,505 ####### 1.2484398 12.07943253 Truck Count Block Model Ton Ni (%) Fe (%) Ton Ni (%) Fe (%) 107,280 70,830 (244.44) (232.73) 4,290 14,720 1.21 45.27 13,680 31,400 1.46 41.40 17,970 46,120 1.38 42.63 124,368 140,490 ####### 87% 0.10 3.43 101% (Volume TC < Volume by Survey) Ton (21,104) 1,661 (1,973) (21,417) (4,855) Ton 36,450 (10,430) (17,720) (28,150) (15,033) Variance Ni (%) 0.02 (0.00) (0.11) 0.10 Variance Ni (%) 88% Fe (%) 4.83 1.46 3.56 3.43 - Fe (%) Recovery 17% 121% 61% 44% A B C 87% C’ Recovery 151% 29% 44% 39% 114% A’ Gabungan 0 #REF! B’ C Situation update 1- 20 February 2022 C’ A A’ B’ B Review Weekly III Model Compliance BBE PIT BBE Ore Type LGSO MGSO HGSO Total SSO WST Waiting Assay ETO Total Weighbridge Ton Ni (%) Fe (%) - - - ####### Block Model Ton Ni (%) Fe (%) 8,128 1.68 21.98 7,363 1.90 20.98 14,918 2.18 16.51 30,408 1.98 19.05 40,470 40,470 30,408 ####### 0 0 Truck Count Block Model Material Type Ton Ni (%) Fe (%) Ton Ni (%) Fe (%) OB/WST 22,650 10,431 1.14 36.24 LGL 9,090 1.18 49.96 HGL 4,050 1.52 38.55 22,650 63,120 ####### Actual Mining Rec. 133% Dilution Grade Ni 0.00 Dilution Grade Fe 0.00 Survey Factor 88%(Volume TC > Volume by Survey)Gabungan 0 Situation update 1- 20 February 2022 #REF! A Ton (8,128) (7,363) (14,918) (30,408) 10,062 Ton 12,219 (9,090) (4,050) 18,189 Variance Ni (%) (1.68) (1.90) (2.18) (1.98) Variance Ni (%) 180% Fe (%) (21.98) (20.98) (16.51) (19.05) - Fe (%) Recovery 0% 0% 0% 0% A 133% Recovery 217% 0% 0% 55% A’ A’ Review Weekly III Model Compliance CW3 PIT CW03 Ore Type LGSO MGSO HGSO Total SSO WST Waiting Assay ETO Total Material Type OB/WST LGL HGL Total LIM Actual Mining Rec. Dilution Grade Ni Dilution Grade Fe Survey Factor Ton Weighbridge Ni (%) Fe (%) - - - Ton - Block Model Ni (%) Fe (%) - Ton - Variance Ni (%) - Fe (%) - Recovery 0% 0% 0% 0% A Ton 38,460 11,460 20,550 32,010 38,460 #DIV/0! #DIV/0! Truck Count Ni (%) Fe (%) 38,460 Ton 57,780 14,040 14,040 ####### #DIV/0! 0.00 0.00 99% (Volume TC > Volume by Survey) Situation update 1- 20 February 2022 Block Model Ni (%) Fe (%) (29.98) 10.35 1.17 46.36 #DIV/0! #DIV/0! #DIV/0! #DIV/0! Gabungan 0 #REF! Ton (19,320) (2,580) 20,550 17,970 19,320 Variance Ni (%) 150% - Fe (%) #DIV/0! Recovery 67% 82% 0% 228% 67% A’ Review Weekly III AVAILABILITY UNIT ADT 11 : Hose Leak ADT 21 : Valve Leak ADT 49 : Reservior Leak BD 15 : Engine & Priming Pump Leak BD 22 : Cutting Worn Out BD 27 : Seal Leak REVIEW Weekly III AVAILABILITY UNIT EXC 160 : Mata Link Broken EXC 75 : Hose Leak EXC 77 : Bushing Boom Worn Out EXC 83 : Bushing StickEnd Worn Out EXC 85 : Hose Leak EXC 86 : Pipe Cylinder Coom Leak EXC 89 : Hose Leak EXC 135 : Glass Mika Broken EXC 142 : Seal Leak EXC 143 : V-Belt AC Loose Review Weekly III AVAILABILITY UNIT DTH 120 : Work Lamp Missing DTH 135 : Turbo Charge Broken DTH 139 : Muffler Leak DTH 149 : Pipe Muffler Leak DTH 161 : Oil Engine Low Level DTH 162 : Gear Idler Broken DTH 168 : Pipe Muffler Leak DTH 195 : Tyre Leak DTH 235 : Filter Transmission Leak DTH 237 : Cylinder Exhaust Break Abnormal MG 8 : Bolt Missing MG 12 : Hidraulic Oil Contaminasi REVIEW Weekly III Summary • Total Material Movements Material OB/Ws Limonite Saprolite Total Mined Week to Plan 24,727 18,754 15,843 59,325 Date (BCM) Act %Acv 31,617 127.9% 13,013 69.4% 12,406 78.3% 57,035 96.1% TMM can’t maximize because waiting prepare front & disposal • Ore Hauling Material Sap Ore Week to Date (WMT) Plan Act %Acv 26,394 26,269 99.5% Ore hauling can’t maximize due to Slipepry hauling road 27,12 Hours, maintenance loading point • Ore Barging Material Sap Ore Week to Date (WMT) Plan Act %Acv 25,867 43,057 166.5% REVIEW Weekly III GAIN AND LOSS -4% Thank You PT SINAR TERANG MANDIRI