ROO BROWNFIELD OPERATIONS PROJECT
REQUEST FOR INSPECTION
Contract #: 102444
102444TA-C-G0-G000-QA-PRO-0023
PROJECT No: R-039 DS Part
Discipline: Mechanical
RFI No: 102444TA-QA-RFI-00332
Contractor: TAAM Engineering Co.
Area/Location: NIDS
Sub System No: N/A
Date of Inspection: 12/05/2021
Time of Inspection: 07:00 AM
Intervention
Points
ITP No: N/A
ITP Item No: N/A
ITR/ACS No: N/A
Contractor
GCMC
TAAM
SNC LAVALIN
inspection Activity/Description: Re-instatement.
Inspection Item/Tag Number: Re-instatement.
Drawing & Rev No:
CHECKED & READY FOR INSPECTION
Submitted by
Contractor - Construction
Name
GCMC Construction
Alaa Rasheed
07834417750
Contact Mobile No:
Signature
Date & Time
12/05/2021
FOR QUALITY CONTROL DEPARTMENT USE ONLY
Contractor QC
Received and Checked by
GCMC QA / QC
RECEIVED BY
Name
CHECKED BY QCI
RECEIVED BY
RECEIVED BY
Ali Jawad
Contact Mobile No:
07834496104
Signature
Date &Time
12/05/2021
RFI on HOLD Report: YES
□
□
NO
Date:
Action : YES
□
□
NO
Date:
INSPECTION RESULTS (Tick as applicable)
ACCEPTABLE (A)
□
NOT READY FOR INSPECTION (NR)
REJECTED (R)
□
CANCELLED (C)
□
□
REASON FOR CANCELLATION / NOT READY FOR INSPECTION/REJECTION
1-Incomplete Work
2-Insufficient documents attached
3- Repeated/unnecessary RFI
4-No action for RFI on Hold
5-No Power Supply available at site
6-PTW not available
7- Safety Issues
8- Test Crew not available
9- Test Equipment not available
10- Material not as per data sheet/drawing
11-Unacceptable Test Procedure/Result
12-Violation of ITP
13-Poor Workmanship
14-Spec. Violation
15-Installation not as per drawing
16- Other Comments/Remarks:
Punch List Number (if any):
Inspected By
Name
Signature
RFI Closed on
Contractor QA/QC
GCMC QA/QC