ID Duration Start Finish Start Variance Successors 3 days 11/17/21 8:00 AM 11/20/21 5:00 PM 0 days 4SS,11,12 1 day 11/17/21 8:00 AM 11/17/21 5:00 PM 0 days 4 Receive notice to proceed and sig n contract Prepare and submit project sched ule Obtain the approved design 1 day 11/20/21 8:00 AM 11/20/21 5:00 PM 0 days 5SS 5 Obtain preliminary shop drawings 1 day 11/20/21 8:00 AM 11/20/21 5:00 PM 0 days 8 8 Submit shop drawings and order l ong lead items - casing Set up site office 1 day 11/21/21 8:00 AM 11/21/21 5:00 PM 0 days 1 day 11/21/21 8:00 AM 11/21/21 5:00 PM 0 days 14 1 day 11/21/21 8:00 AM 11/21/21 5:00 PM 0 days 9 11 Submit shop drawings and order l ong lead items - steel Install temporary power 1 day 11/21/21 8:00 AM 11/21/21 5:00 PM 0 days 13SS 12 Install temporary water service 1 day 11/21/21 8:00 AM 11/21/21 5:00 PM 0 days 13SS 16 Mobilize machinery - set number 01 Stone site access and temporary parking area Set line and grade benchmarks 4 days 11/22/21 8:00 AM 11/25/21 5:00 PM 0 days 28 2 days 11/22/21 8:00 AM 11/23/21 5:00 PM 0 days 22 1 day 11/22/21 8:00 AM 11/22/21 5:00 PM 0 days 1 day 11/22/21 8:00 AM 11/22/21 5:00 PM 0 days 2 days 11/22/21 8:00 AM 11/23/21 5:00 PM 0 days 21SS 1 day 11/22/21 8:00 AM 11/22/21 5:00 PM 0 days 21SS 2 days 11/24/21 8:00 AM 11/25/21 5:00 PM 0 days 23,24 Install casing, drilling and casting non working test Check storm drainage, dewaterin g and re-install and shifting Install exterior fire line and buildin g fire riser Perform final site grading 24 days 11/27/21 8:00 AM 12/23/21 5:00 PM 0 days 29 2 days 11/27/21 8:00 AM 11/28/21 5:00 PM 0 days 25FF+1 day 1 day 11/27/21 8:00 AM 11/27/21 5:00 PM 0 days 25 1 day 11/29/21 8:00 AM 11/29/21 5:00 PM 0 days 26 Erect building batter boards and l ayout building Mobilize machinery - set number 02 Install casing, drilling, steel install ation, pouring and cleaning Loading working test 2 days 11/30/21 8:00 AM 12/1/21 5:00 PM 0 days 4 days 12/13/21 8:00 AM 12/16/21 5:00 PM 0 days 70 days 12/25/21 8:00 AM 3/15/22 5:00 PM 0 days 30SS+7 days 70 days 1/2/22 8:00 AM 3/23/22 5:00 PM 0 days 32,33,34,35 Mobilize machinery - set number 03 Complete all tests inspection certif ication Complete punch list items from all inspections Obtain certificate of occupancy 4 days 1/10/22 8:00 AM 1/13/22 5:00 PM 0 days 1 day 3/24/22 8:00 AM 3/24/22 5:00 PM 0 days 1 day 3/24/22 8:00 AM 3/24/22 5:00 PM 0 days 1 day 3/24/22 8:00 AM 3/24/22 5:00 PM 0 days Issue final completion document s including warranties Demobilization of machinery, stu ff and tools - Contract Closure 1 day 3/24/22 8:00 AM 3/24/22 5:00 PM 0 days 1 day 3/26/22 8:00 AM 3/26/22 5:00 PM 0 days 2 3 13 7 21 14 9 15 20 22 28 23 24 25 26 17 29 30 18 32 33 34 35 36 Risk Task Name fabrication details - purchasing or ders (steel - casing) Prepare site - lay down yard, benc h mark and safety lines Plat form check, leveling, clearanc e and entrance Rough grade site (cut and fill) 36 ID ======== ======== Risk Task Name ============== ========================== ============== ==== Duration Start Finish Start Variance Successors ============ ============ 111 days ================= ============= 11/17/21 8:00 AM ================= ============= 3/26/22 5:00 PM ================= ============= 0 days ==================== ==========