B C ROUT At/Po-Gopalpur, PS-Rajnagar Dist-Kendrapara Odisha-754225 Mobile: 8638062562 / 9668784169 / 8368985013 CGEWHO Kendriya Vihar, Phase-III Paruthipet Avadi, Chennai Tamil Nadu-600054 Sub: Work to be carried out as per the below and followed by terms & conditions: Sl. No. Description Unit Qty. 1 Plumbing & Labour work per flat completety (uPVC Pipes, CPVC Pipes, Sanitary Fittings & CP fitting). Vertical and Internal Bathroom-Kitchen connections. All the materials & Fittings will be issued by company Flat 1 a. Type 1 Toilets b. Type 2 Toilets c. Type 3 Toilets d. Kitchen e. Utilite f. Two Balcony Connection 1 7250/- 1 7250/- 1 7250/- Each 1 3500/- Each 1 2500/- Set 1 2000/- Each Bath Conditions of Payment :a. Chase Cutting in walls for laying CPVC pipe % 30 b. Fixing of uPVC Pipe horizontal & brick holes % 20 c. Fixing of uPVC Pipeline vertical. % 25 d. Fixing of CPVC pipeline vertical % 10 f. Sanitary Ware % 8 e. Fixing of CP Fittings % 7 Page 1 of 2 Rate Per INR Remarks Terms & Conditions :1 2 3 4 5 6 7 8 9 10 11 12 Materials are readily available during working at site on every day, if materials are not available at site labour engaged on NMR basis, depending upon the availability fronts. Running Bill payment will be paid on every 15th days of the month. If there was any extra work done by us, the charges will be paid on present prevailing rates. Labour Huts with water & electricity will be supplied by company. Hospitalization of workers will be provided by company, if any mishappening on duty hours. Security Deposit will be released after communication testing. Safety equipments will be provided by company to worker and our representative and the contractor will be responsible for the safety of workers. Clearance of working area & scaffolding of such type of work will be provided by company. Sanitary wear, - All are have in ground floor of Building.(all tanks are have in terrace or fitting location). All Pipe line RCC holes should be done by company. Retention money 5% will be deducted from the bill. Supply Rate of Labour: Plumber 750/Helper 500/- Accepted By COMPANY NAME Contractor Signature Page 2 of 2