Uploaded by DRAGONs

lab(4,5,6,7,8) SE

advertisement
LAB # 04:01.University System:
02.Bank System:
03.Customer_Order System
LAB # 05:Q1 Airport check-in and security screening business model
Q2 Restaurant business model
Q3 Ticket vending machine
Q4 e-Library online public access catalog (OPAC)
Q5 Online shopping use case diagrams
Q6 Website administration
Q7 Hospital Management
Q8. Radiology diagnostic reporting UML use case diagram
LAB # 06:Q1: Draw Sequence diagram of login operation.
Q2: Draw Sequence diagram of ATM processing.
Q3: Draw Sequence diagram of Hospital system
LAB # 07:Hospital Management System:
Bank Management System:
LAB # 08:HOSPITAL MANGMENT SYSTEM:EXERCISE NO#01 (The Sequence of Issues)
Firstly I design the project which is named as Hospital system using the platform of C# windows
Forms which are combining to form a desktop application.
Problem Issues:
(In Initial step create login page and sign up page for this project)
1st problem: Data failure because of repeated data which is illegal in Database.
2nd problem: Interconnections of joining two forms that is signs up and login page.
3rd problem: Connection established between database and .net framework.
4th problem: Exception errors in code, too complex to resolve due to bulk of code.
5th problem: Restrict users from entering specific form which is hidden.
6th problem: Billing calculations error is generating because of Boolean expressions.
7th problem: Communication failure in between developer and Customer.
8th problem: Interaction of UI Design which not attract customer to product.
EXERCISE NO#02 (Various Feasibility Areas)
Technical Feasibility:The technical feasibility is frequently the most difficult area encountered at this stage. It is essential
that the process of analysis and definition be conducted in parallel with an assessment to technical
feasibility. It centers on the existing computer system (hardware, software etc.) and to what extent
it can support the proposed system.
Economic or Financial Feasibility:Economic justification is generally the bottom line consideration for most systems. Economic
justification includes a broad range of concerns that includes cost benefit analysis. In this we
weight the cost and the benefits associated with the candidate system and if it suits the basic
purpose of the organization, the projects making to the analysis and design phase.
Legal Feasibility:This area investigates if the proposed system conflicts with legal requirements like data protection
acts or social media laws.
Operational Feasibility:In my project helps analyze and determine whether the business of gaming zone needs can be
fulfilled using the proposed solution or not. It helps to study if the business of gaming zone
problem is worth solving.
Scheduling Feasibility:I have fulfilled the scheduling Feasibility because I deliver and complete all work on time and the
customer were happy for my work.
EXERCISE NO#03 (Highlighting Its Strengths And Weaknesses)
This document outlines a feasibility study is to describe, according to a defined set of criteria, the
strengths and weaknesses of available methods of assessing the nature and scale of harm caused by the
health system. f the criteria to produce a summary of its key strengths and limitations
Download