ACTIVITY NO. 2: Pre-Construction Requirement
1.1. Program Outcomes (POs) Addressed by the Activity
a) ability to function on multidisciplinary teams
b) ability to communicate effectively
1.2. Activity Intended Learning Outcomes (AILOs)
At the end of the activity, the students shall be able to:
a) Identify project specifications
b) Familiarize bidding requirements
c) Understand building permit process
1.3. Aims of the Activity
The aim of this activity is to acquaint students with the pre-construction requirements.
1.4. Principle of the Activity
Research on the following topics to familiarize yourself with the background of the activity:
a) Project Specifications
b) Requirements for Bidding Projects
c) Building Permit Process in the Philippines
1.5. Procedures/Instruction
The activity comprises of the following steps:
A. Project Specifications
1. Finalize project specification requirements using the initial draft from Activity 1.
B. Bidding Requirements
1. Aside from documents collated in Activity 1, secure other pertinent requirements necessary
for bidding a project.
C. Building Permit Process
1. Identify important factors to consider in securing a building permit.
2. Furnish a copy of a building permit.
1.6. Data and Discussion
1.6.1. Principle of the Activity
1
FO-ACAD-SDE-00X/20MAR2020/REV.0
1.6.2. Design Attachments/Illustrations (See attached)
Attachment 1:
Attachment 2:
1.6.3. Observation
2
FO-ACAD-SDE-00X/20MAR2020/REV.0
1.6.4. Conclusion
1.6.5. Documentation
3
FO-ACAD-SDE-00X/20MAR2020/REV.0