REV.00 Light Power Density Calculations - FBMA - FAÇADE & LANDSCAPE AREA PROJECT: ABU DHABI LADIES CLUB‐ PHASE 2 ‐ PARKING & LANDSCAPE AREA LPD as per ASHRAE 90.1 (W/Sq.ft) LPD as per ASHRAE 90.1 (W/m2) Baseline Wattage (W) Uncovered Parking lots & Drives 0.15 1.61 2611.37 0.61 Uncovered Parking lots & Drives 0.15 1.61 1082.49 204 0.43 Uncovered Parking lots & Drives 0.15 1.61 772.51 630.85 408 0.65 Uncovered Parking lots & Drives 0.15 1.61 1018.48 17.8 1755.00 886 0.50 Uncovered Parking lots & Drives 0.15 1.61 1018.48 SN . Space Lighting Specification No. of Fittings Luminaire Wattage Total Watts 1 Elevation C ‐ Straight Road PL 19 51 969 10 22 1617.50 969 0.60 2 35 Car Parkings Road (elevation C) PL 8 51 408 10 15.3 670.50 408 3 Ambulance Parking Road (elevation C) PL 4 51 204 10 15.3 478.50 4 11 Admin parking Road (elevation D) PL 8 51 408 10 19.6 Main Entrance Road (Parking Road) (Elevation A) PL 16 51 816 5 10 BL 7 10 70 Lux Required Lux Achieved Total Area as per CIBSE Proposed Total Watts Total achieved LPD(W/m2) Space Classification as per ASHRAE 90.1 6 108 Car Parkings (Road 1) PL 7 51 357 10 15.8 1102.50 357 0.32 Uncovered Parking lots & Drives 0.15 1.61 1779.93 7 108 Car Parkings (Road 2 ) PL 5 51 255 10 8.12 351.50 255 0.73 Uncovered Parking lots & Drives 0.15 1.61 567.48 8 Paddle Tennis (Landscape Area) PL 7 51 357 5 8.13 3330.00 357 0.11 Plaza Area 0.20 2.15 7168.16 PL 2 51 102 SP 4 28 112 5 12.6 1295.50 294 0.23 Plaza Area 0.20 2.15 1018.48 BL 8 10 80 SP 3 28 84 ‐ ‐ 111.80 84 0.75 Plaza Area 0.20 2.15 240.66 SP 8 28 224 ‐ ‐ 235.00 224 0.95 Plaza Area 0.20 2.15 505.86 SP 3 28 84 ‐ ‐ 56.00 84 1.50 Plaza Area 0.20 2.15 120.55 9 10 11 12 Admin Entrance (Landscape Area) Plantation Area (Elevation A)(Spike light for Trees) Plantation Area (Elevation C)(Spike light for Trees) Plantation Area (Elevation D)(Spike light for Trees)