DATA CENTER CONSULTING & DESIGN CHECKLIST Customer: Address SN 1 Description Space Considerations (in sq.ft) a Office Space (Cubicle Space) b Office Space (Cabin Space) c Meeting Rooms d Conference Rooms Other Support Areas (Toilet/Pantry etc.) e 2 3 Equipment Space Data Processing Equipment a (Server room) b Meet Me Room d Staging Room g Telephone Equipment/LAN Room Storage Space Storage Room (Equipment/ a Accessories) b 4 Growth Space Considerations a IT application growth rate (%) per year b Staffing growth rate Future company / organization acquisitions c 5 6 Tape Storage Room Physical Security a 3 layers of physical security b 4 layers of physical security c 5 layers of physical security d 6 layers of physical security Mechanical Room a UPS/ Battery Room b Fire Protection Room Confidential Copy Site Address Bid submission date DC Build Starting date Completion date QTY Required Not Required Comments c 7 Access Paths to Computer Room b Minimum Clear ceiling height (False flooring to ceiling height) Clear path from loading dock to computer room c Independent access to each server hall a 8 Protection considerations a 9 10 a If vital records stored in computer room 2 hour fire rated walls (NFPA 75 article 7-2.1) b CtrlS recommendation 2 hour rating c Vapor barrier on walls Computer Room Concrete Floor b Floor sealed (vapor barrier & dust protection) Floor load rating (80 - 100 lb/ft2 or higher) c Floor drains (NFPA 75 article 3-3.2) Computer Room Raised Floor a b c d e f 12 Waterproofing b Pest Control Computer Room Walls Minimum 1 hour fire rating (NFPA 75 ) a 11 AHU Room Height (Minimum 18”) Panel type (high pressure laminate anti static ) Panel load rating (1,200 lbs. or higher concentrated load) Noncombustible Material Concrete filled panels (used in aisles with high rolling loads) g Stringer Vs Non stringer Bolted stringer Vs Non bolted (bolted preferred) h Cleaning procedure established Ramps and Handrails Ramp incline 1” rise per foot (12” a raised floor height = 12’ ramp length) Confidential Copy 13 14 15 16 b Ramp floor load rating (high rolling loads) c Rubber nonskid pads d Handrails for handicapped & safely Ceiling a 8’0” to 10" height- False Floor to False Ceiling b Dropped ceiling to be used? c Ducted air returns at PAHU/PAC d Serve ceiling as air return plenum e Direct hot aisle air return to PAHU/PAC Ambient Lighting a 400-500Lux b Parabolic light fixtures (reduce glare) c Lights out rooms to be used? d 10% emergency lighting to be used e Independent control at zone Acoustics/Insulation a Ceiling insulation b Flooring insulation c Acoustic wall covering d Area partitioning panels acoustic Fire Protection a FM200/NOVEC1230 b Manual disarm switch c 0/ 45 / 60 / 180 second delay to allow abort in case of false alarm d 17 e Water detection under raised floor Audible & visual alarm in room & at guard station f Fire Protection Abort switches g Hand held extinguishers h Fire Protection warning signs posted Dual Power Paths / Single Power Paths a Substation power inputs b Single phase and three phase required c UPS System required? d UPS Batteries (Sealed Vs non sealed) Confidential Copy e Automatic Transfer Switch f Power back up (DG Set) Diesel fuel storage tank size & time (ex. 12 hours) g h i EPO switches at principal exit doors 50 HZ Power Distribution Units (415 Volt) to be used j Grounding for safety (IS3043) 18 Air Conditioning / Chilled Water Optimal room temperature a 21 degrees C (+/- 2) Optimal room % of relative b humidity 50 (+/- 5) 19 Air Conditioning Capacity Needed 20 21 a Sensible heat load % (equipment) b CFM requirement (Precision AC) c d CFM requirement (Comfort AC) Redundancy level for server hall AC Unit e Condenser type (air, water, glycol) f g Condenser location & distance from DC Direct Expansion A/C or chilled water based ac for fan coil units h Type of humidification Emergency Procedures a Adequate emergency exits b Exits well marked c d Fire Protection signs posted (ex. “FM200/NOVEC1230. Total Flooding Sys in use”) Emergency evacuation procedures posted e Clear aisles to exits Earthquake Exposures High Center of gravity tethering a methods b 22 c Floating frames Bolted down frames transmit vibration directly into hardware d Check Local Codes Serviceability Confidential Copy a b c 23 24 Service clearances for service and floor loading Gates/Doors must open Allow for proper perimeter air circulation d Minimize the use of dead end aisles Building location (Clients scope/Vendors scope) a Approval from Civil authority b Approval from Water authority c Approval from Electrical authority d Approval from Fire authority Decisions Affecting Layout a b c d e f g h Building columns in DC Preferred cable path between floors or overhead Air Conditioners in server room or our side server room Power Distribution Units (PDU) at each row UPS in a room, Batteries in different room Power bus duct or cable duct Water lines to Air Conditioners dual or single Dual false ceilings (due to large void ) or single Data Center Components: CIVIL & INTERIORS WORKS Flooding and storm water Thermal Insulation on floor / PAC room areas Fire rated Partitions , Fire rated doors fixing works Construction validation for fire/load bearing/seismic Plumbing system Loading /unloading bay Raised Flooring works False Ceiling Painting & Finishing works Providing & fixing of furniture items (Eco friendly ) MECHANICAL - CHILLER & PRECISION AC Chiller Plants Confidential Copy Remarks Chilled water Piping Cooling Tower Water treatment plant PAHU AHU Ductable air handling units Comfort Air Conditioners Ducting work Fresh air & Pressurization system Ventilation system Water Pumping System ELECTRICAL - UPS & BATTERY SYSTEM UPS & Accessories Batteries & Accessories Battery management ELECTRICAL - PANELS & POWER DISTRIBUTION SYSTEM HT & LT substation Main Panels Cable tray - Power and data cable Cable laying DG Set Fuel storage and filling management AMF Panel/ PLC Panel / Synchronization Panel Electromagnetic interference level Emergency power off Transformer Earthing system Surge protection Raising Mains Power distribution Units Light fixtures & Wiring works FIRE DETECTION & SUPRESSION SYSTEM Fire alarm/detection system VESDA Fire suppression system Exhaust system (Fire smoke) SECURITY & BMS WORKS Public Address System Access Control CCTV WLD (water leakage detection) Visitor / employee entry/exit checking equipments Networking (Racks/cabinets/ structured cabling) Intruder system IBMS & system monitoring / Remote Monitoring Confidential Copy