Cebu Institute of Technology University Technical Elective EE182 K2 C2 Board Wiring No.1 Two Lamps in Parallel Title Name of Student Radaza, Marvin A. Instructor The purpose of this performance task is to install two parallel connected Light Emitting Diode (LED) lamps controlled by a Single Pole Single Throw (SPST) switch and the circuit must be protected against any accidental short circuit by using a 20 A circuit breaker. Section Distance (in) Allowance (in) No. of Wires CB- JB1 JB1- SW JB1- JB2 JB2- Lamp 1 JB2- Lamp 2 Total: Length (in) VII. List of Materials and Material Costs: Quantity Materials Specifications Unit Price Total Price 1 pc Circuit Breaker 1-phase, 20A P450 P450.00 1 pc Switch SPST P110 P110.00 2 pcs LED lamp E27, 3W P79 P158.00 2 pcs socket E27, 4” dia P33 P66.00 4 pcs Junction box 4”x4” P35 P140.00 1 pc Utility box 2”x4” P24 P24.00 7m Stranded Wire AWG #14, THHN, THWN P40 P280.00 1 length PVC ½” or 20mm dia P85 P85.00 30 pcs Wood screw ¾” P1 P30.00 10 pcs PVC clip ½” P3 P30.00 1 roll Electrical tape ¾” P40 P40.00 9 pcs Male adapter with lock nut ½” P9 P81.00 Total: P1494.00