Basic Quality Training Material Rio Yudha Prawira QA Asst. Manager Quality Assurance (Astemo) IDBB September 23rd, 2021 CONFIDENTIAL Contents 1. Quality Awareness 2. Basic Action & Rules 3. Pentingnya Mutu 3. In-process Defect (Customer Line Claim & Internal Reject). 4. Outgoing, Process & Incoming Quality Control. 5. SQM Activity. 6. New Development/Engineering Change Control. 7. Others. CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 2 1. Quality Awareness Kualitas (Mutu) adalah: “Setiap karakteristik (fitur) dari produk yang sesuai dengan keinginan pelanggan atau sesuai dengan tujuan penggunaan dari produk tersebut” Produk yang berkualitas adalah produk yang: 1. Sesuai dengan keinginan pelanggan 2. Dapat digunakan sesuai dengan fungsinya 3. Sesuai dengan spesifikasi produk yang telah ditetapkan Salah satu contoh spesifikasi produk adalah Drawing CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 3 1. Quality Awareness Kebijakan Mutu Hitachi Astemo CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 4 1. Quality Awareness Prinsip “Quality First” Hitachi Pahami sudut pandang pelanggan. Pelanggan adalah yang utama. Kualitas adalah prioritas utama. Jangan mengabaikan kualitas demi pengiriman ataupun biaya. Penjaminan melalui pengujian dan verifikasi yang empiris Perhitungan, trial produksi dan pengujian sangatlah penting. Buat keputusan berdasarkan prinsip 5-Gen. Prinsip 5-Gen: Genba (Lokasi), Genbutsu (Objek Aktual), Genjitsu (Kondisi Aktual), Genri (Prinsip) dan Gensoku (Aturan) CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 5 1. Quality Awareness Panduan dalam bertindak Tempatkan diri Anda sebagai pelanggan. ⇒ Bertindaklah seolah-olah Andalah pelanggannya. Jangan menutupi kesalahan. ⇒ Ungkapkan yang sebenarnya. Jangan berkompromi demi pengiriman dan penghematan biaya. ⇒ Kuaitas harus jadi yang utama. Mulailah dengan kecurigaan, jangan dengan kepercayaan. ⇒ Kebenaran terkadang tersembunyi. Berinisiatiflah untuk introspeksi diri. ⇒ Bebas, bertanggung jawab dan saling membantu. CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 6 1. Quality Awareness Mengapa mutu adalah prioritas utama? Penambahan Biaya - Kompensasi untuk pelanggan - Biaya pengiriman, biaya rework, scrap, dan lain-lain Kualitas Buruk Kehilangan Kepercayaan Pelanggan - Reputasi yang baik akan dibicarakan 5 orang, reputasi yang buruk akan disebarkan ke 10 orang Ketidaknyamanan/Ketidakamanan bagi Pelanggan - Kualitas yang buruk dapat menyebabkan ketidaknyamanan bahkan mengancam keselamatan pelanggan CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 7 2. Basic Actions & Rules • • • • • HORENSO: Lapor, Komunikasi dan Konsultasi Kontrol 5S control dan 3T Standard Operasi Pengendalian Produk Tidak Sesuai Penanganan Abnormality CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 8 2. Basic Actions & Rules (HORENSO: Lapor, Komunikasi dan Konsultasi) (HORENSO) adalah sederet Tindakan “pelaporan (Hokoku)”, “komunikasi (Renraku)” dan “konsultasi (Sodan)” yang sangat penting dalam bekerja. <Pelaporan> Bawahan harus melaporkan setiap progress atau hasil kerja kepada atasan sesuai dengan yang diinstruksikan. <Komunikasi> Setiap informasi harus disampaikan kepada atasan dan bawahan. Informasi yang disampaikan tidak boleh berdasarkan opini pribadi atau perkiraan pribadi. <Konsultasi> Lakukan konsultasi dengan atasan, senior, dan rekan kerja untuk mendapatkan saran atau referensi dalam mengambil keputusan. CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 9 2. Basic Actions & Rules Jangan Lakukan やってはいけないこと (Manajemen 5S) 1S: Seiri (Ringkas) 1S: Pisahkan barang yang dibutuhkan dengan yang tidak dibutuhkan. Singkirkan barang yang tidak dibutuhkan. * Jangan membawa apapun yang tidak dibutuhkan. Lakukan 正しい作業 Aktivitas Ringkas dapat dilakukan untuk area kerja, aktivitas dan informasi. Buang 廃却箱 Apa要るものは? yang dibutuhkan? Dibutuhkan 要るもの Tidak Dibutuhkan 要らない物 CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 10 2. Basic Actions & Rules Jangan Lakukan やってはいけないこと (Manajemen 5S) Spanner スパナ 2S: Seiton (Rapi) Screw driver ドライバー Pipe wrench パイプレンチ ハンマー Hammer 2S: Susun barang yang diperlukan dan beri label agar orang lain dapat mengetahui dan melihat lokasi penyimpanannya. Pipe wrench パイプレンチ プライヤー Pliers Hammer ハンマー Pliers プライヤー Screw driver ドライバー パイプレンチ Pipe wrench Hammer ハンマー Screw driver ドライバー * Jangan meninggalkan barang secara sembarangan setelah digunakan Lakukan 正しい作業 Spanner スパナ Spanner スパナ Pliers プライヤー Pemberian label sangat penting untuk aktivitas “Seiton” karena orang sering lupa atau tidak tahu lokasi penyimpanannya. Diperlukan 要るもの CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 11 2. Basic Actions & Rules (Manajemen 5S) Jangan Lakukan やってはいけないこと 3S: Seisou (Resik) 3S: Bersihkan dan jaga kebersihan lingkungan * Jangan biarkan barang atau lingkungan dalam kondisi kotor Lakukan 正しい作業 Barang dan lingkungan kerja harus dalam kondisi bersih. CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 12 2. Basic Actions & Rules Jangan Lakukan やってはいけないこと (Manajemen 5S) Spanner スパナ ドライバー Pipe wrench パイプレンチ 4S: Seiketsu (Rawat) Hammer ハンマー 4S: Jaga kebersihan lingkungan dengan melakukan Ringkas, Rapi dan Resik. プライヤー * Jangan mengabaikan 3S Lakukan 正しい作業 Spanner スパナ Screw driver ドライバー 3S harus dilakukan secara terus menerus untuk menjaga lingkungan yang bersih. Pipe wrench パイプレンチ Hammer ハンマー Pliers プライヤー CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 13 2. Basic Actions & Rules Jangan Lakukan やってはいけないこと (Manajemen 5S) 5S: Shitsuke (Rajin) 5S: Ikutilah aturan Lakukan 正しい作業 スパナ Spanner * Jangan mengabaikan aturan ドライバー Screw driver Selalu ikuti aturan kerja dan jagalah kedisiplinan. Pipe wrench パイプレンチ ハンマー Hammer Pliers プライヤー Cleaning Check Sheet for **** (MM/YYYY) ○○年○月度・清掃活動チェ ックシート Checked Facility by 設備 担当 12345 1 A ○ ○ 2 B ○ ○ 3 C ○ ○ Note 備考 CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 14 2. Basic Actions & Rules Jangan Lakukan やってはいけないこと (Manajemen 3T) Teii: Dimana (Tentukan lokasi) • Taruh barang di tempat yang telah ditentukan. • Jangan meninggalkan barang dalam kondisi berantakan Lakukan 正しい作業 The first tray of Cabinet A Aの1段目 CONFIDENTIAL Jika lokasi penyimpanan tidak ditentukan, orang akan menyimpan barang secara sembarangan. Sangat penting untuk menentukan lokasi penyimpanan barang. © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 15 2. Basic Actions & Rules Jangan Lakukan やってはいけないこと (Manajemen 3T) Teihin: Apa (Tentukan barang apa yang harus disimpan) • Tentukan barang yang harus disimpan Lakukan 正しい作業 • Jangan mengganti barang yang disimpan tanpa izin. Orang akan bingung jika ada barang yang diletakkan tidak pada tempatnya. CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 16 2. Basic Actions & Rules Jangan Lakukan やってはいけないこと (Manajemen 3T) Teiryo: Seberapa banyak (Tentukan jumlah yang seharusnya) • Tentukan jumlah kebutuhan untuk setiap barang • Jangan menyimpan barang lebih dari yang dibutuhkan. Lakukan 正しい作業 Penting untuk menetapkan dan menjaga jumlah yang cukup untuk setiap barang. CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 17 2. Basic Actions & Rules (Standard operasi) Standard operaasi adalah dokumen yang menentukan “cycle time”, “urutan kerja” dan “standard jumlah pekerjaan dalam suatu proses” yang mengkombinasikan manusia, barang, dan peralatan untuk mendapatkan hasil yang diinginkan. Tiga elemen 1. Cycle time Menentukan waktu (**m **s) untuk menghasilkan satu piece (lot) produk. 2. Urutan kerja Urutan atau tahapan pekerjaan yang paling efisien. 3. Standard jumlah pekerjaan dalam suatu proses Standard minimum jumlah pekerjaan yang harus dilakukan dalam satu proses. CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 18 2. Basic Actions & Rules mes/día Cont revisión Elaboró Aprobó Jangan Lakukan やってはいけないこと (Standard operasi) なぜ・・・ Mengapa? Untuk 異品・欠品・ mengcegah kesalahan 加工ミス防止 proses Jangan menghentikan pekerjaan di pertengahan cycle の為! Hey. オーイ Ya? ハーイ JK-203 JK-203 JK-203 * Selesaikan satu cycle pekerjaan. * Jangan tinggalkan area kerja di tengah-tengah proses. Lakukan 正しい作業 One cycle 1サイクル Ya? 何ですか? Hey. オーイ Tinggalkan area 1 kerja サイクル終了後に setelah 離れる。 selesai satu cycle Aku selesaikan 1サイクル dulu pekerjaan 終わるまで ini JK-203 JK-203 JK-203 CONFIDENTIAL Standard operation sheets specify the scope of work in terms of worker’s motion. 1. Takt time for repeated work 2. Standard number of works in process 3. Quality check items 4. Safety cautions © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 19 2. Customer Notification & External Defect (Warranty Claim). 2.1. Customer – Quality Delivery Assessment. Based on AHM evaluation: 1. EPS (Evaluasi Performa Supplier – AHM Procurement) 2. GQI (Global Quality Index – HONDA Global Quality) Month Apr May EPS EXCEL GQI EXCEL Jun Jul Aug Sep Level : Excellent, Good, Fair, Poor Level : Excellent, Good, Fair, Poor Oct Nov Dec Jan Feb Mar 2.2. External Defect – Warranty Claim Data (End User Claim). 1HFY21 Budget Apr Sale Amount 36.332 51.053 51.053 QTY - 0 0 Paid Amount 2 0 0 Ratio 0,005 0,00% 0,00% May Jun CONFIDENTIAL Jul Aug Sep 1HFY21 Actual © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 20 3. In-process Defect (Customer Line Claim) Model Apr-21 May-21 K59J 45.600 K0JA 4.800 K60R 50.500 Jun-21 Jul-21 Aug-21 Sep-21 AHM Pt. 3 Delivery AHM Pt. 4 Claim K59J 0 K0JA 0 K60R 0 PPM 0 PPM Target 10 PICA/CAR Date Model Qty Symptom Status Issue Date CONFIDENTIAL PICA/CAR No. © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 21 3. In-process Defect (Internal Reject) 3.1. Pareto of Internal Reject 12 180 97% 11 243 87% 10 306 9 370 78% 8 433 68% 7 496 58% 6 559 Period: April 1st – 30th , 2021 Issued Date: May 20th , 2021 Issued by: Rio Yudha Prawira 5 622 4 685 3 748 2 811 49% 39% 29% 19% 1 874 10% 937 0% 0 Seal Piston Cylinder Seal Wiper Cylinder Finish Finish (MC) (CALIPER) Bleeder Lever Boot Stop Ring MASTER Bolt Torx CYLINDER ASSY (KOIKE) Bolt O-ring Level Washer Insulator Level Indicator Others 3.2. Top 3 of Scrapped Parts No. Part Name 1 Seal Piston 2 Cylinder Finish (CALIPER) 3 Seal Wiper Qty Amount 1.391 1.681.719 24 1.306.272 1.392 861.648 CONFIDENTIAL Reason for Scrap © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 22 4. Outgoing, Process & Incoming Quality Control. 4.1. Outgoing Inspection. Apr-21 Production Lot 1229 Accepted Lot 1227 Accepted Lot Percentage No. 1 Problem May-21 Jun-21 Jul-21 Aug-21 Sep-21 99.8% Picture Current Activity Countermeasure Plan Due Date Peel off on Body M/C and Body Caliper CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 23 4. Outgoing, Process & Incoming Quality Control. 4.2. Process QC Data (% Rejection). Model Process MASTER K59J CALIPER SYSTEM MASTER K0JA CALIPER SYSTEM MASTER K2FF CALIPER SYSTEM Line Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 24 4. Outgoing, Process & Incoming Quality Control. Model Process Station Problem MASTER K59J CALIPER SYSTEM MASTER K0JA CALIPER SYSTEM MASTER K2FF CALIPER SYSTEM CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 25 4. Outgoing, Process & Incoming Quality Control. 4.3. Incoming Inspection. Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Delivered Qty Rejected Qty PPM PPM Target No. Occurred Date Supplier Name Part CONFIDENTIAL Problem Temporary Action © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 26 4. Outgoing, Process & Incoming Quality Control. 4.4. Problem and Countermeasure Follow Up CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 27 4. Outgoing, Process & Incoming Quality Control. 4.5. Returned Material Approval (RMA). RMA ( Return Material Approval ) FY20 Payment Status FY 2019 April-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Des-20 Jan-21 TOTAL Total RMA IDR 85,624,728 IDR - IDR - IDR - IDR 386,295 IDR 29,395,413 IDR 14,549,455 IDR 4,662,493 IDR 33,232,022 IDR 584,622 IDR 781,990 IDR 169,217,018 Paid IDR 84,329,912 IDR - IDR - IDR - IDR 386,295 IDR 29,395,413 IDR 14,549,455 IDR 4,662,493 IDR 6,577,907 IDR - IDR - IDR 139,901,475 Out standing IDR 1,294,816 IDR - IDR - IDR - IDR - IDR - IDR - IDR - IDR 26,654,115 IDR 584,622 IDR 781,990 IDR 29,315,543 Remark RMA ( RETURN MATERIAL APPROVAL ) FY20 IDR 139 901 475 IDR 160 000 000 IDR 169 217 018 IDR 85 624 728 IDR 140 000 000 IDR 84 329 912 IDR 120 000 000 IDR 100 000 000 IDR 26 654 115 IDR 29 395 413 IDR 80 000 000 IDR 14 549 455 IDR 4 662 493 IDR 29 395 413 IDR 14 549 455 IDR 1 294 816 IDR 60 000 000 IDR 781 990 IDR 386 295 IDR 40 000 000 IDR 6 577 907 IDR 4 662 493 IDR 386 295 IDR 20 000 000 IDR IDR - IDR - - IDR IDR - IDR - - April-20 May-20 IDR -IDR - IDR - IDR 29 315 543 IDR 33 232 022 IDR 584 622 IDR IDR - IDR 781 990 IDR 584 622 IDR - IDR - IDR - IDR - Des-20 Jan-21 IDR FY 2019 Jun-20 Jul-20 Total RMA Aug-20 Paid CONFIDENTIAL Sep-20 Oct-20 Nov-20 TOTAL Out standing © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 28 4. Outgoing, Process & Incoming Quality Control. 4.6. Returned Material Approval (RMA). RMA List FY20 Action Month Sep-19 Supplier Hitachi Asia GW Part Name Master Cylinder Finish Problem QA SUPPLIER APPROVAL QI Dimension 27 mm IQC-QI-09& 34 mm Out of 19-002 Spec. Qty Unit price (IDR) Scrap , Man Power , Tool , Material Detail action Man Power Sorting Cost 608 Hour 40463/Hour Man Power Re use Cost 16 Hour 40463/Hour IDR 647,408.00 Tool Jig Inspection 20 Pcs 50000/Pcs IDR 1,000,000.00 Tool Dies Special Bolt Lever 1 Units Material Material Issue date Bolt Lever After used 1912 Pcs Nut Flange After used 1912 Pcs Hitachi Asia GW Master Cylinder Finish Painting Contamination Hitachi Asia GW Master Cylinder Finish Thread NG Hitachi Asia GW Master Cylinder Finish Dented Grade A Hitachi Asia GW Caliper Cylinder Finish Dented Grade A Feb-20 IQC-QI-0220-003 GW Check Actual Part ( Refer To Inventory List Holding Part GW FEBRUARY2020 ) PIC / Supplier DN/HIAM 23-Oct-20 23-Dec-20 S/20/014 CLOSE GW 17-Sep-20 6-Oct-20 DN/HIAM 23-Oct-20 23-Dec-20 S/20/014 CLOSE GW 17-Sep-20 6-Oct-20 DN/HIAM 23-Oct-20 23-Dec-20 S/20/014 CLOSE GW 35000000 IDR 17-Sep-20 35,000,000.00 6-Oct-20 DN/HIAM S/20/014- 23-Oct-20 23-Dec-20 1 CLOSE GW 2280/Pcs IDR 4,359,360.00 17-Sep-20 6-Oct-20 DN/HIAM 23-Oct-20 23-Dec-20 S/20/014 CLOSE GW 163/Pcs IDR 311,656.00 17-Sep-20 6-Oct-20 DN/HIAM 23-Oct-20 23-Dec-20 S/20/014 CLOSE GW IDR 17-Sep-20 65,919,928.00 6-Oct-20 CLOSE GW 1-Oct-20 CLOSE GW DN/HIAM 29-Apr-20 30-Sep-20 S/20/006 CLOSE GW 1-Oct-20 CLOSE GW IDR 27-Mar-20 11,005,936.00 DN/HIAM 31-Mar-20 S/20/006- 14-Jul-20 1 Rev.1 Man Power Sorting Cost 272 Hour 40463/Hour Material Scrap 3 Pcs 106.39 THB / Pcs ฿ 319.17 27-Mar-20 31-Mar-20 Man Power Repair Cost 48 Hour 40463/Hour IDR 1,942,224.00 27-Mar-20 DN/HIAM 31-Mar-20 S/20/006- 14-Jul-20 1 Rev.1 Material Scrap 14 Pcs 106.39 THB / Pcs ฿ 1,489.46 27-Mar-20 31-Mar-20 DN/HIAM 29-Apr-20 30-Sep-20 S/20/006 CLOSE GW Material Scrap 57 Pcs 106.39 THB / Pcs ฿ 6,064.23 27-Mar-20 31-Mar-20 DN/HIAM 29-Apr-20 30-Sep-20 S/20/006 CLOSE GW Material Scrap 14 Pcs 118,13 THB / Pcs ฿ 1,653.82 27-Mar-20 31-Mar-20 DN/HIAM 29-Apr-20 30-Sep-20 S/20/006 CLOSE GW Master Cylinder Diameter 6 Out of IQC-QI-12Finish Spec 19-002_R1 Hitachi Asia GW IDR 17-Sep-20 24,601,504.00 Approval date Invoice NO Issue Date Status Payment Date 6-Oct-20 Total Dec-19 ISSUE DEBIT NOTE Amount (IDR) CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 29 4. Outgoing, Process & Incoming Quality Control. 4.6. Returned Material Approval (RMA). Action Month Mar-20 Jul-20 Supplier Part Name Problem QA SUPPLIER APPROVAL QI IQC-QIL-0320-001 Nichirin Hosebrake Hose end Mixing Hitachi Asia GW Master Cylinder Finish Diameter 6 Out of IQC-QI-03Spec. ( Lot T23 & 20-002 T2Q ) Nichirin Hosebrake Hose end Mixing IQC-QIL-0720-006 Unit price (IDR) Qty Holder Cable Painting Fade Holder Cable Luntur IQC-QIL-08( Finish Good ) 20-005 15-Sep-20 CLOSE NICHRIN DN/HIAM 10-Sep-20 S/20/010 30-Sep-20 CLOSE BMT 9-Sep-20 DN/HIAM 10-Sep-20 S/20/010 30-Sep-20 CLOSE BMT 3-Sep-20 9-Sep-20 DN/HIAM 10-Sep-20 S/20/010 30-Sep-20 CLOSE BMT IDR 7,197,542.00 3-Sep-20 9-Sep-20 DN/HIAM 10-Sep-20 S/20/010 30-Sep-20 CLOSE BMT IDR 187,264.00 3-Sep-20 9-Sep-20 DN/HIAM 10-Sep-20 S/20/010 30-Sep-20 CLOSE BMT IDR 7,992,806.00 3-Sep-20 9-Sep-20 CLOSE BMT IDR 2,424,543.00 1-Oct-20 2-Oct-20 DN/HIAM 23-Oct-20 S/20/012 9-Nov-20 CLOSE WATANA BE IDR 1,157,004.00 11-Mar-20 12-Mar-20 DN/HIAM 12-Jun-20 S/20/008 Man Power Sorting base on Lot Machining 32 Hour 40463/Hour IDR 1,294,816.00 1-Jul-20 16-Sep-20 DN/HIAM 18-Sep-20 S/20/011 Material Scrap 1 Pcs 386295/Pcs IDR 386,295.00 22-Jul-20 7-Aug-20 DN/HIAM 10-Aug-20 S/20/009 Dismatle Cost 95 Pcs 1000/Pcs IDR 95,000.00 3-Sep-20 9-Sep-20 Ressy Cost 95 Pcs 1000/Pcs IDR 95,000.00 3-Sep-20 Dismatle Cost 418 Pcs 1000/Pcs IDR 418,000.00 Assy Procces 418 Pcs 17219/Pcs Bolt torx 418 Pcs 448/Pcs Sorting Cost 59.92 Hour 40463/Hour Material NG Part + From AQL Check Material Finish Good Approval date Invoice NO Issue Date Payment Date 15-Jul-20 DN/HIAMS/20/010 9496 Pcs 634/Pcs IDR 6,020,464.00 1-Oct-20 2-Oct-20 DN/HIAM 23-Oct-20 S/20/012 9-Nov-20 CLOSE WATANA BE 5600 Pcs 727/Pcs IDR 4,071,200.00 1-Oct-20 2-Oct-20 DN/HIAM 23-Oct-20 S/20/012 9-Nov-20 CLOSE WATANA BE 6000 Pcs 686/Pcs IDR 4,116,000.00 1-Oct-20 2-Oct-20 DN/HIAM 23-Oct-20 S/20/012 9-Nov-20 CLOSE WATANA BE 3600 Pcs 614/Pcs IDR 2,210,400.00 1-Oct-20 2-Oct-20 DN/HIAM 23-Oct-20 S/20/012 9-Nov-20 CLOSE WATANA BE 4000 Pcs 640/Pcs IDR 2,560,000.00 1-Oct-20 2-Oct-20 DN/HIAM 23-Oct-20 S/20/012 9-Nov-20 CLOSE WATANA BE IDR 21,402,607.00 1-Oct-20 2-Oct-20 DN/HIAMS/20/012 9-Nov-20 CLOSE WATANA BE Total Holder Cable GW 385668/Pcs Aug-20 BMT CLOSE 3 Pcs IQC-QIL-0820-05 IQC-QIL-0820-003 NICHRIN Scrap Man power O Ring Broken CLOSE Material Issue date Total O Ring Level PIC / Supplier Detail action Material Watanabe Rubber Status Scrap , Man Power , Tool , Material Man Power BMT ISSUE DEBIT NOTE Amount (IDR) Pending : BMTIDRLooking another methode for rework discuss 307256/Pcs 116,450,024.00 with PT Nippon Paint 379 Pcs CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. BMT 30 4. Outgoing, Process & Incoming Quality Control. 4.6. Returned Material Approval (RMA). Action Month Supplier Part Name Problem Burr Inside ID Hitachi Master Asia Cylinder GW Finish QA SUPPLIER APPROVAL QI IQC-QI-0820-001 R1 & IQC-QI09-20-002 R1 Qty Issue date Man Power Sorting Cost 278 IDR 40463/Hour 1-Oct-20 Hour 11,248,714.00 Tool Sub Material : Flashlight 4 Pcs 20000/Pcs IDR 80,000.00 1-Oct-20 Tool Sub Material : Batery A3 42 Pcs 3750/Pcs IDR 157,500.00 1-Oct-20 Man Power Repair Cost 12 40463/Hour Hour IDR 485,556.00 26-Oct-20 Tool Special Jig For Repair 3 Pcs 200000/Pcs IDR 600,000.00 26-Oct-20 Material Master Cyl Finish : Casting Problem 25 Pcs 49914/Pcs (1D ) Oct-20 BMT Cap Reservoir Peel off IQC-QIL-1020-003 IDR 26-Oct-20 1,247,850.00 IDR 26-Oct-20 13,819,620.00 Approval date GW 17-Nov29-Jan-21 CLOSE 20 GW 17-Nov29-Jan-21 CLOSE 20 GW 17-Nov29-Jan-21 CLOSE 20 GW 17-Nov29-Jan-21 CLOSE 20 GW 17-Nov29-Jan-21 CLOSE 20 GW 5-Nov-20 DN/HIAMS/20/017 29-Jan-21 CLOSE GW 5-Oct 5-Oct Sorting Cost 16 Hour 40463/Hour IDR 647,408.00 26-Oct 28-Oct Screw Flat 1764 Pcs 98/Pcs IDR 172,872.00 26-Oct 28-Oct 26-Oct 28-Oct Man Power Material Total CONFIDENTIAL IDR 820,280.00 PIC / Supplier 17-Nov29-Jan-21 CLOSE 20 IDR 729,835.00 Caliper Assy Invoice Payment Issue Date NO Date DN/HIA 6-Oct-20 MS/20/0 17 DN/HIA 6-Oct-20 MS/20/0 17 DN/HIA 6-Oct-20 MS/20/0 17 DN/HIA 5-Nov-20 MS/20/0 17 DN/HIA 5-Nov-20 MS/20/0 17 DN/HIA 5-Nov-20 MS/20/0 17 5 Pcs 145967/Pcs Material ISSUE DEBIT NOTE Status Detail action Total Grakind IQC-QILUnion Bolt Patah ( Broken ) o 09-20-003 Amount (IDR) Scrap , Man Power , Tool , Material Sep-20 Casting on Grade IQC-QI-09A Area 20-001 R1 Unit price (IDR) DN/HIA 23-OctGrakind MS/20/0 4-Nov-20 CLOSE 20 o 13 DN/HIA 30-OctMS/20/0 27-Nov-20 CLOSE 20 15 DN/HIA 30-OctMS/20/0 27-Nov-20 CLOSE 20 15 DN/HIAMS/20/015 27-Nov-20 CLOSE © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. BMT BMT BMT 31 4. Outgoing, Process & Incoming Quality Control. 4.6. Returned Material Approval (RMA). Action Month Supplier Part Name Problem QA SUPPLIER APPROVAL QI Qty Scrap , Man Power , Tool , Material Unit price (IDR) ISSUE DEBIT NOTE Amount (IDR) Detail action Issue date Approval date Invoice NO Issue Date Status PIC / Supplier Payment Date Sorting Cost 52.7 Hour 40463/Hour IDR 2,132,400.10 28-Oct 30-Oct DN/HIAM 4-Nov-20 11-Jan-21 S/20/016 CLOSE DPM Repair Cost 9.4 Hour 40463/Hour IDR 380,352.20 28-Oct 30-Oct DN/HIAM 4-Nov-20 11-Jan-21 S/20/016 CLOSE DPM 10/28/2020 10/30/2020 CLOSE DPM Man Power DPM Screw Flat Not Full Plating ( IQC-QIL-10Plating tidak rata ) 20-004 'Oct-20 IDR 2,512,752.30 Total Washer 11-Jan-21 Man Power Sorting Cost 4 Hour 40463/Hour IDR 161,852.00 20-Nov 24-Nov DN/HIAM 25-Nov22-Dec-20 CLOSE S/20/018 20 RKI Material Finish Good 3 Pcs 389203/Set IDR 1,167,609.00 20-Nov 24-Nov DN/HIAM 25-Nov22-Dec-20 CLOSE S/20/018 20 RKI Material Finish Good 1 Pcs 389203/Set IDR 389,203.00 20-Nov 24-Nov DN/HIAM 25-Nov22-Dec-20 CLOSE S/20/018 20 RKI 11/20/2020 11/24/2020 12/22/2020 CLOSE RKI 20-Nov 24-Nov DN/HIAM 25-Nov22-Dec-20 CLOSE S/20/019 20 RKI 11/20/2020 11/24/2020 IQC-QIL-1020-006 RKI DN/HIAMS/20/016 Dented & Damage IQC-QIL-1120-004 IDR 1,718,664.00 Total DN/HIAMS/20/018 Nov-20 IQC-QIL-1120-001 RKI Level Indicator Material Finish Good 8 Pcs 389203/Set IDR 3,113,624.00 Sink Mark Total CONFIDENTIAL IDR 3,113,624.00 DN/HIAMS/20/019 12/22/2020 CLOSE © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. RKI 32 4. Outgoing, Process & Incoming Quality Control. 4.6. Returned Material Approval (RMA). Action Month Supplier Part Name Problem QI Scrap , Man Power , Tool , Material Man Power Man Power Grakindo Bolt Damage/Dented IQC-QIL-1120-006 Material Material QA SUPPLIER APPROVAL Qty Unit price (IDR) Detail action Nov-20 BMT Holder Mirror No Thread IQC-QIL11-20-005 Master Cylinder Finish Dimension 53 mm IQC-QI-11Out of Spec 20-002 Approval date Invoice Payment Issue Date NO Date DN/HIA 30-Nov-20 15-Dec-20 MS/20/0 21 DN/HIA IDR Controller ( Leader ) 8 Hour 98456/Hour 30-Nov-20 15-Dec-20 MS/20/0 787,648.00 21 DN/HIA IDR F/G K59 1 Set 315212/Set 30-Nov-20 15-Dec-20 MS/20/0 315,212.00 21 DN/HIA IDR F/G K2FF 3 Set 361428/Set 30-Nov-20 15-Dec-20 MS/20/0 1,084,284.00 21 Sorting Cost 17 IDR 49228/ Hour Hour 836,876.00 Holder Mirror ( Warranty Claim ) PIC / Supplier 23-DecGrakind 20-Jan-21 CLOSE 20 o 23-DecGrakind 20-Jan-21 CLOSE 20 o 23-DecGrakind 20-Jan-21 CLOSE 20 o 23-DecGrakind 20-Jan-21 CLOSE 20 o IDR 11/30/2020 12/15/2020 DN/HIAMS/20/021 20-Jan-21 CLOSE Grakindo 3,024,020.00 1 Pcs 51060/PCs IDR 51,060.00 IDR 51,060.00 Total Hitachi Asia GW ISSUE DEBIT NOTE Status Issue date Total Material Amount (IDR) DN/HIA 18-Dec17-Dec-20 17-Dec-20 MS/20/0 29-Jan-21 CLOSE 20 20 BMT DN/HIAM 12/18/202 1/29/2021 CLOSE S/20/020 0 BMT 12/17/2020 12/17/2020 Man Power Sorting Cost ( By Visual ) 361.8 IDR 49228/Hour 21-Dec-20 Hour 17,810,690.40 22-Jan-21 DN/HIAM 29-Jan-21 S/21/025 OPEN GW Man Power Sorting Cost ( By Jig ) 32 IDR 49228/Hour 21-Dec-20 Hour 1,575,296.00 22-Jan-21 DN/HIAM 29-Jan-21 S/21/025 OPEN GW Material Special Jig 21-Dec-20 22-Jan-21 DN/HIAM 29-Jan-21 S/21/025 OPEN GW IDR 21-Dec-20 6,868,129.00 22-Jan-21 DN/HIAM 29-Jan-21 S/21/025 OPEN GW IDR 12/21/2020 26,654,115.40 1/22/2021 DN/HIAM 29-Jan-21 S/21/025 OPEN GW Material 2 Master Cylinder Finish 139 Total CONFIDENTIAL 200000/Pcs 49411/Pcs IDR 400,000.00 © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 33 4. Outgoing, Process & Incoming Quality Control. 4.6. Returned Material Approval (RMA). Action Month Supplier Part Name BMT Cap Reservoir Problem Over Buffing QI IQC-QIL12-20-006 QA SUPPLIER APPROVAL Unit price (IDR) Qty BMT 7-Jan-21 DN/HIAM 21-Jan-21 S/21/023 OPEN BMT 1/6/2021 1/7/2021 DN/HIAMS 21-Jan-21 /21/023 OPEN BMT 6-Jan-21 18-Jan-21 DN/HIAM 20-Jan-21 S/21/022 OPEN Kohwa 1/6/2021 1/18/2021 DN/HIAMS 1/20/2021 /21/022 OPEN 25-Jan-21 25-Jan-21 DN/HIAM 29-Jan-21 S/21/024 OPEN NICHRIN 1/25/2021 1/25/2021 DN/HIAMS 29-Jan-21 /21/024 OPEN 26-Jan-21 27-Jan-21 DN/HIAM 29-Jan-21 S/21/026 OPEN Grakindo 1/26/2021 1/27/2021 DN/HIAMS 29-Jan-21 /21/026 OPEN 7.35 Hour 49228/Hour IDR 361,825.80 6-Jan-21 7-Jan-21 Material Screw Flat 666 Pcs 98/Pcs IDR 65,268.00 6-Jan-21 IDR 427,093.80 Sorting Cost 3.2 49228/Hour IDR 157,529.60 Approval date Invoice NO Issue Date Payment Date IQC-QIL12-20-007 Material Nichirin Hose Brake OPEN Repair Cost Issue date IDR 157,529.60 Total Tonjolan Area Hose end DN/HIAM 21-Jan-21 S/21/023 Man Power Man Power Rusty PIC / Supplier Detail action Total Kohwa Piston Master Status Scrap , Man Power , Tool , Material Dec-20 ISSUE DEBIT NOTE Amount (IDR) Brake set assy k59 1 Set 390995/Set IDR 390,995.00 Kohwa IQC-QIL01-21-004 IDR 390,995.00 Total NICHRIN Jan-21 Material Grakind Union Bolt o Scratch di area Flange Brake set assy k59 1 Set 390995/Set IDR 390,995.00 IQC-QIL01-21-005 Total CONFIDENTIAL IDR 390,995.00 © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. Grakindo 34 4. Outgoing, Process & Incoming Quality Control. 4.7. Holding Parts (Astemo) AS – GW Master & Caliper Cylinder Finish. HOLDING PARTS HIAMS-AS ( GW ) MASTER & CALIPER CYLINDER FINISH Action No Part Name Problem Propose Debit Note Qty Sorting Touch Up Clean Up Painting Remark Status Repair for Burr ( All part can use ) Close Other 1 Master Cylinder Finish Burr Inside ID ( G area ) 1373 2 Master Cylinder Finish Burr Inside ID ( End of Tapping ) 740 740 Need maximum spec for size of Burr Close 3 Master Cylinder Finish Air Vent 1040 1040 Machine Adjust Close 4 Caliper Cylinder Finish Piston Load Problem ( Machining Line C&D ) 4347 4374 66 Pcs Can't Reuse Close 5 Caliper Cylinder Finish Innovalues Part 10492 10492 Waiting Approval GCN Open Sorting Result : Total Check : 107917 OK : 107778 NG : 139 ( 0.12 % ) Open 6 Mater Cylinder Finish Dimension 53 107917 mm Out of Spec. 1373 107917 CONFIDENTIAL Repair Cost to Charge to GW On progress D/N Can't Reused part will charge to GW Repair Cost to Charge to GW On progress D/N © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 35 5. SQM Activity. 5.1. Supplier Performance (PPM & Quality Rank). No Supplier code or G&G Code 1 241577 2 867374 3 Quantity Rejected FY2020 Supplier Name Quality Rank ( Jan'21 ) Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 S 0 0 0 25 588 250 882 1 391 42 0 0 2179 D 864356 ALPS ELECTRIC (MALAYSIA) SDN. BHD. BUMIPUTERA MANUFAKTUR TEKNOLOGI, PT DHARMA POLIMETAL, PT 0 0 1 0 1 1 2039 0 5 0 0 0 2047 S 4 692473 FUKOKU TOKAI RUBBER INDONESIA, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 5 687394 FUJI SPRING INDONESIA, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 6 665443 GARUDA METALINDO, PT TBK 0 0 0 0 0 0 0 0 0 0 0 0 0 S 7 10414 HIAMS -AS GW THAILAND 0 0 0 0 14 1413 0 2 0 0 0 0 1429 S 8 10414 0 0 0 0 0 0 0 0 0 0 0 0 0 S 9 683684 0 0 0 0 0 0 0 0 0 0 0 0 0 S 10 592358 SHOWA DENKO KIYOKUNI HIGH PRECISION AUTOMOTIVE INDONESIA, PT KOHWA PRECISION INDONESIA, PT 0 0 0 0 0 0 0 0 29 0 0 0 29 S 11 687029 KOMATSU BANE INDONESIA, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 12 10413 MURAKOSHI JAPAN 0 0 0 0 0 0 0 0 0 0 0 0 0 S 13 683384 NICHIRIN INDONESIA, PT 0 0 0 1 0 0 33 1 3 3 0 0 41 D 14 725057 NOK INDONESIA SALES, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 15 683683 OCHIAI MENARA INDONESIA, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 16 534832 RHYTHM KYOSHIN INDONESIA, PT 0 0 0 0 9 0 1116 9 0 0 0 0 1134 S 17 535418 SANWA ENGINEERING INDONESIA, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 18 703297 SIGMA & HEARTS INDONESIA, PT 0 0 73 555 1875 14 0 0 2 9 0 0 2528 C 19 693932 KURODA ELECTRIC INDONESIA, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 20 10413 TAGA JAPAN 0 0 0 0 0 0 0 0 0 0 0 0 0 S 21 10413 TAKECHI JAPAN 0 0 0 0 0 0 0 0 0 0 0 0 0 S 22 10413 WATANBE JAPAN 0 0 0 0 20 0 0 0 0 0 0 0 20 S 23 898696 GRAKINDO MAJU SUKSES, PT 0 0 1 0 0 10 0 4 0 2 0 0 17 C 24 898701 SUGINDO INTERNATIONAL, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 25 898700 PDF PRESISI ENGINEERING, PT 0 0 0 0 0 0 0 0 0 0 0 0 0 S 0 0 75 581 2507 1688 4070 17 430 56 0 0 0 #DIV/0! 44 164 673 363 910 5 97 9 Total CONFIDENTIAL 9424 272.24 © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 36 5. SQM Activity. 5.2. Worst Supplier Performance Monitoring. Worst Supplier Ranking List (1H20) Worst Ranking Supplier Code Name of Company Total Score 1 0000703297 SIGMA & HEARTS INDONESIA, PT 78 2 0000864356 DHARMA POLIMETAL, PT 90 3 0000867374 BUMIPUTERA MANUFAKTUR TEKNOLOGI, PT 4 0000011676 5 Rating (Class) Monitoring Worst Supplier Performance Oct-20 Rating Score ( Class) 2H20 (Avg) Rating (Class) 92.5 B (Fair) 100 B (Fair) 91 B (Fair) 77 92.2 B (Fair) 74.25 D (Worst) 70 HIAMS -AS GW THAILAND 93 B (Fair) 96.75 A (Good) 100 0000683384 NICHIRIN INDONESIA, PT 94 B (Fair) 85 C (Poor) 100 6 0000898696 GRAKINDO MAJU SUKSES, PT 94 B (Fair) 91.75 B (Fair) 7 0000534832 RHYTHM KYOSHIN INDONESIA 96 A (Good) 86.75 C (Poor) D (Worst) S (Excelent ) D (Worst) D (Worst) Nov-20 Rating Score ( Class) 100 100 72 S (Excelent ) S (Excelent ) D (Worst) Dec-20 Rating Score ( Class) 85 C (Poor) 85 C ( Poor ) 87 C (Poor) 100 S ( Excellent ) 78 D (Worst) 100 S ( Excellent ) 68 D (Worst) 80 C ( Poor ) 100 S ( Excelent ) 77 87 C ( Poor ) 100 S (Excelent ) 87 C ( Poor ) 85 100 S (Excelent ) 87 C ( Poor ) 100 67 D (Worst) 80 C ( Poor ) 100 S (Excelent ) CONFIDENTIAL Jan-21 Rating Score ( Class) D (Worst) S (Excelent ) C (Poor) S (Excelent ) S (Excelent ) Feb-21 Rating Score ( Class) Mar-21 Rating Score ( Class) © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 37 5. SQM Activity. 5.3. Supplier Improvement Activity. Worst Ranking Name of Company 1H20 ( Score ) Major Problem 2H20 (Target) Action Due Date Status 1. Check 100% for concentricity item before input to Machining Process ( Still continue check ) Dec'20 Close 2. Additional machining process for inner diameter Dec'20 Close 3. Management Improvement Activity Mar'21 On Progress Jan'21 Continue 1. Made Quality warning deeping time chromating in upper range ( Standard 4-5 Minute ) Oct'20 Close 2. reduce quantity part in the deping process in lower range ( Standard 35-45 kg/Barel ) Oct'20 Close 3. Management Improvement Activity Mar'21 On Progress 1. BMT will conduct an internal audit & Subcont audit, especially in the QA Dept Dec'20 Close Every Week Continue Dec'20 Close 4. Check 200 % All part for 3 months until get rank s 3 times Start Dec'20 Continue 5. QC Patrol by SPV up Start Dec'20 Continue 6. Management Improvement Activity Mar'21 On Progress Supplier Action: 1. Revise Process Control Plan addition item control pressure and Flow rate . 2. Review PFMEA item Burr or contamination remain after Washing process. 3. Revise Machine check sheet addition item control at Washing machine. 4. Repair high pressure washing pump 5. Addition item to PM plan 6. Lesson learn this trouble to Caliper product at high pressure washing machine. Sep'20 Close Start Dec'20 Continue Supplier Action : 1 SIGMA & HEARTS INDONESIA, PT 78 Machining Problem ( Concentricity Problem effect from Forging Part ) > 95 Hitachi Action : 1. Tightening inspection 30 Pcs/Lot delivery for item Concentricity Supplier Action : 2 DHARMA POLIMETAL, PT 90 Plating Problem > 95 2. Continue Report Quality Problem every Week 3 4 BUMIPUTERA MANUFAKTUR TEKNOLOGI, PT HIAMS -AS GW THAILAND 3. carry out QCC activities for Quality Improvement 92.2 93 Painting Problem Machining Problem ( Burr Inside ID ) > 95 > 95 Hitachi Action: Weekly meeting QA Hitachi and GW every Friday CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 38 5. SQM Activity. 5.3. Supplier Improvement Activity. Worst Ranking 5 Name of Company NICHIRIN INDONESIA, PT 1H20 ( Score ) 94 Major Problem Assembly Process Problem ( Hose end Mixing ) 2H20 (Target) Action Due Date Status 1. make OPL in process acsesories mention crimping 1 Nov'20 Close 2. Change the marking position, both crimping have to marking Nov'20 Close 1. Re-Training to technican related WI Setting Nov'20 Close 2. Modification Dies related problem Union bolt dented Nov'20 Close 3. Check 200% in Hitachi for old stock and monitoring quality judgement for Final Inspection in Grakindo ( Skill Up ) Dec'20 Close 4. Management Improvement Activity Mar'21 On Progress 1. Re-Training to Inspector Related WI and Limit sample Nov'20 Close 2. Modification Shutter at stamping proses for reducing dented on Washer Dec'20 Close 3. Add Operator Indentify on Part label for monitoring Dec'20 Continue 4. Management Improvement Activity Mar'21 On Progress > 95 3. Check 200% in Hitachi for monitoring quality judgement for Final Inspection in Grakindo ( Skill Up ) 4. Management Improvement Activity 6 7 GRAKINDO MAJU SUKSES, PT RHYTHM KYOSHIN INDONESIA 94 96 Forging Problem Molding & Stamping Problem > 95 > 95 CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 39 5. SQM Activity. 5.3.1 Supplier Improvement Activity. Supplier Management Improvement Activity PT. BUMIPUTERA MANUFAKTUR TEKNOLOGI 1. Automatic Process treatment machine to get a more accurate processing time CONFIDENTIAL 2. Management Tool: Change tool storage from manual to automatic to simplify the traceability of tool changes © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 40 5. SQM Activity. 5.3.1 Supplier Improvement Activity. Supplier Management Improvement Activity PT. BUMIPUTERA MANUFAKTUR TEKNOLOGI 3. Monitoring 200 % Check in Hitachi and create operator performance reports from the results of 200% check, to find out which operators need to be fixed CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 41 5. SQM Activity. 5.4. Supplier Quality Audit. Online Audit (Ms. Team) No 1 Supplier Name PT. Dharma Polimetal Periode PLAN ACTUAL 2 PT. Nichirin Indonesia PLAN ACTUAL 3 4 PT. Kiyokuni High Precision Automotive Indonesia PT. Kohwa Precision Indonesia PLAN ACTUAL December'20 I II PT. Rhythm Kyoshin Indonesia PT. Komatsu Bane Indonesia 7 PT. Sigma & hearts Indonesia II III February'21 IV V I II III March'21 IV I II III IV Part 1 Part 2&3 Part 4 V 1-Dec 2-Dec 2-Feb 24-Mar Part 1 Part 2&3 Part 4 2-Dec 2-Dec 22-Feb 24-Mar Part I Part 2&3 Part 4 18-Dec 26-Feb 25-Mar Part 1 Part 2&3 Part 4 2-Dec 18-Dec 16-Dec 1-Mar 25-Mar Part 1 Part 2&3 Part 4 7-Dec 5-Mar 25-Mar Part 1 Part 2&3 Part 4 PLAN ACTUAL I 24-Mar PLAN PLAN V 8-Feb ACTUAL 6 IV 1-Dec ACTUAL 5 III January'21 16-Jan 8-Dec 8-Mar 26-Mar Part 1-3 Part 4 25-Jan 8-Mar 26-Mar Part 1 Part 2-3 Part 4 PLAN ACTUAL 8 9 PT. Fukoku Tokai Rubber Indonesia PT. Fuji Spring Indonesia PLAN ACTUAL PLAN ACTUAL 10 PT. Kuroda Electric Indonesia PLAN ACTUAL 11 PT. NOK Indonesia Sales PLAN ACTUAL 25-Jan 18-Dec 15-Mar 26-Mar Part 1 Part 2&3 Part 4 18-Jan 17-Dec 19-Mar 29-Mar Part 1 Part 2&3 Part 4 22-Mar 29-Mar Part 2&3 Part 4 17-Jan 15-Jan Part 1 & 2 15-Jan CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 42 5. SQM Activity. 5.4. Supplier Quality Audit. Part 1 Analysis of Customer Quality Information & Specific Requirements from Customer Audit Time No 10 11 Supplier PT. NOK INDONESIA PT. FTR Date 15-Jan-21 25-Jan-21 Audit Methode 9:30-11:10 9:30-12:00 Online ( Part 1 ) Online ( Part 1 ) Audit Result Audittor Auditee Bapak Hamidi ( QA ) Bapak Fratanto ( QA ) Nana Sukarna Ibu Nurulah ( QA ) Inu Widi ( QA ) Bapak Fratanto ( PU ) Nana Sukarna No. Category 1 Mayor 1 Minor Bapak Sunaryo ( MFG ) Bapak Agus ( QA ) Bapak Imam ( QA ) 2 CONFIDENTIAL Mayor Item Observations / Requests Duedate - SQM is not running properly. - There is no Specific evidence of a review Requirement From 29-Jan-21 of SQM 4.3 Costumer - Not yet created a CSR Matrix (SQM Hitachi) Doc. Control There is no external document control procedure 5-Feb - SQM is not running properly. - There is no Specific evidence of a review Requirement From 5-Feb-21 of SQM 4.3 Costumer - Not yet created a CSR Matrix (SQM Hitachi) © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 43 3 7 PT.Kohwa Precision Indonesia √ Change To √ PT. Diameteral Piston Caliper Involute Multisourch supplier √ PT. Diameteral Piston Master Involute Multisourch supplier ( Prototype Part ) √ PT. Bumiputera Manufaktur Teknologi √ PT. Ochiai Menara Indonesia Lever Washer Pin Additional dies #8 Change Supplier Plating From KPD --> Hotmal OK 4th Week on Nov'20 Mar'21 Mar'21 Mar'21 Feb'21 Feb'21 Plan Actual 19-Oct > 16Nov 14-Oct > 16Oct Result Plan Actual Result Plan Actual Result NG > OK Plan 20-Nov IPL ( Initial Part Label ) Result PPA & Use Instruction 4-Sep'20 JFE-->Tokuden-->Nakagawa-->KPI Piston Master Actual 03-Mar & 27Mar 03-Mar & 27Mar Plan Customer Approval Additional dies #5 Plan / Actual Product Testing Caliper Machining Adding Procces Sub Cont ( Innovalues ) Due Date Process Production Caliper Cyl Finish Reason of Change Part Measurement Part Name PT. Bumiputera Manufaktur Holder Cable Teknologi √ 5 6 Hitachi Automotive System Asia ( GW ) √ 4 Supplier Name Testing Part 2 P3TI ( Part/Product/Procces Trial Instructions ) Material Testing 1 New Supplier No PCR Category - 11-Mar 11-Aug 12-Aug 18-Sep'20 21-Sep'20 21-Sep'20 - 11-Mar 10-Aug 11-Aug - OK NG 19-Oct - Jan'21 19-Oct - OK - Jan'21 14-Jan'21 15-Jan'21 2-Dec'20 15-Jan 15-Jan OK Jan'21 OK ok - 31-Jan - Result OK - Plan 18-Dec Jan'21 Actual 18-Dec 18-Dec 28-Jan'21 Result Plan Actual Result OK Jan'21 29-Jan'21 OK Jan'21 OK Feb'21 Feb'21 Open Feb'21 Feb'21 Open Mar'21 Mar'21 Already submit to AHM Waiting Customer Approval Feb'21 Open 11-Dec Remaining testing result from supplier 18-Nov OK - 11-Dec Close OK 20-Nov 20-Nov 20-Nov Mar'21 Mar'21 Feb'21 Mar'21 Mar'21 4-Nov 14-Jan'21 14-Jan'21 Already submit to AHM Waiting Customer Approval OK OK OK 16-Nov 20-Nov 20-Nov Jan'21 Jan'21 Jan'21 Jan'21 Jan'21 Already submit to AHM Waiting 13-Nov 20-Nov 20-Nov Customer Approval OK OK OK Actual CONFIDENTIAL Waiting GCN Approval Open Jan'21 OK Jan'21 Over All Status 6. New Development/Engineering Change Control Feb'21 Feb'21 Feb'21 Waiting Adhesion test from Supplier Open Feb'21 Open © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 44 7. Others 7.1 Internal Audit Planning Background: IATF 16949 (and ISO 9001) requirements clause no. 9.2 about internal audit and instruction from QM Division related to Production Process Audit and Internal Special Quality Audit. Process Process Audited Owner Corporate Strategy 01-Mar 02-Mar 03-Mar 04-Mar 05-Mar QMS ⃝ SALES ⃝ Product & Process Design/Customer Project CFT ⃝ Control of Changes PDE ⃝ Quality Control Process QA ⃝ Nonconformity Management & Calibration QA ⃝ Production Planning PC Manufacturing PD Logistic Management PC ⃝ AR/AP Management FA ⃝ Purchasing Management PU ⃝ Human Resources Management HR ⃝ Machine Facilities & Infrastructure Management MT ⃝ Document Management DC ⃝ Customer Related Management CONFIDENTIAL ⃝ ⃝ © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 45 7. Others 7.2 Global Quality Operating System SASG Implementation Objectives: Global QMS standardization for Astemo Gr. by implementation of SASG. Future plan: All internal standard/documentation will be replaced by SASG. CONFIDENTIAL © PT. Hitachi Astemo Bekasi Brake Systems. All rights reserved. 46