Uploaded by Mohammed Ali

3641-ge frame 9e turbines

advertisement
GE FRAME 9E
TURBINES
PG9171-E 123-MW / 50-HZ DUAL FUEL TURBINES
SPECIFICATIONS
Number of Units:
[8] NEW Units
Design Application:
Designed for High Ambient Temperatures
Delivery Time:
Warranty:
Payment:
Validity:
Immediate
Full, 18 months from delivery, or 12 month operation.
LC
30 days – subject to prior sale –
Package: 106 Ft Long 36 Ft High (Air Intake) X 10 Ft Wide Plus Electrical House & Cooler Assembly
Gas Turbine:
Accessory Compartment:
Exhaust Plenum:
Exhaust Accessories:
Load Compartment:
GE Frame 9E Turbines
Dimensions:
12.66 m x 5.03m x 5.05m
8.45m x 3.45m x 4.10m
5.35m x 3.45m x 3.94m
5.55m x 3.65m x 0.76m
5.30m x 1.90m x 1.05m
Weights:
202-Tons
43.5-Tons
22.5-Tons
6.4-Tons
4.6-Tons
Page 2 of 6
GE FRAME PG9171 TECHNICAL DESCRIPTION
GE Frame 9E Turbines
Page 3 of 6
GE Frame 9E Turbines
Page 4 of 6
GE Frame 9E Turbines
Page 5 of 6
Download