Macbee Points
S.no
1
2
3
Snag
point
Theatre Promo video
Music content
AQI display
Status
Operations
Remarks
The new player is ordered and will
be delivered to Macbee by 21st
Please send us
Sep and if all goes well, they will
the first cut for
have
review
this working by the end of next
week.
Operations
Remarks Update
21-10-21
Lights programming
New Content is ready as per
last meeting inputs .
.
5
AMC / Warranty proposal
6
7
8
Exclusive connection for PDR
with private music playing
option
Integrated from cloud base
link > Checked
Completed
PO to be issued
to AQI vendor
9
Sound System in Ball room
10
Wifi Signal drops frequently
11
12
13
We will arrange an experienced
engineer who can operate the
system for events
SPA – Some time there is no Made some changes.
volume control , Not able to Under Observation
control Curtain and light
operation from I pad
UG area - work done.
LG area - 150 drivers
replaced. Balance 48 will be
replaced by 26th Oct.
In discussion with Projects &
Macbee
for deputation of technical
team
Cost - 30000 per room.
To be reviewed for approval
To discuss
Gym screen – One of the
screen become
uncontrollable from I pad
Frequently , requires frequent
reset manually
Music – Still Kodi gets hang
and
requires frequent manual
reset
Showed to Vivek.
The program is
not saved in the
system. The
present lighting is
too bright and
inconsistent
Shared to operation team
Karaoke Music to be updated
with the latest Bollywood music
tracks. There should be an IDue to Copy right issues for
pad/Tab to control the
music. There are only limited
selection of music, as of now we songs available.
have to control only through
the remote which is not
practical
The DTH network for the gym
cardio equipment has to be
updated with 20 channels as
we have a subscription for
the same.
Completed
Demo is planned
for 12Nov21
Completed
Content is
shared with
operations in
Pen drive
Music Collection shared Awaiting
for confirmation from operation
team
Driver changing are in progress
Completio
n Date
Sample / Promo video
shown.
Hardware input is not possible
in Display
4
Status
Drivers are
installed, under
commission and
Testing , will be
completed by
14Nov21
Completed
To be discussed
9/11/2021
Limited content
Currently no
channels
playing on
the fitness
equipment
New Content is being
worked out. To be
finalized- by 25th Oct
Quote received - 5 Lacs
- Cost approved. Under
implementation
> Cost is approved and
Macbee to implement
To set up a need-based
operator for special
events. > Not meeting
requirement / Quality
Completed
WIP , Order to be
released for DTH
network
Completed
Under
observation
Under
Observation
9/11/2021
Completed
Under
observation
Completed
Under observation
9/11/2021
Completed
Under
Observation
14
15
Meros – Bosch amplifier has
frequent problem , requires
frequent reset
Keroke – One of the TV
requires
manual reset , not able to
control thru I Pad
Completed Under
observation
Completed –
Under
observation
Dimmer System Work Summary
Open
Sr.
No
1
2
3
4
5
6
7
8
Location
Social Energy /Ball room,Pre-function and
Verandah
competitive energy
Arrival lobby , Arrival lobby's corridors
Juice Bar
Gym Area
Spa Area
UG/ Part A
UG/ Part B
Floor
LG
LG
LG
LG
LG
LG
UG
UG
Total
Snags
21
28
19
31
0
57
40
32
228
Total
Closed Open MACBEE BLUESTAR
17
25
19
24
0
0
35
29
149
4
3
0
7
0
57
5
3
79
Other
Agencise
1
1
0
1
1
0
0
1
2
2
0
5
0
1
1
5
16
1
0
19
0
3
2
14
R
Download