SHARATH TECHNOLOGY Format No. Contingency Plan Labour : For all the machines alternate Employee has been identified. In case of emergency alternate employee is deployed. Employees Names: 1) 2) 3) Dies : Dies and Rollers Additional Quantity of one number tool is always maintained in all the types. Process : For each operation one machine is available. In case of problem alternate source is identified outside. Power : At present, we are fully dependent on KPTCL power supply. There is no much power interruption now a days. However we have install one generator set. Maintenance : Monthly maintenance is carried out to upkeep of machines. In emergency breakdown like Electrical & Mechanical external agency is identified. 1) Logistics : We have one vehicle of our own for regular supply of item all . In case of urgency alternate vehicle is identified. Sometimes our personnel vehicle will be used. Material : We have more than one source for all the materials. If material is not available with our regular dealer some other source will be found out. Next alternate is to approach our customer to arrange the material through some other source (Supplier). Issue No. 01 Revision No. Date 01.01.16 Date 00 Prepared by Approved by