DOMAIN RESOURCES SDN BHD Doc Ref No : DRSB/CMP/F04 CONTRACTOR SUBMISSION ( CS ) Project Name : THE MAPLE OUG Main Contractor's Ref. No : DRSB/0872/WEP/M&E/NSC/1.3.5B/55 rev1 Sub-contractor's Ref. No : Received by Consultant/ Client's Rep: Sub-Contractor : Circuitry Electrical Engineering Sdn Bhd Domain Resources Sdn Bhd Main Contractor : Perunding WEPCO Sdn Bhd Signature: Signature: Signature: Name: Prabhim Nair Designation: PM Date: Name: Might Ng Designation: M&E Manager Date: Name: Mike Lau Designation: M&E Engineer Date: x□ No x□ No □ Yes □ Yes Sub-contractor's alternative proposal: Involve extra time/ cost under the contract: Subject : Electrical Systems x Attachment : □ Yes □ No Description : Material Approval Submission - Fire Rated Cables Note: This submission had previously been approved with comments. The Bomba certificates have been included to comply with the previous comments. Perunding WEPCO Sdn Bhd Party expected to reply: Expected reply date: 1. BoQ Reference ASAP Bid Item No. : CEE/WCTODSB/1539/14/10/20/P3 Contract Doc Ref. DRSB/0872/CEESB-LV/2.4.3A/ : NSC/004 Specification Ref. : 3.2 Location : T1, T2, T3 2. Product Details Fabricator/ Manufacturer: Supplier Southern Cable Southern Cable : SW Elektrik Sdn Bhd Country of Origin : Brand : Attachment: Malaysia □ x Catalogue/ Technical Sheet □ Warranty □ Job Ref. □ Shopdrawing/ Schema c x□ Cer □ Schedule □ Opera on and Maintenance Manual □ Test Report □ Info. from Manufacturer ficates of Compliance □ Reference Le er from Authori es: Sample to: □ Site □ Office 3. Purpose of Submission : □ For Review □ For Record Previous Ref (if any) : DRSB/0872/WEP/M&E/NSC/1.3.5B/55 □ For Endorsement □ For Ac on □ For Informa on x□ For Approval Approval/ Comment From Architect/ Consultant/ Client's Representative □ Approved □ Approved with comment □ Not Approved Comment(s): Name / Designation: cc: Consultants □ □ HQ □ □ QS Signature: □ □ Architect □ □ Client Date : □ □ C&S Engineer □ □ Landscape □ □ M&E Engineer *Tick left □ for copy with a achment & right □ without a achment Rev No.: 2 / Eff Date : 02122020