[NAME & LOGO OF IMPLEMENTING AGENCY]
[PROJECT NAME (PPP)]
Independent Engineer
[NAME OF CONSULTING FIRM]
Executive Summary
MONTHLY PROGRESS REPORT NO. [XX]
FOR THE MONTH OF: [MONTH], [YEAR]
1.1
Summary of Current Month’s Progress
Expected Contents & Structure of Summary
Please write a summary of construction progress in the current month, along with pending items,
issues and actions recommended. Refer to quantitative data and facts from the subsequent sections as
necessary, using the following format
Summary of Progress [Please include inter alia, the following]:




Physical progress & length completed – Actual vs. target
Additional detail such as mobilization status, completion of structures, financial details,
escrow withdrawal etc. as necessary
Land Acquisition, clearances & utilities shifting – Total land in possession, current month
progress, workfront available
Additional detail such as encumbrances, encroachment etc.
Current Issues & Recommended Actions by IE [Please include inter alia, the following]:




Issues related to progress made by concessionaire
Issues with pending land acquisition, clearances & utility shifting, encumbrances etc.
Status of change of scope proposals – If applicable
Action recommended by IE along with timelines

Highlight potential risks due to the pending issues & pending issues from previous month
Sample Summary – Illustrative, for reference
Summary of Progress – [MONTH, YEAR]:
Total length of project is Xx km from [Chainage] to [Chainage] with total cost Xx Cr.
Appointed Date was [DD/MM/YYYY] and scheduled date of completion of construction was
[DD/MM/YYYY] (with xxx days construction period).
Cumulative physical progress is Xx%, against scheduled progress of Yy%. Financial progress is
Zz%. Total expenditure till date is [TOTAL EXPENDITURE in Cr], including withdrawal from the
escrow account. There is a gap of [GAP TO TARGET] which might delay the next milestone which is
[DAYS TO NEXT MILESTONE] away unless this gap is covered up in the next few months. This
delay is primarily due to poor mobilization by the concessionaire on site in the last few months.
Total progress of DBM layer is Xx km, with Yy km pending across the entire stretch. Service road
construction is yet to start.
Good progress in land acquisition, with only [Pending Land] pending acquisition, all of which
is in 3D stage. [COMPENSATION AMOUNT] Cr. Compensation was disbursed in the previous
month. Many encroachments and buildings were demolished and land made available.
Proposal for diversion of forest land (Xx Ha) submitted to Regional Office on [DD/ MM/
YYYY], MoEF, awaiting final clearance.
Now, Xx km of project highway is encumbrance free and available for construction.
Current Issues & Recommended Actions by IE:
1. Slow Progress of Structures: The progress of structures (especially, major bridges,
flyovers and ROB’s) is very slow. Overall progress is only XX%. Out of the total YY
underpasses not even single underpass structure and its approaches is completed so
far. No bridge is open to traffic so far.
a. Recommendation: Concessionaire should improve the progress of structures.
Request for revised workplan from Concessionaire including specific activities on
structures.
2. Status of Change of Scope Proposals: Concessionaire has submitted Xx No. Change of
Scope proposals. Yy No. of them are still pending for decision. Concessionaire has not
submitted necessary clarifications /details for the following Changes of Scope in spite
of several reminders.
a. Recommendation: Concessionaire to submit all pending clarifications to
Authority. Authority and Concessionaire to expedite pending COS proposals.
1.2
1.2.1
Critical Issues & Action Log
Pending Issues & Action Log
SNo
Issue
Description
1
Diversion of
Xx ha of
forest Land
2
21 Cr
compensation
disbursement
pending
Type
Clearance
Land
Acquisition
Slow progress
Concessionaire
3
by
Issue
concessionaire
Ongoing/
Chainage(s) Length
New
Concerned
affected due affected Action(s) taken till now
Issue/
Authority
to the issue
(km)
Resolved
Ongoing
Issue
MoEF
[Chainage]
1. Proposal submitted to
MoEF
4 kms 2. Letter sent by RO to
MoEF nodal officer on
[DD/MM/YYYY]
Resolved
[CALA
Name]
[Chainage]
1. Escalated to chief
secretary level through
2.4 km DO from Chairman/
Secretary, dated
[DD/MM/YYYY]
New
Issue
[Concess.
Name]
[Chainage]
57 km
None
Action(s) suggested by the IE
Expected date/
Actual Date for
resolving issue
Escalate to higher level officers at
MoEF
[DD/MM/YYYY]
[DD/MM/YYYY]
Project Director to call higher ups
of concessionaire
[DD/MM/YYYY]
1.2.2
Obligations as per Contract
Expected Contents & Structure
Please write a summary of non-compliances of contractual obligations highlighting reasons
for delay, stating pending actions and their potential risk to the project’s progress and
recommended actions by the IE.

Critical obligations and constraints of concessionaire as per contract

Critical obligations of authority as per contract

Critical pending obligations of IE as per contract
NOTE: Please include important issues requiring intervention of various parties,
giving details and background wherever necessary
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.3
1.3.1
Project Overview
Salient Features of Project
Project Name
NH No. (New/ Old)
Scheme/ Phase
Mode of the Execution (BOT Toll/ BOT Annuity/
EPC/ HAM/ Item Rate/ Others)
No. of Lanes/ Configuration
Length of the Project (in Km)
Total Project Cost (in Cr)
No. of Bypasses (Name of Town, Length)
No. of Major Bridges (Number and Location)
No. of Toll Plazas (Number and Location)
No. of Fly Overs (Number and Location)
DPR Consultant Name
Lead & Consortium Members of Banks
Concessionaire Name (SPV & Parent Company)
Date of Award (LOA Date)
Appointed Date
Concession Period
Construction Period (in Days)
O&M Period (in Days)
Scheduled Date of Completion
Independent Engineer
IE Agreement Date
IE Mobilization Date
6
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.3.2
Project Milestones
Project
Milestone
Description
(Days from
Appointed
Date)
Planned
Actual
Physical
Physical
Scheduled Date
Progress (%)
Progress (%)
Revised Date
Delay
Current
(No. of
Status
months)
Milestone I [Description]
25
[DD/MM/YYYY] 25
[DD/MM/YYYY]
5
Achieved
Milestone
II
[Description]
65
[DD/MM/YYYY]
[DD/MM/YYYY] 22
Started,
not
achieved
Scheduled
[Description]
Completion
100
[DD/MM/YYYY]
[DD/MM/YYYY] 21
Not
started
7
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.3.3
Location Map
8
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.3.4
Key Plan
[Above image is illustrative only. Please include chainage and name below the axis and list of features above the axis]
9
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.4
Physical Progress
Physical Progress
Physical Progress
Component
% Weightage
Road Works
35.00%
5%
(Cumulative, Upto Current
Month)
15.0%
Major Bridge works and ROB / RUB
40.00%
1.20%
26.2%
Structures
21.00%
0.00%
0.8%
4.00%
0.00%
0.0%
(During Current Month)
Other Works
Physical Progress
2%
ILLUSTRATIVE LIST OF COMPONENTS. PLEASE USE
STANDARD LIST OF COMPONENTS DEFINED IN SCHEDULE G
OF CONTRACT AGREEMENT (LIST INCLUDED IN ANNEX 1)
10
42.0%
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.4.1
Detailed Scope of Work & Physical Progress by Component
Component
1
Cost
Weightage
in Project
(%)
2
1. Road works including
culverts, minor bridges,
underpasses, overpasses,
approaches to ROB/RUB/
Major Bridges/ Structures
(but excluding service roads)
35.00%
2. Major Bridge works and
ROB/RUB
40.00%
3. Structures (elevated
sections, reinforced earth)
21.00%
4. Other Works
4.00%
Item Description
Cost Weightage
in Component
(%)
Planned in
Scope (As per
Scope of Work)
Progress till Date
%
Physical
Progress
3
1. C&G
2. Embankment
3. Sub Grade
4. GSB
5. WMM
6. DBM
7. BC
1. Major Bridges
2. Minor Bridges
3. Flyovers
4. ROB
5. VUP
6. PUP
7. RUB
1. Foundation
2. Sub-structure
3. Super-structure
4. Reinforced Earth Wall
1. Toll Plaza
4
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
10.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
6.00%
4.00%
5
80 km
80 km
80 km
80 km
80 km
80 km
80 km
6 No
23 No
2 No
228 No
11 No
15 No
136 No
35 km
35 km
35 km
35 km
4 No
6
45 km
40 km
35 km
33 km
30 km
28 km
27 km
6 No
21 No
0
121 No
6 No
6 No
114 No
2.2 km
2.1 km
2.1 km
2.1 km
0
7
56%
50%
44%
41%
38%
35%
34%
100%
91%
0%
53%
55%
40%
84%
6%
6%
6%
6%
0%
GRAND TOTAL
100%
ILLUSTRATIVE LIST OF COMPONENTS. PLEASE USE
STANDARD LIST OF COMPONENTS DEFINED IN SCHEDULE G
OF CONTRACT AGREEMENT (LIST INCLUDED IN ANNEX 1)
11
Value of
Physical
Progress
(7X4)
8
2.8%
2.5%
2.2%
2.1%
1.9%
1.8%
1.7%
10.0%
4.6%
0.0%
2.7%
2.7%
2.0%
4.2%
0.2%
0.2%
0.2%
0.2%
0.0%
42.0%
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
Strip Plan (Details)
Not Started/ NA
WI
1
WI
2
WI
3
Minor bridges
Type of Structures
NoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNo
NoNoNoNoNoYesYesYes YesNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNo
NoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNo
COCOCOCOCOM
COCOM
COM COCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOM
COCOCOCOCOM
COCOM
COM COCOCOCOCOCOCOCOCOWI COCOCOCOCOCOCOCOCOCOCOCOCOCOM
COCOCOCOCOM
COCOM
COM COCOCOCOCOCOCOCOCOM COCOCOCOCOCOCOCOCOCOCOCOCOCOM
COCOCOCOCOM
COCOM
COM COCOCOCOCOCOCOCOCOM COCOCOCOCOCOCOCOCOCOCOCOCOCOM
COCOCOCOCO
COCO
COCOCOWI COCOWI WI WI COCOCOCOCOCOCOCOCOCOCOCOCOCOM
Major Bridge
Workfront Available
‐ LA pending
‐ Clearance pending
'‐ Other Hindrances
C&G
Sub‐Grade
GSB
WMM
DBM
BC
RHS‐Service Road Workfront
RHS‐Service Road Const.
Bypass
Status of Structures
Number of Strucrures
Completed
COCOCOCOCOM
CO CO
CO
COCOWI WI CO
COCOCOCOCO COCOCOCOCOCOM
COCOCOCOCOM
CO CO
COM
COCOCOCOM COM
COCOCOCOCOM COCOCOCOCOCOM
COCOCOCOCOM
CO CO
COM
COCOCOCOM COM
COCOCOCOCOWI COCOCOCOCOCOM
COCOCOCOCOM
CO CO
COM
COCOCOCOM COWI WIP COCOCOCOCOCOCOCOCOCOCOCOM
COCOCOCOCOM
CO CO
COM
COCOCOCOM COCOCOM COCOCOCOCOCOCOCOCOCOCOCOM
NoNoNoNoNoNoNo
NoNoNoNoNoYesYesYes Yes No
NoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNo
Major Bridge
Chainage
Work In Progress
0
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
LHS‐MCW
Workfront
LHS‐MCW
Construction
LHS‐Service Road Const.
LHS‐Service Road Workfront
BC
DBM
WMM
GSB
Sub‐Grade
C&G
‐ Other Hindrances
‐ Clearance pending
‐ LA pending
Workfront Available
RHS‐MCW
Wokfront
1.5.1
Strip Plan
RHS‐MCW
1.5
12
Workfronnt
Available
Workfront
Unavailable
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.5.2
Strip Plan (Summary)
1. Workfront Unavailable & Reason for
Unavailability
% Total
Prnding
Length
Length
(km)
Total Length
80
Total Workfront
Unavailable
Pending
Land
Acq.
Pending
Clearances
Encumbrances
1.6
1.6.1
2. Length Completed by Layer (MCW)
Length (km)
Total Length
Total Length
Completed
(Till DBM)
7
12%
0
0%
BC
7
12%
0
0%
3. Length Completed by Layer (Service
Road)
% Total
Length
80
27.5
33%
27
32%
DBM
27.5
WMM
GSB
Sub-Grade
C&G
29.5
32.5
35
47.9
Length
(km)
Total Length
Total Length
Completed
(Till DBM)
% Total
Length
35
0
0%
BC
0
0%
33%
DBM
0
0%
35%
39%
42%
57%
WMM
GSB
Sub-Grade
C&G
0
0
0
0
0%
0%
0%
0%
Land Acquisition and Clearances
LA Summary
Description
Total Required (ha)
Total in possession at start
(ha)
Total to be acquired (ha)
Existing ROW
135.00
135.00
0.00
Pvt. Land To be Acquired
240.00
0.000
240.00
Public Land To be Transferred 52.00
50.35
1.65
Grand Total
185
242
427
13
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.6.2
LA Detail by CALA
CALA
[CALA
1]
[CALA
2]
[CALA
3]
Grand
Total
1.6.3
Total
Land left
to be
Acquired
(Ha)
150
67
23
240
3H
Pend
ing
(ha)
3H
Done
(ha)
15
15
0
0
23
23
38
202
3G
Pend
ing
(ha)
Amount
Amount
Amount Disbursed Pending
3G
3D
3D
3A
3A
Awarded Deposited by CALA Amount
Done Pending Done Pending Done
(Crore
(Crore
(ha)
(ha)
(ha)
(Ha)
(ha)
(Crore
(Crore
Rs.)
Rs.)
Rs.)
Rs.)
15
135
0
150
0
150
396
370
327
43
0
67
0
67
0
67
132
132
120
23
23
0
14
9
0
23
0
0
0
0
38
202
14
226
0
240
528
502
447
66
Clearances Summary
Environment
Proposal Description
Approval of construction in coastal zone
Status
Obtained
Length
Impacted
Current Stage
Nil
Issues/ Comments
Completed
Forest Land
Proposal Description
Status
Diversion of Xx ha ([Chainage])
Pending
Diversion of Xx Ha. ([Chainage])
Obtained
Length
Impacted
Current Stage
[Length in km] Completed
Ongoing
Nil
14
Issues/ Comments
Stage 1 clearance pending
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
Wildlife
Proposal Description
Diversion of Xx Ha. of forest land
Status
Length
Impacted
Pending
[Length in km]
Current Stage
Ongoing
Issues/ Comments
Queries sent to MoEF by RO,
compliance pending
Tree Cutting
Proposal Description
Status
N.A.
N.A.
Length
Impacted
Current Stage
N.A.
N.A.
Issues/ Comments
N.A.
Railways (ROBs/ RUBs)
GAD Number
Status
Location/
Chainage
Current Stage
[GAD Number]
Proposal
Submitted,
Approval
pending
[Chainage]
Uploaded on portal
on [DD/MM/YYYY]
15
Issues/ Comments
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.6.4
Status of utilities shifting
Utility
Name
Category
Status
Length
affected
Department
Date of
Date when
Date of
Date of
Date of request
Progress Certification
Issue/C
Estimate was Approval by Deposit of
Estimate
by Authority for
of Physical from Agency
ommen
Received from
Authority super-vision
Amount
estimate
Shifting
for
ts
concerned dept.
RO/ HQ
charge
Completion
Water
[DD/MM/YYY [DD/MM/YY
Estimate [Length [DEPARTMENT]
[DD/MM/YYYY] [DD/MM/YYYY]
Not started TBD
Y]
YY]
Approved in km]
Electricity
[DD/MM/YYY [DD/MM/YY
Estimate [Length [DEPARTMENT]
[DD/MM/YYYY] [DD/MM/YYYY]
Not started TBD
Y]
YY]
Approved in km]
Others
[DD/MM/YYY [DD/MM/YY
Estimate [Length [DEPARTMENT]
[DD/MM/YYYY] [DD/MM/YYYY]
Y]
YY]
Approved in km]
1.7
TBD
Change of Scope
Date of first
submission to IE
S No.
Proposal Details
1
Construction of [Flyover Name] at
[Chainage]
2
Nallah diversion through
culvert at [Chainage]
box
Current Status
COS
Amount
Expected/ Actual Date of
Approval
[DD/MM/YYYY]
Approved in principle by Authority. Detailed
quantities in proper order yet to be submitted
[+/ Amount]
[DD/MM/YYYY]
[DD/MM/YYYY]
Clarifications
to
be
submitted
by
Concessionaire , expected date [DD/MM/YYYY]
[+/ Amount]
[DD/MM/YYYY]
16
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.8
No.
Mobilization of Resources
Equipment Name
Make
Model
Age of
Equipment
Planned/
Required
Quantity
Actual
Quantity
Excavator/Poclain
5
Paver
2
Transit Meter
0
Plate Compactors
0
[ADD OTHERS]
17
Deployed
During the
Month
Reason(s) for
Under/Over
Mobilization
Expected
Delay due to
UnderMobilization
(Months)
Remarks
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.9
1.9.1
Financial Progress Details
Pen Picture - Escrow
TPC (Cr)
Cumulative
inflow to Escrow
till previous
month (Cr)
Cumulative
outflow from
Escrow till
previous month
Inflow to Escrow
during the month
(Cr)
(Cr)
(Cr)
1,206
1,033
900
Outflow from
Escrow during
the month
30
35
Are the Escrow withdrawals in accordance with the order of withdrawal as specified in the Concession Agreement?
Tick as applicable
Yes
If not, details to be provided below:
18
No
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.9.2
Escrow details
TPC (Cr)
1,206
Cumulative exp.
till date (Cr)
1,033
(Cr)
Escrow Plan till
date- Equity
(BOT) (Cr)
Escrow Plan till
date- VGF (BOT)
(Cr)
Escrow Actual
till date- Debt
(BOT) (Cr)
Escrow Actual till
date- Equity (BOT)
(Cr)
Escrow
Actual till
date- VGF
(BOT) (Cr)
900
306
-
769
264
-
Escrow Plan till
date- Debt (BOT)
PLEASE EXCLUDE OUTSTANDING MOBILIZATION
FEE/ ADVANCE IN S-CURVE
19
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.10 Monitoring of Operations & Maintenance Obligations
1.10.1
Maintenance Status during Construction Phase
Expected Contents & Structure
Please write a summary of maintenance status in the current month, along with pending
items, issues and actions recommended using the following format.




1.10.2
Status of traffic worthiness and safety of project highway
Status of necessary repair and maintenance works
Compliance of other maintenance obligations as per contract
Key issues and recommended action by IE
Maintenance Status during Operations & Maintenance Phase (If Applicable)
Expected Contents & Structure
Please write a summary of maintenance status in the current month, along with pending
items, issues and actions recommended using the following format.





Status of maintenance of main carriageway, service road and paved shoulders.
Status of major maintenance
O&M of all communication, control & administrative systems
Compliance of maintenance obligations as per contract
Key issues and recommended action by IE
20
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.11 Pen Picture on safety features
Details to be provided after assessment of the site requirement vis-à-vis provisions in the Concession Agreement:
Location of Black Spots
Suggested Remedial Measures
within provisions of Concession
Agreement
Additional Remedial Measures
(if any)
Financial implications of additional
Remedial Measures for Authority
(Cr.)
21
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
1.12 Annex 1: Detailed List of Physical Components as per Schedule G
Component
Road works
including culverts,
minor bridges,
underpasses,
overpasses,
approaches to
ROB/RUB/ Major
Bridges/ Structures
(but excluding
service roads)
Physical Item
A- Widening and strengthening of existing road
(1) Earthwork up to top of the sub-grade
(2) Granular work (sub- base, base, shoulders)
(a) GSB
(b) WMM
(3) Shoulders
(4) Bituminous work
(a) DBM
(b) BC
(5) Rigid Pavement
Concrete work
(6) Widening and repair of culverts
(7) Widening and repair of minor bridges
B- New realignment/bypass
(1) Earthwork up to top of the sub-grade
(2) Granular work (sub- base, base, shoulders)
(a) GSB
(b) WMM
(3) Shoulders
(4) Bituminous work
(a) DBM
(b) BC
(5) Rigid Pavement
Concrete work
C- New culverts, minor bridges, underpasses, overpasses
on existing road, realignments, bypasses:
(1) Culverts
22
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
Component
Physical Item
(2) Minor bridges
(a) Foundation
(b) Sub-structure
(c) Super-structure (including crash barriers etc. complete)
(3) Cattle/Pedestrian underpasses
(a) Foundation
(b) Sub-structure
(c) Super-structure (including crash barriers etc. complete)
(4) Pedestrian overpasses
(a) Foundation
(b) Sub-structure
(c) Super-structure (including crash barriers etc. complete)
(5) Grade separated structures
(a) Underpasses
(i) Foundation
(ii) Sub-structure
complete)
(iii) Super-structure (including crash
barriers etc.
(b) Overpass
(i) Foundation
(ii) Sub-structure
complete)
(iii) Super-structure (including crash
barriers etc.
(c) Flyover
(i) Foundation
(ii) Sub-structure
complete)
(iii) Super-structure (including crash
(d) Foot over Bridge
Major Bridge
A- Widening and repairs of Major Bridges
23
barriers etc.
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
Component
works and
ROB/RUB
Physical Item
(1) Foundation
(a) Open Foundation
(b) Pile Foundation/Well Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
B- Widening and repair of
(a) ROB
(1) Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
(b) RUB
(1) Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
C- New Major Bridges
(1) Foundation
(a) Open Foundation
(b) Pile Foundation/Well Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
D- New rail-road bridges
(a) ROB
(1) Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
(b) RUB
(1) Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
24
ALL FIGURES & GRAPHS IN TEMPLATES ARE
ILLUSTRATIVE. PLEASE ADD ACTUAL DETAILS
Component
Structures
(elevated sections,
reinforced earth)
Physical Item
(1) Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
(4) Reinforced Earth Wall (includes Approaches of ROB,
Underpasses, Overpasses, Flyover etc.
Other Works
(i) Service roads/ Slip Roads
(ii) Toll Plaza
(iii) Road side drains
(iv) Road signs, markings, km stones, safety devices, ….
(a)Road signs, markings, km stones, ….
(b) Concrete Crash Barrier/ W-Beam Crash Barrier in
Road work
(v) Project facilities
(a) Bus bays
(b) Truck lay-byes
(c) Rest areas
(vi) Repairs to bridges/structures
(vii) Road side plantation
(viii) Protection works
(a) Boulder Pitching on slopes
(b) Toe/Retaining wall
(ix) Tunnel
(a) Excavation
(b) Construction of support system including rock
lining etc.
bolting,
(c) On complete completion of tunnel
(x) Miscellaneous
* The above list is illustrative and may require modification as per the actual scope of
the work
25