Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 1 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Electrical Transient Analyzer Program Load Flow Analysis Loading Category (1): Design Generation Category (1): Design Load Diversity Factor: Number of Buses: Number of Branches: None Swing V-Control Load Total 1 0 36 37 XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total 13 0 0 23 0 1 37 Method of Solution: Adaptive Newton-Raphson Method Maximum No. of Iteration: 99 Precision of Solution: 0.0001000 System Frequency: 50.00 Hz Unit System: English Project Filename: Project 1 Output Filename: C:\Rangkaian M1_Diwita Augustine_201811106_ETAP12\SLD.lfr Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 2 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Adjustments Apply Tolerance Individual Adjustments /Global Transformer Impedance: Yes Individual Reactor Impedance: Yes Individual Overload Heater Resistance: No Transmission Line Length: No Cable Length: No Apply Temperature Correction Percent Individual Adjustments /Global Transmission Line Resistance: Yes Individual Cable Resistance: Yes Individual Degree C Revision: Base Config.: Normal Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 3 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Bus Input Data Load Bus ID Initial Voltage % Mag. Ang. Bus Beban I 0.400 1 999.0 0.0 Bus Beban II 20.000 1 100.0 0.0 Bus Beban III 0.400 1 100.0 Bus Beban IV 0.400 1 100.0 Bus Beban IX 0.400 1 100.0 0.0 Bus Beban V kV Sub-sys Constant kVA MW 0.156 Mvar 0.097 Constant Z MW Constant I Mvar 0.099 0.024 0.0 0.006 0.002 0.0 0.006 0.002 0.238 0.147 0.159 0.037 0.400 1 100.0 0.0 0.006 0.002 Bus Beban VII 20.000 1 100.0 0.0 0.252 0.156 0.063 0.039 Bus Beban VIII 0.201 0.087 0.000 -0.053 0.136 0.084 0.064 0.021 0.050 0.000 0.031 0.019 20.000 1 100.0 0.0 Bus1 0.400 1 100.0 0.0 Bus2 0.400 1 100.0 0.0 Bus6 0.400 1 100.0 0.0 Bus7 0.400 1 100.0 0.0 Bus9 0.400 1 100.0 0.0 Bus19 0.400 1 100.0 0.0 Bus27 20.000 1 100.0 0.0 GD I 20.000 1 100.0 0.0 GD IA 0.400 1 100.0 0.0 GD II 20.000 1 100.0 0.0 GD III 20.000 1 100.0 0.0 GD V 20.000 1 100.0 0.0 GD VA 0.400 1 100.0 0.0 GI I 150.000 1 100.0 0.0 GI IA 20.000 1 100.0 0.0 GI II 150.000 1 100.0 0.0 GI III 150.000 1 100.0 0.0 20.000 1 100.0 0.0 GI IIIB 20.000 1 1.0 0.0 GI KIT I 500.000 1 1.0 0.0 GI KIT IA 13.800 1 100.0 0.0 GI KIT IB 13.800 1 100.0 0.0 GI KIT II GI IIIA 500.000 1 100.0 0.0 GI KIT IIA 13.800 1 100.0 0.0 GI KIT III 150.000 1 100.0 0.0 0.201 0.087 0.122 0.076 MW Mvar Generic MW Mvar Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 4 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Load Bus ID Initial Voltage kV Sub-sys % Mag. Ang. 13.800 1 1.0 0.0 GITET 500.000 1 100.0 0.0 GITET II 150.000 1 100.0 0.0 20.000 1 100.0 0.0 GI KIT IIIA Cmtr1 Constant kVA MW Total Number of Buses: 37 Generation Bus ID Bus1 kV Constant Z Mvar MW Sub-sys Mvar MW 0.513 0.272 0.068 0.042 1.819 1.006 0.551 0.135 Voltage Type Constant I Angle MW Mvar Mvar/PF Control 1 100.0 0.0 0.004 0.000 100.0 GI KIT IA 13.800 Mvar/PF Control 1 100.0 0.0 0.800 0.262 95.0 GI KIT IB 13.800 Mvar/PF Control 1 100.0 0.0 1.000 0.110 99.4 GI KIT IIA 13.800 Mvar/PF Control 1 100.0 0.0 0.300 0.130 91.8 GI KIT IIIA 13.800 Mvar/PF Control 1 1.0 0.0 0.300 0.145 90.0 Swing 1 100.0 0.0 2.404 0.647 500.000 MW 0.000 Mvar Limits % PF 0.400 GITET Mvar 0.000 Generation % Mag. Generic Max Min 0.000 Mvar 0.000 Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 5 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Line/Cable Input Data Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line) Line/Cable ID Length Library T (°C) % Tol. #/Phase 1.0NCUN3 400 32.8 0.0 1 75 0.018635 0.021641 Cable 2 1.0NCUN3 400 32.8 0.0 1 75 0.018635 0.021641 SKUTM I 20NCUS3 400 32808.4 0.0 1 75 0.018605 0.027371 SKUTM II 20NCUS3 400 32808.4 0.0 1 75 0.018605 0.027371 SKUTM III 20NCUS3 400 39370.1 0.0 1 75 0.018605 0.027371 SKUTM IV 20NCUS3 400 39370.1 0.0 1 75 0.018605 0.027371 SKUTM V 20NCUS3 400 32808.4 0.0 1 75 0.018605 0.027371 SKUTM VI 20NCUS3 400 32808.4 0.0 1 75 0.018605 0.027371 SKUTM VII 20NCUS3 400 45931.8 0.0 1 75 0.018605 0.027371 SKUTR 6 1.0MCUN3 400 32.8 0.0 1 75 0.018605 0.021641 0.0000514 SKUTR 7 1.0MCUN3 400 114.8 0.0 1 75 0.018605 0.021641 0.0000514 SUTR I 1.0MCUN3 400 164.0 0.0 1 75 0.018605 0.021641 0.0000514 SUTR II 1.0MCUN3 400 393.7 0.0 1 75 0.018605 0.021641 0.0000514 SUTR III 1.0MCUN3 400 65.6 0.0 1 75 0.018605 0.021641 0.0000514 SUTR IV 1.0MCUN3 400 65.6 0.0 1 75 0.018605 0.021641 0.0000514 SUTR V 1.0MCUN3 400 820.2 0.0 1 75 0.018605 0.021641 0.0000514 SUTET 1 158 295275.6 0.0 1 75 0.045720 0.139193 0.0000000 SUTET 2 158 262467.2 0.0 1 75 0.045720 0.139193 0.0000000 SUTT 1 158 164042.0 0.0 1 75 0.045720 0.139193 0.0000000 SUTT 2 158 147637.8 0.0 1 75 0.045720 0.139193 0.0000000 SUTT 3 158 114829.4 0.0 1 75 0.045720 0.139193 0.0000000 SUTT 4 158 98425.2 0.0 1 75 0.045720 0.139193 0.0000000 SUTT 5 158 98425.2 0.0 1 75 0.045720 0.139193 0.0000000 Line / Cable resistances are listed at the specified temperatures. Size Adj. (ft) Cable 1 R X Y Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 6 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal 2-Winding Transformer Input Data Transformer ID Rating Phase MVA Z Variation % Z1 % Tap Setting Prim. kV Sec. kV X1/R1 + 5% - 5% % Tol. Trafo DIst 3 3-Phase 0.125 20.000 0.400 4.00 1.50 0 0 0 Trafo Dist. I 20/0.4 kV 3-Phase 0.625 20.000 0.400 4.00 1.50 0 0 Trafo Dist. IV 20/0.4 kV 3-Phase 0.500 20.000 0.400 4.00 1.50 0 0 Trafo Distribusi II 3-Phase 0.563 20.000 0.400 4.00 1.50 0 Trafo Intrbus 500/150 kV Prim. Sec. Adjusted Phase Shift %Z Type 0 0 4.0000 Dyn Angle 0.000 0 0 0 4.0000 Dyn 0.000 0 -2.500 0 4.0000 Dyn 0.000 0 0 0 0 4.0000 Dyn 0.000 3-Phase 6.250 500.000 150.000 7.15 8.50 0 0 0 0 0 7.1500 YNyn 0.000 Trafo Tng I 13.8/150 kV 3-Phase 5.000 13.800 150.000 7.15 8.50 0 0 0 0 0 7.1500 YNyn 0.000 Trafo Tng I 13,8/500 kV 3-Phase 11.250 13.800 500.000 8.35 13.00 0 0 0 0 0 8.3500 YNyn 0.000 Trafo Tng I 150/20 kV 3-Phase 1.250 150.000 20.000 6.25 6.00 0 0 0 0 0 6.2500 YNd 0.000 Trafo Tng II 13,8/500 kV 3-Phase 3.875 13.800 500.000 7.15 8.50 0 0 0 0 0 7.1500 YNyn 0.000 Trafo Tng II 150/20 kV 3-Phase 2.000 150.000 20.000 6.25 6.00 0 0 0 0 0 6.2500 YNd 0.000 Trafo Tng III 13,8/500 kV 3-Phase 7.500 13.800 500.000 8.35 13.00 0 0 0 0 0 8.3500 YNyn 0.000 Trafo Tng III 150/20 kV 3-Phase 0.438 150.000 20.000 4.00 1.50 0 0 0 -5.000 0 4.0000 YNd 0.000 Trafo Tng IV 150/20 kV 3-Phase 1.875 150.000 20.000 6.25 6.00 0 0 0 0 0 6.2500 YNd 0.000 Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 7 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Branch Connections CKT/Branch Connected Bus ID ID Type From Bus % Impedance, Pos. Seq., 100 MVA Base To Bus R X Z Trafo DIst 3 2W XFMR GD III Bus19 1775.04 2662.56 3200.00 Y Trafo Dist. I 20/0.4 kV 2W XFMR GD I GD IA 355.01 532.51 640.00 Trafo Dist. IV 20/0.4 kV 2W XFMR GD V GD VA 432.67 649.00 780.00 Trafo Distribusi II 2W XFMR GD II Bus6 394.45 591.68 711.11 Trafo Intrbus 500/150 kV 2W XFMR GITET GITET II 13.37 113.62 114.40 Trafo Tng I 13.8/150 kV 2W XFMR GI KIT IIIA GI KIT III 16.71 142.02 143.00 Trafo Tng I 13,8/500 kV 2W XFMR GI KIT IA GI KIT I 5.69 74.00 74.22 Trafo Tng I 150/20 kV 2W XFMR GI I GI IA 82.20 493.20 500.00 Trafo Tng II 13,8/500 kV 2W XFMR GI KIT IB GI KIT I 21.56 183.25 184.52 Trafo Tng II 150/20 kV 2W XFMR GI II Bus27 51.37 308.25 312.50 Trafo Tng III 13,8/500 kV 2W XFMR GI KIT IIA GI KIT II 8.54 111.01 111.33 Trafo Tng III 150/20 kV 2W XFMR GI III GI IIIA 481.80 722.70 868.57 Trafo Tng IV 150/20 kV 2W XFMR GI III GI IIIB 54.80 328.80 333.33 Cable 1 Cable Bus1 Bus Beban IV 38.21 44.38 58.56 Cable 2 Cable Bus2 Bus Beban V 38.21 44.38 58.56 SKUTM I Cable GI IA GD I 15.26 22.45 27.15 SKUTM II Cable Bus27 GD II 15.26 22.45 27.15 SKUTM III Cable Bus27 Bus Beban II 18.31 26.94 32.57 SKUTM IV Cable Bus27 GD III 18.31 26.94 32.57 SKUTM V Cable GI IIIA Bus Beban VII 15.26 22.45 27.15 SKUTM VI Cable GI IIIB Bus Beban VIII 15.26 22.45 27.15 SKUTM VII Cable GI IIIB GD V 21.36 31.43 38.00 SKUTR 6 Cable Bus6 Bus7 38.15 44.38 58.52 0.0000003 SKUTR 7 Cable Bus6 Bus9 133.53 155.31 204.82 0.0000009 SUTR I Cable GD IA Bus Beban I 190.76 221.88 292.60 0.0000013 SUTR II Cable Bus19 Bus Beban III 457.81 532.50 702.25 0.0000032 SUTR III Cable Bus Beban IV Bus Beban III 76.30 88.75 117.04 0.0000005 SUTR IV Cable Bus Beban V Bus Beban IV 76.30 88.75 117.04 0.0000005 SUTR V Cable GD VA Bus Beban IX 953.78 1109.38 1463.01 0.0000067 SUTET 1 Line GI KIT I GITET 0.54 1.64 1.73 0.2250000 SUTET 2 Line GI KIT II GITET 0.48 1.46 1.54 0.2000000 SUTT 1 Line GITET II GI I 3.33 10.15 10.68 0.1125000 SUTT 2 Line GI KIT III GI I 3.00 9.13 9.61 0.1012500 SUTT 3 Line GI II GI KIT III 2.33 7.10 7.48 0.0787500 SUTT 4 Line GI II GI I 2.00 6.09 6.41 0.0675000 SUTT 5 Line GI III GI II 2.00 6.09 6.41 0.0675000 CB75 Tie Breakr Bus Beban II Cmtr1 Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 8 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal LOAD FLOW REPORT Bus ID Voltage kV % Mag. Generation Ang. MW Load Mvar MW Load Flow Mvar ID MW XFMR Mvar Amp %PF Bus Beban I 0.400 95.454 -2.9 0 0 0.247 0.119 GD IA -0.247 -0.119 414.2 90.1 Bus Beban II 20.000 96.232 -3.3 0 0 0 0 Bus27 -0.576 -0.311 19.6 88.0 Bus Beban III 0.400 95.973 -3.4 0 0.005 0.002 0 Cmtr1 0.576 0.311 19.6 88.0 Bus19 -0.012 -0.005 19.7 91.8 0.007 0.003 11.4 89.1 Bus Beban IV Bus Beban IV 0.400 95.964 -3.4 0 Bus Beban IX 0.400 89.940 -5.5 0 Bus Beban V 0.400 95.958 -3.4 0 Bus Beban VII 20.000 100.630 -2.3 Bus Beban VIII 20.000 96.943 -2.9 Bus1 0.400 95.965 -3.4 Bus2 0.400 95.958 -3.4 Bus6 0.400 94.669 -3.9 0 0.005 0.002 Bus1 -0.004 0.000 5.6 100.0 Bus Beban III -0.007 -0.003 11.4 89.1 Bus Beban V 0.005 0.002 8.3 95.0 -0.367 -0.177 654.2 90.0 0 0.367 0.177 GD VA 0 0.005 0.002 Bus2 0.000 0.000 0.0 0.0 Bus Beban IV -0.005 -0.002 8.3 95.0 85.0 0 0.315 0.195 GI IIIA -0.315 -0.195 10.6 0 0 0.201 0.037 GI IIIB -0.201 -0.037 6.1 98.3 0.004 0.000 0 0 Bus Beban IV 0.004 0.000 5.6 100.0 0 0 0 0 Bus Beban V 0.000 0.000 0.0 0.0 0 0 0 0 Bus7 0.193 0.103 334.3 88.2 0 Bus9 0.045 0.000 68.3 100.0 GD II -0.238 -0.103 395.9 91.7 Bus7 0.400 94.542 -3.9 0 0 0.193 0.103 Bus6 -0.193 -0.103 334.3 88.2 Bus9 0.400 94.606 -3.9 0 0 0.045 0.000 Bus6 -0.045 0.000 68.3 100.0 Bus19 0.400 96.059 -3.4 0 0 0 0 Bus27 GD I GD IA 20.000 96.429 -3.2 0 0 0 20.000 97.813 -2.1 0 0 0 0 0.400 96.224 -2.7 0 0 0 0 GD II 20.000 96.313 -3.3 0 GD III 20.000 96.425 -3.2 0 GD V 0 20.000 96.763 -2.9 0 Bus Beban III 0.012 0.005 19.7 91.8 GD III -0.012 -0.005 19.7 91.8 GD II 0.442 0.195 14.5 91.5 Bus Beban II 0.576 0.312 19.6 87.9 GD III 0.012 0.005 0.4 91.7 GI II -1.031 -0.513 34.5 89.5 GI IA -0.251 -0.125 8.3 89.5 GD IA 0.251 0.125 8.3 89.5 Bus Beban I 0.248 0.121 414.2 89.9 GD I -0.248 -0.121 414.2 89.9 -0.442 -0.195 14.5 91.5 0 0.201 0.087 Bus27 Bus6 0.241 0.108 7.9 91.3 0 0 0 Bus27 -0.012 -0.005 0.4 91.7 Bus19 0.012 0.005 0.4 91.7 GI IIIB -0.547 -0.307 18.7 87.2 GD VA 0.396 0.214 13.4 88.0 0 0.151 0.094 %Tap -2.500 Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Diwita Augustine Filename: Project 1 Study Case: LF Bus ID GI I GI IA GI II GI III Voltage kV % Mag. Generation Ang. 0.400 96.056 -3.9 150.000 98.731 -1.4 20.000 150.000 150.000 97.881 98.663 98.608 -2.1 -1.5 -1.5 MW Load Mvar 0 0 0 0 0 MW 0 0 0 0 0 Mvar 0 0 0 0 0 ID 0 0 0 0 0 20.000 100.721 -2.3 0 0 0 0 GI IIIB 20.000 96.983 -2.9 0 0 0 0 Bus Beban IX 500.000 100.017 0.0 0 0 GI KIT IA 13.800 100.254 0.3 0.800 0.262 GI KIT IB 13.800 100.416 1.0 1.000 0.110 GI KIT II 500.000 100.005 0.0 0 0 0 13.800 100.174 0.2 GI KIT III 150.000 98.706 -1.4 0.300 0 0.130 0 GITET II Normal 0 MW 0.387 XFMR Mvar Amp %PF 0.200 654.1 88.8 -0.387 -0.200 654.1 88.8 -2.066 -0.815 8.7 93.0 GI KIT III 0.399 0.086 1.6 97.7 GI II 1.415 0.599 6.0 92.1 GI IA 0.252 0.129 1.1 88.9 GD I 0.251 0.125 8.3 89.5 GI I -0.251 -0.125 8.3 89.5 GI KIT III -0.699 -0.405 3.2 86.5 GI I -1.414 -0.663 6.1 90.5 GI III 1.075 0.511 4.6 90.3 Bus27 1.038 0.557 4.6 88.1 GI II -1.075 -0.576 4.8 88.1 GI IIIA 0.322 0.206 1.5 84.3 GI IIIB 0.752 0.370 3.3 89.7 Bus Beban VII 0.316 0.196 10.6 85.0 -0.316 -0.196 10.6 85.0 Bus Beban VIII 0.201 0.037 6.1 98.3 GD V 0.548 0.309 18.7 87.1 GI III -0.749 -0.346 24.5 90.8 GITET 1.797 0.348 2.1 98.2 GI KIT IA -0.800 -0.257 1.0 95.2 GI KIT IB -0.998 -0.092 1.2 99.6 0 GI KIT I 0.800 0.262 35.1 95.0 0 0 GI KIT I 1.000 0.110 41.9 99.4 0 0 GITET 0.300 0.129 0.4 91.9 -0.300 -0.129 0.4 91.9 91.8 0 0 0 0 GI KIT II 0.300 0.130 13.7 0 GI I -0.399 -0.185 1.7 90.7 GI II 0.699 0.328 3.0 90.5 -0.300 -0.143 1.3 90.2 0.300 0.145 14.1 90.0 GI KIT IIIA * GITET Base Config.: GITET II GI KIT IIA GI KIT IIA Revision: GD V GI III GI KIT IIIA 09-27-2021 Load Flow GI IIIA GI KIT I 9 Date: SN: Engineer: GD VA Page: 13.800 98.964 -1.2 0.300 0.145 0 0 GI KIT III 500.000 100.000 0.0 -0.023 -0.136 0 0 GI KIT I -1.797 -0.573 2.2 95.3 GI KIT II -0.300 -0.329 0.5 67.4 150.000 98.879 -1.3 0 0 0 0 GITET II 2.074 0.766 2.6 93.8 GI I 2.068 0.710 8.5 94.6 -2.068 -0.710 8.5 94.6 GITET %Tap -5.000 Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: 10 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Bus ID Cmtr1 Page: Voltage kV % Mag. 20.000 96.232 Generation Ang. -3.3 MW Load Mvar 0 MW 0 * Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it) # Indicates a bus with a load mismatch of more than 0.1 MVA 0.576 Revision: Base Config.: Normal Load Flow Mvar 0.311 ID Bus Beban II MW -0.576 XFMR Mvar -0.311 Amp 19.6 %PF 88.0 %Tap Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 11 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Bus Loading Summary Report Directly Connected Load Bus ID Constant kVA kV Rated Amp MW Constant Z Mvar Bus Beban I 0.400 0.156 0.097 Bus Beban II 20.000 0 0 Bus Beban III 0.400 0 0 Bus Beban IV 0.400 0 0 Bus Beban IX 0.400 0.238 Bus Beban V 0.400 Bus Beban VII Bus Beban VIII MW Constant I Mvar MW Generic Mvar MW Mvar MVA % PF Amp 0.022 0 0 0 0 0.274 90.1 414.2 0 0 0 0 0 0 0.654 88.0 19.6 0.005 0.002 0 0 0 0 0.013 91.8 19.7 0.005 0.002 0 0 0 0 0.011 95.0 16.6 0.147 0.129 0.030 0 0 0 0 0.408 90.0 654.2 0 0 0.005 0.002 0 0 0 0 0.006 95.0 8.3 20.000 0.252 0.156 0.064 0.039 0 0 0 0 0.371 85.0 10.6 20.000 0.201 0.087 0 -0.049 0 0 0 0 0.219 91.8 6.5 Bus1 0.400 0 0 0 0 0 0 0 0 0.004 100.0 5.6 Bus2 0.400 0 0 0 0 0 0 0 0 0 0.0 0.0 Bus6 0.400 0 0 0 0 0 0 0 0 0.260 91.7 395.9 Bus7 0.400 0.136 0.084 0.057 0.019 0 0 0 0 0.219 88.2 334.3 Bus9 0.400 0 0 0.045 0 0 0 0 0 0.045 100.0 68.3 Bus19 0.400 0 0 0 0 0 0 0 0 0.013 91.8 19.7 Bus27 20.000 0 0 0 0 0 0 0 0 1.151 89.5 34.5 GD I 20.000 0 0 0 0 0 0 0 0 0.281 89.5 8.3 GD IA 0.400 0 0 0 0 0 0 0 0 0.276 89.9 414.2 GD II 20.000 0.201 0.087 0 0 0 0 0 0 0.483 91.5 14.5 GD III 20.000 0 0 0 0 0 0 0 0 0.013 91.7 0.4 GD V 20.000 0.122 0.076 0.029 0.018 0 0 0 0 0.627 87.2 18.7 GD VA 0.400 0 0 0 0 0 0 0 0 0.435 88.8 654.1 GI I 0.090 Total Bus Load 150.000 0 0 0 0 0 0 0 0 2.221 93.0 8.7 GI IA 20.000 0 0 0 0 0 0 0 0 0.281 89.5 8.3 GI II 150.000 0 0 0 0 0 0 0 0 2.368 89.3 9.2 GI III 150.000 0 0 0 0 0 0 0 0 1.219 88.1 4.8 20.000 0 0 0 0 0 0 0 0 0.371 85.0 10.6 GI IIIB 20.000 0 0 0 0 0 0 0 0 0.825 90.8 24.5 GI KIT I 500.000 0 0 0 0 0 0 0 0 1.831 98.2 2.1 GI KIT IA 13.800 0 0 0 0 0 0 0 0 0.842 95.0 35.1 GI KIT IB 13.800 0 0 0 0 0 0 0 0 1.006 99.4 41.9 GI KIT II 500.000 0 0 0 0 0 0 0 0 0.326 91.9 0.4 GI KIT IIA 13.800 0 0 0 0 0 0 0 0 0.327 91.8 13.7 GI KIT III 150.000 0 0 0 0 0 0 0 0 0.772 90.5 3.0 13.800 0 0 0 0 0 0 0 0 0.333 90.0 14.1 GITET 500.000 0 0 0 0 0 0 0 0 2.283 91.9 2.6 GITET II 150.000 0 0 0 0 0 0 0 0 2.186 94.6 8.5 GI IIIA GI KIT IIIA Percent Loading Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 12 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Directly Connected Load Bus ID Cmtr1 Constant kVA kV 20.000 Rated Amp MW 0.513 Mvar 0.272 Constant Z MW 0.063 Total Bus Load Constant I Mvar 0.039 * Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating). # Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating). MW 0 Generic Mvar 0 MW 0 Mvar 0 MVA 0.654 % PF 88.0 Amp 19.6 Percent Loading Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 13 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Branch Loading Summary Report Transformer CKT / Branch ID Cable & Reactor Type Ampacity (Amp) Cable 1 Cable 464.75 Cable 2 Cable 464.75 SKUTM I Cable 523.59 Loading Amp % 5.60 1.21 8.28 1.58 SKUTM II Cable 523.59 14.47 2.76 SKUTM III Cable 523.59 19.63 3.75 SKUTM IV Cable 523.59 0.39 0.08 SKUTM V Cable 523.59 10.64 2.03 SKUTM VI Cable 523.59 6.08 1.16 SKUTM VII Cable 523.59 18.71 3.57 SKUTR 6 Cable 462.86 334.35 72.24 SKUTR 7 Cable 462.86 68.28 14.75 SUTR I Cable 462.86 414.17 89.48 SUTR II Cable 462.86 19.69 4.25 SUTR III Cable 462.86 11.43 2.47 SUTR IV Cable 462.86 8.31 1.80 Cable 462.86 654.15 141.33 * SUTR V Capability (MVA) Loading (input) MVA Loading (output) % MVA % Trafo DIst 3 Transformer 0.125 0.013 10.5 0.013 10.5 Trafo Dist. I 20/0.4 kV Transformer 0.625 0.281 44.9 0.276 44.2 Trafo Dist. IV 20/0.4 kV Transformer 0.500 0.450 90.0 0.435 87.1 Trafo Distribusi II Transformer 0.563 0.264 46.9 0.260 46.1 Trafo Intrbus 500/150 kV Transformer 6.250 2.211 35.4 2.186 35.0 Trafo Tng I 13.8/150 kV Transformer 5.000 0.333 6.7 0.332 6.6 Trafo Tng I 13,8/500 kV Transformer 11.250 0.842 7.5 0.840 7.5 Trafo Tng I 150/20 kV Transformer 1.250 0.283 22.7 0.281 22.5 Trafo Tng II 13,8/500 kV Transformer 3.875 1.006 26.0 1.002 25.9 Trafo Tng II 150/20 kV Transformer 2.000 1.178 58.9 1.151 57.6 Trafo Tng III 13,8/500 kV Transformer 7.500 0.327 4.4 0.326 4.4 Trafo Tng III 150/20 kV Transformer 0.438 0.383 87.4 0.371 84.8 Trafo Tng IV 150/20 kV Transformer 1.875 0.838 44.7 0.825 44.0 * Indicates a branch with operating load exceeding the branch capability. Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 14 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Branch Losses Summary Report CKT / Branch ID From-To Bus Flow To-From Bus Flow MW MW Mvar Mvar Losses kW % Bus Voltage kvar From To Vd % Drop in Vmag SUTR I -0.247 -0.119 0.248 0.121 1.6 1.8 95.5 96.2 0.77 SKUTM III -0.576 -0.311 0.576 0.312 0.8 1.2 96.2 96.4 0.20 SUTR II -0.012 -0.005 0.012 0.005 0.0 0.0 96.0 96.1 0.09 SUTR III 0.007 0.003 -0.007 -0.003 0.0 0.0 96.0 96.0 0.01 -0.004 0.000 0.004 0.000 0.0 0.0 96.0 96.0 0.00 SUTR IV Cable 1 0.005 0.002 -0.005 -0.002 0.0 0.0 96.0 96.0 0.01 SUTR V -0.367 -0.177 0.387 0.200 19.6 22.8 89.9 96.1 6.12 96.0 96.0 0.2 0.3 100.6 100.7 Cable 2 0.000 0.000 0.000 0.000 SKUTM V -0.315 -0.195 0.316 0.196 SKUTM VI -0.201 -0.037 0.201 0.037 0.1 0.1 96.9 97.0 0.04 0.193 0.103 -0.193 -0.103 0.2 0.2 94.7 94.5 0.13 SKUTR 6 SKUTR 7 0.09 0.045 0.000 -0.045 0.000 0.0 0.0 94.7 94.6 0.06 Trafo Distribusi II -0.238 -0.103 0.241 0.108 3.0 4.5 94.7 96.3 1.64 Trafo DIst 3 -0.012 -0.005 0.012 0.005 0.0 0.0 96.1 96.4 0.37 SKUTM II 0.442 0.195 -0.442 -0.195 0.4 0.6 96.4 96.3 0.12 SKUTM IV 0.012 0.005 -0.012 -0.005 0.0 0.0 96.4 96.4 0.00 Trafo Tng II 150/20 kV -1.031 -0.513 1.038 0.557 7.3 43.9 96.4 98.7 2.23 SKUTM I -0.251 -0.125 0.251 0.125 0.1 0.2 97.8 97.9 0.07 0.251 0.125 -0.248 -0.121 2.9 4.4 97.8 96.2 1.59 -0.547 -0.307 0.548 0.309 0.9 1.3 96.8 97.0 0.22 0.396 0.214 -0.387 -0.200 9.1 13.7 96.8 96.1 0.71 Trafo Dist. I 20/0.4 kV SKUTM VII Trafo Dist. IV 20/0.4 kV SUTT 1 -2.066 -0.815 2.068 0.710 1.7 -104.8 98.7 98.9 0.15 SUTT 2 0.399 0.086 -0.399 -0.185 0.1 -98.5 98.7 98.7 0.02 SUTT 4 1.415 0.599 -1.414 -0.663 0.5 -64.3 98.7 98.7 0.07 0.252 0.129 -0.251 -0.125 0.7 4.1 98.7 97.9 0.85 -0.699 -0.405 0.699 0.328 0.1 -76.2 98.7 98.7 0.04 Trafo Tng I 150/20 kV SUTT 3 SUTT 5 1.075 0.511 -1.075 -0.576 0.3 -64.8 98.7 98.6 0.06 Trafo Tng III 150/20 kV 0.322 0.206 -0.316 -0.196 6.9 10.3 98.6 100.7 2.11 Trafo Tng IV 150/20 kV 0.752 0.370 -0.749 -0.346 4.0 23.8 98.6 97.0 1.62 SUTET 1 1.797 0.348 -1.797 -0.573 0.2 -224.5 100.0 100.0 0.02 Trafo Tng I 13,8/500 kV -0.800 -0.257 0.800 0.262 0.4 5.2 100.0 100.3 0.24 Trafo Tng II 13,8/500 kV -0.998 -0.092 1.000 0.110 2.2 18.4 100.0 100.4 0.40 0.300 0.129 -0.300 -0.329 0.0 -200.0 100.0 100.0 0.00 SUTET 2 Trafo Tng III 13,8/500 kV -0.300 -0.129 0.300 0.130 0.1 1.2 100.0 100.2 0.17 Trafo Tng I 13.8/150 kV -0.300 -0.143 0.300 0.145 0.2 1.6 98.7 99.0 0.26 Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 15 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF CKT / Branch ID Trafo Intrbus 500/150 kV From-To Bus Flow To-From Bus Flow MW MW 2.074 Mvar 0.766 -2.068 Mvar -0.710 Losses kW Revision: Base Config.: Normal % Bus Voltage kvar 6.5 55.5 70.1 -617.8 From To 100.0 98.9 Vd % Drop in Vmag 1.12 Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 16 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal Alert Summary Report % Alert Settings Critical Marginal Loading Bus 100.0 95.0 Cable 100.0 95.0 Reactor 100.0 95.0 Line 100.0 95.0 Transformer 100.0 95.0 Panel 100.0 95.0 Protective Device 100.0 95.0 Generator 100.0 95.0 Inverter/Charger 100.0 95.0 OverVoltage 105.0 102.0 UnderVoltage 90.0 95.0 OverExcited (Q Max.) 100.0 95.0 UnderExcited (Q Min.) 100.0 Bus Voltage Generator Excitation Critical Report Device ID Type Condition Bus Beban IX Bus Under Voltage SUTR V Cable Overload Rating/Limit 0.40 462.86 Unit kV Amp Operating % Operating Phase Type 0.36 89.9 3-Phase 654.15 141.3 3-Phase Marginal Report Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type Bus6 Bus Under Voltage 0.40 kV 0.38 94.7 3-Phase Bus7 Bus Under Voltage 0.40 kV 0.38 94.5 3-Phase Bus9 Bus Under Voltage 0.40 kV 0.38 94.6 3-Phase Project: Prak. ASTL Ganjil 2021/2022 Location: Lab Sistem Tenaga Akhir ETAP 12.6.0H Contract: Page: 17 Date: 09-27-2021 SN: Engineer: Diwita Augustine Filename: Project 1 Study Case: LF Revision: Base Config.: Normal SUMMARY OF TOTAL GENERATION , LOADING & DEMAND MW Mvar MVA % PF -0.023 -0.136 0.138 16.51 Lagging Source (Non-Swing Buses): 2.404 0.647 2.489 96.56 Lagging Total Demand: 2.381 0.511 2.435 97.77 Lagging Total Motor Load: 1.819 1.006 2.078 87.50 Lagging Total Static Load: 0.492 0.123 0.507 97.03 Lagging Total Constant I Load: 0.000 0.000 0.000 Total Generic Load: 0.000 0.000 0.000 Apparent Losses: 0.070 -0.618 System Mismatch: 0.000 0.000 Source (Swing Buses): Number of Iterations: 3