Note A2 A1 NK R. ANALISA R. ARSIP ANALISA R. ARSIP PRODUKSI A2A2 Cleaning alat produksi A1A1 R. STAF PRODUKSI NK MK8 MK MINYAK MK7 HD2 MK6 P1 P2 PA C2 B1 NK MK5 PS PK5 M1 HOIST BARANG M2 PK 4 HOIST BARANG MK4 M3 F1 L1 F2 L2 PK 3 S1 MK2 2ton P1 PK 2 MK3 P2 MK1 2ton PK 1 O1 Area Timbang Pintu gerbang NK NK Revision No Description Date App'd Rencana Jendela Cleaning alat produksi Reference R. STAF PRODUKSI General Contractors NK MK8 MK7 HD2 MK6 PA PS C2 PK5 B1 NK MK5 1200 M1 S1 Lokasi Ekspansi HD1 HOIS BARANG PK 4 MK4 NK PK 3 MK2 2ton PK 2 MK3 1200 M2 Project Name D1 HOIS BARANG C1 M3 Sheet Title P1 P2 PK 1 MK1 2ton Area Timbang O1 1000 Designed by Drawing by STEEL DOOR Checked by NK Approved by Scale Date 1 : 200 Sheet Number DEC 21'2012