LPD PARKING 16122021

advertisement
REV.00
Light Power Density Calculations - FBMA - FAÇADE & LANDSCAPE AREA
PROJECT: ABU DHABI LADIES CLUB‐ PHASE 2 ‐ PARKING & LANDSCAPE AREA
LPD as per
ASHRAE 90.1
(W/Sq.ft)
LPD as per
ASHRAE 90.1
(W/m2)
Baseline Wattage
(W)
Uncovered Parking
lots & Drives
0.15
1.61
2611.37
0.61
Uncovered Parking
lots & Drives
0.15
1.61
1082.49
204
0.43
Uncovered Parking
lots & Drives
0.15
1.61
772.51
630.85
408
0.65
Uncovered Parking
lots & Drives
0.15
1.61
1018.48
17.8
1755.00
886
0.50
Uncovered Parking
lots & Drives
0.15
1.61
1018.48
SN
.
Space
Lighting
Specification
No. of Fittings
Luminaire
Wattage
Total Watts
1
Elevation C ‐ Straight
Road
PL
19
51
969
10
22
1617.50
969
0.60
2
35 Car Parkings Road
(elevation C)
PL
8
51
408
10
15.3
670.50
408
3
Ambulance Parking
Road (elevation C)
PL
4
51
204
10
15.3
478.50
4
11 Admin parking
Road (elevation D)
PL
8
51
408
10
19.6
Main Entrance Road
(Parking Road)
(Elevation A)
PL
16
51
816
5
10
BL
7
10
70
Lux Required
Lux Achieved Total Area
as per CIBSE
Proposed
Total Watts
Total achieved
LPD(W/m2) Space Classification
as per ASHRAE 90.1
6
108 Car Parkings
(Road 1)
PL
7
51
357
10
15.8
1102.50
357
0.32
Uncovered Parking
lots & Drives
0.15
1.61
1779.93
7
108 Car Parkings
(Road 2 )
PL
5
51
255
10
8.12
351.50
255
0.73
Uncovered Parking
lots & Drives
0.15
1.61
567.48
8
Paddle Tennis
(Landscape Area)
PL
7
51
357
5
8.13
3330.00
357
0.11
Plaza Area
0.20
2.15
7168.16
PL
2
51
102
SP
4
28
112
5
12.6
1295.50
294
0.23
Plaza Area
0.20
2.15
1018.48
BL
8
10
80
SP
3
28
84
‐
‐
111.80
84
0.75
Plaza Area
0.20
2.15
240.66
SP
8
28
224
‐
‐
235.00
224
0.95
Plaza Area
0.20
2.15
505.86
SP
3
28
84
‐
‐
56.00
84
1.50
Plaza Area
0.20
2.15
120.55
9
10
11
12
Admin Entrance
(Landscape Area)
Plantation Area
(Elevation A)(Spike
light for Trees)
Plantation Area
(Elevation C)(Spike
light for Trees)
Plantation Area
(Elevation D)(Spike
light for Trees)