GE FRAME 9E TURBINES PG9171-E 123-MW / 50-HZ DUAL FUEL TURBINES SPECIFICATIONS Number of Units: [8] NEW Units Design Application: Designed for High Ambient Temperatures Delivery Time: Warranty: Payment: Validity: Immediate Full, 18 months from delivery, or 12 month operation. LC 30 days – subject to prior sale – Package: 106 Ft Long 36 Ft High (Air Intake) X 10 Ft Wide Plus Electrical House & Cooler Assembly Gas Turbine: Accessory Compartment: Exhaust Plenum: Exhaust Accessories: Load Compartment: GE Frame 9E Turbines Dimensions: 12.66 m x 5.03m x 5.05m 8.45m x 3.45m x 4.10m 5.35m x 3.45m x 3.94m 5.55m x 3.65m x 0.76m 5.30m x 1.90m x 1.05m Weights: 202-Tons 43.5-Tons 22.5-Tons 6.4-Tons 4.6-Tons Page 2 of 6 GE FRAME PG9171 TECHNICAL DESCRIPTION GE Frame 9E Turbines Page 3 of 6 GE Frame 9E Turbines Page 4 of 6 GE Frame 9E Turbines Page 5 of 6