ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0

ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
ZXSDR B8200&R8840 (V4.0) NodeB
Engineering Installation Guide
(BBU Indoors & RRU Indoors)
(V1.0)
ZTE CORPORATION
Confidential and Proprietary Information of ZTE CORPORATION.
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors)
V1.0
Planned by:
UMTS Customer Service Dept., Mobile Product Support Center
Complied by:
Tang Jia-bin
Reviewed by:
*
*
Li Chun-he
*
Zhu Biao
*
ZTE CORPORATION
Address: ZTE Plaza, #889 Bibo Road, Zhangjiang Hi-tech Park, Shanghai, P. R. China
Post code: 201203
Technical support website: http://tsm.zte.com.cn
Hotline: +86 755 26770800
800-830-1118
Fax: +86 755 26770801
Confidential and Proprietary Information of ZTE CORPORATION.
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Legal Information
All rights reserved. No part of this documentation may be excerpted, reproduced, translated, annotated or
duplicated, in any form or by any means without the prior written permission of ZTE Corporation.
and
are the registered trade marks of ZTE Corporation. The names and logos of ZTE products are
proprietary logos or registered trade marks. The names of other products and companies mentioned in this
manual may be proprietary to their owners respectively. Without the prior written permission of ZTE or the owners
of third-party trade marks or trade names, this manual does not grant the reader any permission or right to use
any marker appeared in the manual.
The product described herein conforms to the design requirements of environment protection and human security.
The storage, usage, and discard of the product shall comply with the manual, related contract, or laws and
regulations of related countries.
The actual product may differ from what is described in this standard due to frequent update of ZTE products and
fast development of technologies. Please contact the local ZTE office for the latest updating information of the
product.
For the latest document information, please visit our website: http://tsm.zte.com.cn
Confidential and Proprietary Information of ZTE CORPORATION.
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Feedback Table
You are invited to give your suggestions and opinions to improve ZTE user manuals and enjoy better service by sending emails to
ydshyf@zte.com.cn. Thank you for your cooperation!
Document Name
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Product Version No.
V4.0
Document
Version No.
V1.0
Please provide your information for further contact:
Name
Company
Post Code
Address
Tel
E-mail
Very Good
General View
Preparation flow
Environment requirements
Auxiliary equipment
Comments
Working interface
Work instruction
Convenient to consult
Correct content
Complete content
Straightforward expression
Confidential and Proprietary Information of ZTE CORPORATION.
Good
Ordinary
Bad
Very Bad
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
You may give suggestions from any perspective such as the content, structure, details, depth, expression, figures/tables,
special tools, FAQ and so on. The suggestions are not confined to this document.
Suggestions
Confidential and Proprietary Information of ZTE CORPORATION.
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Revision Records
Document
Version No.
V1.0
Prepared/Revised by
Prepared/Revised on
Tang Jia-bin
2009-08-10
Total Pages
Reason for Revision
None
Contents of Revision
(Key Points Only)
None
Note 1: This table must be completed before updating the archived document (the document archived in the archival room of the division or the Company).
Note 2: Fill "None" in "Reason for Revision" and "Contents of Revision" when archiving this document for the first time.
Confidential and Proprietary Information of ZTE CORPORATION.
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Preface
Manual Description
This manual details the main procedure and precautions for the ZXSDR B8200&R8840 (V4.0) NodeB installation (BBU indoors & RRU
indoors) according to the installation flow on the site.
Application Scope
This manual is applicable to the onsite engineering installation personnel and the personnel from the local offices and the customer service
department.
Abstract
In the form of rich texts and abundant figures, this manual introduces the typical installation mode and installation procedures (installing
B8200 indoors and R8840 indoors) of ZXSDR B8200&R8840 NodeB (V4.0), the cable connection and distribution requirements for both the
equipment and auxiliary equipment. It describes the main installation procedure, precautions, key points as well as the installation tools and
materials so as to improve installation efficiency and reduce mistakes. It aims to provide reliable instruction for the onsite working personnel.
Confidential and Proprietary Information of ZTE CORPORATION.
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Contents
Chapter 1 Installation Tools .......................................................................................................................................................1
1.1 Special Tools ............................................................................................................................................................2
1.2 Punching Tools .........................................................................................................................................................2
1.3 Common Tools .........................................................................................................................................................3
1.4 Measurers ................................................................................................................................................................3
1.5 Pliers and Clamps ....................................................................................................................................................4
1.6 Protective Tools ........................................................................................................................................................5
1.7 Auxiliary Tools...........................................................................................................................................................5
Chapter 2 Introduction to B8200&R8840 NodeB......................................................................................................................6
2.1 B8200.......................................................................................................................................................................7
2.2 R8840.......................................................................................................................................................................8
2.3 Simple Installation Bracket .......................................................................................................................................9
2.4 19-Inch Standing Installation Rack .........................................................................................................................10
2.5 RRU Standing Installation Rack .............................................................................................................................11
2.6 BC8180 Cabinet .....................................................................................................................................................12
Chapter 3 Auxiliary Engineering Materials .............................................................................................................................13
Confidential and Proprietary Information of ZTE CORPORATION.
i
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 4 B8200&R8840 Engineering Installation Flow ........................................................................................................19
Chapter 5 Installation Preparation...........................................................................................................................................21
Chapter 6 Installing B8200 Indoors .........................................................................................................................................28
Chapter 7 Installing R8840 Indoors & Antennas ....................................................................................................................37
Chapter 8 Cable Connection for Indoor Equipment...............................................................................................................41
Chapter 9 Making Cable Connectors and Labeling ...............................................................................................................66
Confidential and Proprietary Information of ZTE CORPORATION.
ii
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 1 Installation Tools
Confidential and Proprietary Information of ZTE CORPORATION.
1
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
1.1 Special Tools
Feeder connector cutter
Coaxial cable wire stripper
Multifunction crimping pliers
VSWR gauge
Ground resistivity gauge
Optical multimeter
Drill bit
Dust cleaner
Multimeter
1.2 Punching Tools
Electric impact drill
Confidential and Proprietary Information of ZTE CORPORATION.
Wiring board
2
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
1.3 Common Tools
Cross screwdriver
Slotted screwdriver
Adjustable wrench
Electric iron
Soldering tin thread
Rubber hammer
5m steel tape
Level ruler
Two-use wrench
1.4 Measurers
50m tape measure
Confidential and Proprietary Information of ZTE CORPORATION.
Goniometer
3
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Compass
Plumb
1.5 Pliers and Clamps
Hacksaw
Sharp nose pliers
Diagonal pliers
Pincer pliers
Multi-use files
Nippers
Paint brush
Scissors
Confidential and Proprietary Information of ZTE CORPORATION.
4
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Heat gun
Solder removal tool
Hydraulic pliers
Safety helmet
Anti-slip gloves
Ropes
Ladder
Crowbar
1.6 Protective Tools
Antistatic bracelet
1.7 Auxiliary Tools
Pulley block
Confidential and Proprietary Information of ZTE CORPORATION.
5
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 2 Introduction to B8200&R8840 NodeB
Confidential and Proprietary Information of ZTE CORPORATION.
6
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
2.1 B8200
B8200 dimension: 482.6mm×197mm×88.4mm (W×D×H), not more than 8.75kg in full configuration
Confidential and Proprietary Information of ZTE CORPORATION.
7
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
2.2 R8840
R8840 dimension: 320mm×160mm×370mm (W×D×H), 16.5kg
R8840 supports both the -48V DC power supply and the 220V AC power supply. And its nominal transmission power is 40W/60W.
Confidential and Proprietary Information of ZTE CORPORATION.
8
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
2.3 Simple Installation Bracket
Dimension of simple installation bracket: 530mm×235mm×200mm (W×D×H)
Confidential and Proprietary Information of ZTE CORPORATION.
9
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
2.4 19-Inch Standing Installation Rack
Dimension of 19-inch standing installation rack: 520mm×385mm×1600mm (W×D×H)
Confidential and Proprietary Information of ZTE CORPORATION.
10
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
2.5 RRU Standing Installation Rack
Dimension of RRU standing installation rack: 550mm×100mm×1600mm (W×D×H)
Confidential and Proprietary Information of ZTE CORPORATION.
11
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
2.6 BC8180 Cabinet
Dimension of BC8180 cabinet: 400mm×600mm×300mm (H×W×D)
Confidential and Proprietary Information of ZTE CORPORATION.
12
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 3 Auxiliary Engineering Materials
Confidential and Proprietary Information of ZTE CORPORATION.
13
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Name
yellow-green fire-resistance multi-strand cable
copper lugs and different colors of heat-shrink sleeves
Description
yellow-green PGND cable
power cables and PGND cables shall use the copper
lugs and heat-shrink sleeves to make terminals
black DC power cable
BS8800 DC power cable
copper ground bar
copper ground bar (used indoor or outdoor)
Confidential and Proprietary Information of ZTE CORPORATION.
Figure
14
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Name
Description
white ties
to bind indoor cables
waterproof insulating tape
to make waterproof measures for connectors
PVC insulating tape/black
to make waterproof measures for connectors
black nylon fastening tape
to bind indoor tail fibers
antistatic bracelet
antistatic bracelet
Confidential and Proprietary Information of ZTE CORPORATION.
Figure
15
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Name
input/output dry contact node cable
Description
Figure
6-way input and 2-way output, and one end is DB25
connector
75ohm E1 cable
4-way or 8-way 75ohm mini-coaxial E1 cable
120ohm E1 cable
4-way or 8-way 120ohm mini-coaxial E1 cable
1-to-4 SA cable, which contains a E1 cable, a dry
SA cable
contact node cable, an RS232/485 cable and a ground
cable
2-core outdoor woven shielded power cable (with meter marks on
it)
Confidential and Proprietary Information of ZTE CORPORATION.
to connect DC ILP and OLP
16
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Name
Description
R8840 rack-top jumper (2m, 3m, 5m)
1/2-inch rack top jumper (2 for each sector)
R8840 special monitoring cable
To monitor R8840 OLP status
ground clip of outdoor cable
ground clip of outdoor cable
R8840 special DC power cable
R8840 special AC power cable
Confidential and Proprietary Information of ZTE CORPORATION.
Figure
DC power cable from OLP to R8840 (containing 4 cores
- 2 blue and 2 black)
AC power cable from R8840 to OLP (containing 3 cores
– 1 brown, 1 blue and 1 black)
17
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Name
75ohm E1 terminal
Confidential and Proprietary Information of ZTE CORPORATION.
Description
Figure
75ohm E1 terminal
18
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 4 B8200&R8840 Engineering Installation Flow
Confidential and Proprietary Information of ZTE CORPORATION.
19
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Confidential and Proprietary Information of ZTE CORPORATION.
20
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 5 Installation Preparation
Confidential and Proprietary Information of ZTE CORPORATION.
21
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
5.1 Installation Preparation
Installation Figures
5.1.1 Site Environment Check
Installation Steps
1
Check the site location, power supply system, site transmission, lightning protective
ground, etc. according to the project design documents.
2
3
4
5
6
Key Points and Precautions
1
2
Installation Tools
Installation Materials
3
1
2
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
22
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
5.2 Unpacking and Inspection
5.2.1 Goods Check
Installation Steps
Installation Figures
1
Check the total number of the goods and the condition of the packing boxes. Check if
the arrival location is consistent with the actual installation location (see Figure 1).
2
Open the packing box and take out Equipment Inspection Checklist and Unpacking and
Inspection Report to check if the goods are consistent with Equipment Inspection
Checklist (see Figure 2).
3
4
Figure 1
Figure 2
5
6
Key Points and Precautions
Installation Tools
pen
1
Equipment Inspection Checklist and Unpacking Inspection Report should be archived.
2
If the goods are missed/delayed/broken, the goods quantity is incorrect, or wrong goods
are delivered, find out the reason. And the project supervisor should fill in Unpack and
Inspection Feedback Table and send it to ZTE Corporation ASAP for timely handling.
Installation Materials
1
2
3
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
23
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
5.2 Unpacking and Inspection
Installation Steps
Installation Figures
Figure 1
5.2.2 Unpacking Wooden Boxes
Figure 2
1
Insert a slotted screwdriver or a claw hammer into the metal locker of the top cover. (see
Figure 1).
2
Turn the screwdriver or hammer to loosen the sheet iron (see Figure 2).
3
Use a crowbar or pliers to remove the sheet iron.
4
Repeat Step 1 to 3 to remove other sheet irons and open the top cover (see Figure 3)
5
Take out the equipment from the wooden box.
6
Key Points and Precautions
1
It is prohibited to wear damp or dirty gloves to touch the equipment or parts.
2
Figure 3
Installation Tools
slotted screwdriver claw hammer
1
screwdriver
2
pliers
Installation Materials
3
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
24
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
5.2 Unpacking and Inspection
Installation Steps
Installation Figures
Figure 1
5.2.3 Unpacking Cartons
Figure 2
1
Cut the tape along the seam of the carton with a paper knife or other tools. Please note
do not cut too deep into the carton (see Figure 1).
2
Open the carton and take out the foam boards.
3
Check the goods according to the enclosed goods-delivery list inside the carton.
4
Take out the antistatic packing bag from the carton, open it and take out the electronic
equipment or parts (see Figure 2).
5
6
Key Points and Precautions
1
It is required to make antistatic measures before taking out the electronic equipment and
parts.
2
paper knife
Installation Tools
screwdriver
Installation Materials
3
1
2
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
25
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
5.2 Unpacking and Inspection
Installation Figures
5.2.4 Inspection and Handover
Installation Steps
1
Carefully check the goods according to the goods names, models, quantity, etc. listed in
Packing List. Record the goods one by one.
2
After the inspection, the user and the project supervisor must jointly sign Unpacking and
Inspection Report. The goods should be handed over to the user. Both parties should
keep a copy of the signed Unpacking and Inspection Report.
3
4
5
6
Key Points and Precautions
1
2
Installation Tools
pen
Installation Materials
Within seven days after the inspection, the project supervisor should feed back the
Inspection Conclusion in Unpacking and Inspection Report to ZTE Corporation for
archive.
Decide the goods handover mode according to the actual conditions on the site.
3
1
2
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
26
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
5.3 Preparation before Installation
Installation Figures
5.3.1 Preparation of Tools
Installation Steps
1
Prepare the installation tools for the installation of the indoor part of NodeB.
2
Prepare the installation tools and protective tools for the installation of the outdoor part of
NodeB.
3
4
5
6
Key Points and Precautions
1
For the construction personnel working on high buildings, it is required to check if the
protective tools (such as the safety belt, safety helmet and anti-slip gloves) are reliable
to ensure personal safety.
2
Installation Tools
Installation Materials
3
1
2
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
27
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 6 Installing B8200 Indoors
Confidential and Proprietary Information of ZTE CORPORATION.
28
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
6.1 Using the Existing 19-Inch Standing Installation Rack
Installation Figures
Figure 1
Figure 2
6.1.1 Installing B8200
Installation Steps
1
Check if the existing 19-inch installation rack meets the installation requirements (in view
of space and heat radiation).
2
Insert the fixing nut into the installation hole of the idle 5U slot in the rack for the
installation of B8200 and cable trough (see Figure 1).
3
Mount the cable trough to the 1U space near the fixing nut. And fix it securely with a
screwdriver (see Figure 2 and Figure 3).
4
Install B8200 above the cable trough in the same way as stated in Step 1 and 2 (see
Figure 4).
5
Check if B8200 has been installed firmly. It should not shake in the rack.
6
Key Points and Precautions
Figure 3
Installation Tools
cross screwdriver
1
2
1
Figure 4
Installation Materials
auxiliary fixing screws
The existing 19-inch installation rack should meet the installation requirements on
space:
a). at least 5U or more of installation space is available;
b. 1U of space should be reserved at the top, 2U in the middle is for B8200, and 1U
lower is for the cable trough, and the bottom 1U is for cabling.
Note: 1U=1.75 inch=44.45mm
B8200 radiating requirements:
At least 40mm of space should be reserved at the two flank sides of the ventilation and
radiation intake/outtake after the B8200 is installed (the air flow in B8200 is from right to
left). There shall be no radiation outtakes of other equipment to the right of the B8200. If
there is, the equipment should not be installed at the same horizontal level of the B8200.
2
B8200 equipment
3
3
1U cable trough
Confidential and Proprietary Information of ZTE CORPORATION.
29
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
6.2 Installing B8200 to the Wall with a Simple Installation Bracket
Installation Figures
Installation Steps
1
Determine the installation position of the simple installation bracket. Mark out the
punching positions on the wall according to the template or the bracket (see Figure 1).
2
Punching: (see Figure 2)
a). Punch in the marked positions with an electric impact drill (drill bit with a diameter
of 10mm);
b). The depth of the holes is between 50mm and 60mm.
Install expansion bolts:
a.) Knock the expansion bolt into the hole and make the expansion tube enter the
ground completely.
b. Screw down the bolt with an adjustable wrench;
c. Remove the nut, spring washer and flat washer from the bolt. They will be used to
install the simple installation bracket. And let the insulating pad go through the bolts, with
the pad holes matching the ground holes.
Let the simple installation bracket go through the bolts and rectify the location of the
bracket. Place the insulating flange, flat washer and spring washer into the bolt in
sequence, and screw down the nuts with a wrench in a diagonal manner (see Figure 3
and Figure 4).
Check if the simple installation bracket is fixed firmly. It shall not shake when pushed
with hands.
3
Figure 1
Figure 2
6.2.1 Installing Simple Installation Bracket
4
5
Key Points and Precautions
Figure 3
1
Keep the drill bit perpendicular to the wall and remove the dust with a dust cleaner
during punching.
2
The insulating flange must go through the simple installation bracket and insulating pad
until it touches the wall.
3
Requirements for the location of the simple installation bracket:
The bracket should have at least 400mm of maintenance space, and at least 100mm
of space at the flank sides to facilitate cabling and heat radiation.
4
B8200 heat radiating requirements:
Figure 4
Installation Tools
marker pen
electric impact drill
1
dust cleaner
drill bit
2
rubber hammer
adjustable wrench
Installation Materials
simple installation bracket
auxiliary installation parts (holing
template,
expansion
bolt
components, insulating pad)
B8200 should have at least 40mm of space at the flank sides for ventilation and heat
radiation (the air flow in B8200 is from right to left).
Confidential and Proprietary Information of ZTE CORPORATION.
30
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
6.2 Installing B8200 to the Wall with a Simple Installation Bracket
Installation Figures
6.2.2 Installing B8200 (in a Simple Installation Bracket)
Installation Steps
1
Install the cable trough in the 1U space at the bottom of the simple installation bracket.
Insert the cable trough and tighten the screws with a screwdriver (see Figure 1 and
Figure 2).
2
Install B8200 above the cable trough in the same way as Step 1 (see Figure 3 and
Figure 4).
3
4
Figure 1
Figure 2
5
6
Key Points and Precautions
1
Figure 3
Installation Tools
cross screwdriver
There are all together 4U of space in the simple installation bracket. The 2U in the
middle is for B8200, the top 1U is kept idle temporarily or installed with GPS components
(if AC power supply is adopted, AC/DC power switching unit PSU can be installed here),
and the bottom 1U is for the cable trough.
Figure 4
2
1
Installation Materials
auxiliary fixing screws
2
B8200 equipment
3
3
1U cable trough
Confidential and Proprietary Information of ZTE CORPORATION.
31
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
6.3 Installing B8200 With a 19-Inch Standing Installation Rack
Installation Figures
Installation Steps
1
2
Figure 1
6.3.1 Installing 19-Inch Standing Installation Rack
Assemble the 19-inch standing installation rack in the vacant space on the site, fix the
beam and upright column at the top by using four nuts (see Figure 1), assemble the
pedestal and upright columns at two sides, and tighten the eight nuts by hands (see
Figure 1).
Determine the installation location of the 19-inch standing installation rack, and draw the
locations for the holes of the assembled pedestal (see Figure 2)
3
Punching:
a). Punch in the marked positions with an electric impact drill (drill bit with a
diameter of 10mm);
b). The depth of the holes is between 50mm and 60mm.
4
Install expansion bolts:
a.) Knock the expansion bolt into the hole and make the expansion tube enter the
ground completely.
b. Screw down the bolt with an adjustable wrench;
c. Remove the nut, spring washer and flat washer from the bolt. They will be used to
install the simple installation bracket (see Figure 3).
5
Let the installation rack go through the bolts and rectify the location of the rack. Place
the flat washers and spring washers into the bolts in sequence, and screw down the nuts
with a wrench in a diagonal manner (see Figure 4).
Figure 2
Key Points and Precautions
Figure 3
Installation Tools
marker pen
electric impact drill
1
dust cleaner
drill bit
2
rubber hammer
adjustable wrench
1
The requirements for the installation location are as follows:
The installation rack should stay at least 400mm away from the front row of devices, the
upright columns should stay at least 400mm away from the rear wall or rear row of
racks, and there should be a space of at least 100mm at both sides.
Figure 4
2
Installation Materials
19-inch standing installation rack
It is recommended that the B8200 should be installed at the position of the 19-inch
installation rack 1 m above the ground.
3
auxiliary installation parts (holing
template,
expansion
bolt
components)
When drilling holes, you should keep the drill bit perpendicular to the ground and clear
the dust with the dust cleaner or other tools.
4
Check whether the 19-inch standing installation rack is fixed securely, and ensure that
the installation rack cannot be wobbled by hands.
5
For details on how to install the B8200, see 6.1 Using the Existing 19-Inch Standing
Installation Rack.
3
Confidential and Proprietary Information of ZTE CORPORATION.
32
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
6.4 Installing B8200 With a Hang-to-Wall BC8180 Cabinet
Installation Steps
Installation Figures
Figure 1
6.4.1 Installing B8200 With a Hang-to-wall BC8180 Cabinet
Figure 2
1
Decide the installation position for the BC8180 cabinet which is to be hanged to the wall.
And mark out the punching positions on the wall for the installation rack.
2
Punch and install expansion bolts. See Step 2 and Step 3 in 6.2.1 Installing Simple
Installation Bracket.
3
Let the insulating pad go through the bolts, and then let the BC8180 installation rack go
through the bolts. Place the flat washers and spring washers into the bolts in sequence,
adjust the BC8180 installation rack and screw down the nuts in a diagonal manner.
4
Hold the BC8180 cabinet, let its back hook fit in the installation rack to hang it to the rack
(see Figure 1), and then tighten the screws at the two side in the BC8180 cabinet (see
Figure 2).
The BC8180 cabinet has been installed with the 1U cable trough before it leaves the
factory. 2U above the cable trough is reserved for the B8200, whose installation steps
are similar to 6.2.2 Installing B8200 (in a Simple Installation Bracket) (see Figure 3).
5
6
If the AC power supply is adopted, an AC/DC PSU should be installed in the IU under
the cable trough. Other idle slots can be filled by blank filler panels. Tighten all screws
with a screwdriver (see Figure 3).
Key Points and Precautions
Figure 3
1
If the equipment room is too small, The B8200 can adopt in this installation mode and be
installed to the wall near the corridor or stair. However, it shall not be installed outdoors.
2
Requirements for the installation position of the BC8180 cabinet: The cabinet should
stay at least 400mm away from the front row of devices to facilitate maintenance, and
there should be a space of at least 100mm at both sides.
Check whether the BC8180 cabinet is fixed securely, and ensure that the BC8180
cabinet cannot be wobbled by hands.
Figure 4
Installation Tools
electric impact drill
marker pen
Installation Materials
BC8180 installation rack
3
1
dust cleaner
drill bit
2
auxiliary installation parts
4
rubber hammer
adjustable wrench
3
BC8180 cabinet
cable trough)
B8200
cross screwdriver
4
Confidential and Proprietary Information of ZTE CORPORATION.
(including
the
To guard against theft, it is required to lock the cabinet door after the equipment is
installed and hand it over to the operator.
33
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
6.5 Installing B8200 With an RRU Standing Installation Rack
Installation Figures
Figure 1
Figure 2
6.5.1 Installing RRU Standing Installation Rack
Installation Steps
1
Assemble the RRU standing installation rack, then fix the standing support to the RRU
installation rack base, and tighten the six auxiliary nuts at both sides with an adjustable
wrench (see Figure 1 and Figure 2).
2
Decide the installation position for the 19-inch standing installation rack. Mark out the
punching positions according to the assembled base (see Figure 3).
3
Punch and install expansion bolts. See Step 3 and Step 4 in 6.3.1 Installing 19-Inch
Standing Installation Rack.
4
Let the RRU standing installation rack go through the bolts, place the flat washers and
spring washers into the bolts in sequence, rectify the RRU standing installation rack, and
screw down the nuts in a diagonal manner (see Figure 4).
5
6
Key Points and Precautions
1
2
Figure 3
Figure 4
Installation Tools
electric impact drill
marker pen
1
dust cleaner
drill bit
2
rubber hammer
adjustable wrench
3
cross screwdriver
Requirements for the installation position of the RRU standing installation rack:
The cabinet should stay at least 800mm away from the front row of devices to facilitate
maintenance, the standing support should stay at least 800mm from the rear wall or rear
row of racks, and there should be a space of at least 100mm at both sides.
When drilling holes, you should keep the drill bit perpendicular to the ground and clear
the dust with the dust cleaner or other tools.
Installation Materials
components of RRU standing
installation rack
auxiliary installation parts
3
Check whether the RRU standing installation rack is fixed securely, and ensure that the
installation rack cannot be wobbled by hands.
4
4
Confidential and Proprietary Information of ZTE CORPORATION.
34
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
6.5 Installing B8200 With an RRU Standing Installation Rack
Installation Figures
Installation Steps
1
2
3
4
Figure 1
Figure 2
6.5.2 Installing B8200 (With an RRU Standing Installation Rack)
To install a B8200 to the RRU standing installation rack, a simple installation bracket is
required. After the RRU standing installed rack is assembled, decide the position of the
simple installation bracket. Usually, the position is 400mm above the base (see Figure
1).
Let the insulating flanges, simple installation bracket, insulating pads, RRU standing
installation rack, spring washers, flat washers and fastening nuts go through the
auxiliary nuts in sequence, and screw down the nuts with a wrench in a diagonal manner
(see Figure 2).
Install the cable trough in the 1U space at the bottom of the simple installation rack –
carefully insert the cable trough and tighten the screws with a screwdriver (see Figure
3).
Install the B8200 above the cable trough. The installation method is similar to Step 3
(see Figure 4).
5
6
Key Points and Precautions
1
Check whether the simple installation rack is fixed securely, and ensure that the
installation rack cannot be wobbled by hands.
2
Figure 3
Installation Tools
two
adjustable cross screwdriver
wrenches
Figure 4
Installation Materials
simple installation bracket
3
1
2
auxiliary installation parts
4
3
B8200
4
1U cable trough
Confidential and Proprietary Information of ZTE CORPORATION.
35
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
6.6 Installing Power Distribution Box to the Wall
Installation Figures
Figure 1
Figure 2
6.6.1 Installing AC/DC Power Distribution Box to the Wall
Installation Steps
1
Decide the installation position of the AC/DC power distribution box, and mark out the
punching position according to the box (see Figure 1).
2
Punch and install expansion bolts. See Step 2 and Step 3 in 6.2.1 Installing Simple
Installation Bracket (see Figure 2).
3
Hold the AC/DC power distribution box, insert the bolts into the holes in the wall and
tighten the screws with a screwdriver in a diagonal manner (see Figure 3).
4
Check whether the AC/DC power distribution box is fixed securely, and ensure that the
AC/DC power distribution box cannot be wobbled by hands.
5
6
Key Points and Precautions
1
2
Figure 3
Installation Tools
marker pen
electric impact drill
Installation Materials
DC power distribution box
3
1
hammer
2
AC power distribution box (optional)
4
3
auxiliary installation parts
cross screwdriver
4
Confidential and Proprietary Information of ZTE CORPORATION.
36
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 7 Installing R8840 Indoors & Antennas
Confidential and Proprietary Information of ZTE CORPORATION.
37
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
7.1 Installing R8840
Installation Steps
Installation Figures
Figure 1
7.1.1 Installing R8840 to the Wall Indoors
Figure 2
1
Determine the installation location of the hang-to-wall installation rack, and mark out the
punching positions with the holing template (see Figure 1).
2
For details on how to drill holes and install the expansion bolts, see Step 2 and 3 in
6.2.1 Installing Simple Installation Bracket.
3
Let the hang-to-wall installation rack go through the bolts, place the insulating flange, flat
washer, and spring washer, rectify the location of the hang-to-wall installation rack, and
tighten the nuts in a diagonal manner (see Figure 2).
4
Hold R8840, clip the fixing beam at its back to the pallet of the hang-to-wall installation
rack, and tighten the four inner-hexagon cheese-head screws at both sides to fix R8840
to the hang-to-wall installation rack tightly (see Figure 3 and Figure 4).
Check whether R8840 is fixed securely, and ensure that R8840 cannot be wobbled by
your hands.
5
Key Points and Precautions
Figure 3
Installation Tools
marker pen
electric impact drill
1
The interfaces of R8840 and OLP should face downwards, and there should be a space
of at least 300mm under them to facilitate cabling.
2
The insulating flange should go through the hang-to-wall installation rack and insulating
pad until its front end touches the wall so as to ensure that the equipment is insulated
from the wall.
Figure 4
1
dust cleaner
drill bit
2
rubber hammer
adjustable wrench
3
4
Installation Materials
hang-to-wall installation rack
auxiliary installation parts (holing
template,
expansion
bolt
components, insulating pad)
R8840 equipment
Confidential and Proprietary Information of ZTE CORPORATION.
3
Requirements for the R8840 installation position:
There should be a space of at least 300mm above R8840 to facilitate heat radiation. In
the space 300mm below R8840, there should be no barriers that hamper the outgoing
cables or connection of cables.
38
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
Installation Steps
7.1 Installing R8840
Installation Figures
Figure 1
7.1.2 Installing R8840 with an RRU Standing Installation Rack
Figure 2
1
To install one R8840 to the RRU standing installation rack, a set of general installation
components is required. One R8840 should be equipped with one set of general
installation components.
2
After the RRU standing installed rack is assembled, decide the position of the general
installation components (see Figure 1). The typical configuration is 3 RRUs and 1 BBU
installed to 1 RRU standing installation rack.
3
Let the bolts go through spring washers, flat washers, insulating flanges, general
installation components, insulating pads in sequence (see Figure 2).
4
Use two adjustable wrenches to securely fix the front screw and the rear one to the RRU
standing installation rack (see Figure 3).
5
Hold the R8840, let its back hook fit in the general installation components to hang it to
the rack, and then tighten the four inner-hexagon cheese-head screws at the two side to
fix R8840 to the general installation components tightly (see Figure 4).
6
Key Points and Precautions
1
2
Figure 3
Installation Tools
two
adjustable inner-hexagonal
wrenches
wrench
Before the installation, it is required to decide the installation positions and number of
respective equipment in the RRU standing installation rack, to avoid subsequent
problems during the installation.
The R8840 port should face downward and at least 300mm of space should be reserved
under the port.
Figure 4
Installation Materials
R8840
3
1
2
general installation components
4
3
auxiliary installation parts
4
Confidential and Proprietary Information of ZTE CORPORATION.
39
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
7.2 Antenna Installation and Cable Connection
Installation Figures
Figure 1
Figure 2
7.2.1 Antenna Installation and Cable Connection
Installation Steps
1
All the antennas must be installed securely. They shall not move and should meet the
wind-resisting requirements. The poles installed at the rooftop must be grounded and
located within the lightning-protective range.
2
The antenna port is at one end of the antenna. There are two red protective caps on the
jumper connectors. The lowest port is the electrically regulated port (see Figure 1).
3
Carefully hold the antenna, fix the installation rack to the pole, put the flat washers,
spring washers and nuts in sequence and finally slightly screw the nuts with hands (see
Figure).
4
Adjust the antenna installation position, horizontal angle and vertical angle, and tighten
the nuts (see Figure 4).
5
The azimuth error of the directional antenna should be within ±5°. And the pitching error
of the directional should be within ±0.5°. And the single-polarized antennas in the same
sector should have consistent pitching angle and azimuth angle.
6
Key Points and Precautions
1
2
The antenna should be within the protective range of the lightning rod, which means that
the lightning rod should be higher than the antenna. Protective angle: not more than 45°
in the plain and not more than 30° in high mountains and thunder-dense areas.
To ensure safety, safety measures should be taken before the antennas are installed.
Figure 3
Installation Tools
wrench
1
Installation Materials
antennas
2
auxiliary fixing screws
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
3
If the antenna is installed to the iron tower, it is required to lift it to the tower top:
a) Bind the upper side and the lower side of the antenna installation rack respectively
with two ropes.
b) To prevent the antenna from hitting the tower body, during the lift, one person
should take one of the ropes and lift the antenna upward; another person should
take anther rope to adjust the rack.
c) Because working on the tower top is very dangerous, it is recommended to use the
crown block to lift the antenna.
40
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 8 Cable Connection for Indoor Equipment
Confidential and Proprietary Information of ZTE CORPORATION.
41
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
Figure 1
Figure 2
8.1.1 Connecting & Distributing DC Power Cable
Installation Steps
1
For the simple installation bracket, 19-inch standing installation rack or RRU standing
installation rack, insert the connector of the special power cable into the PM module and
screw down the screws (see Figure 1).
2
Connect the other end of the power cable to the indoor DC power supply cabinet or
power distribution box. Connect the blue strand to the -48V terminal and the black one to
the -48V GND terminal (see Figure 2).
3
Lay the power cable (the power cable can be bundled with the PGND cables) as follows:
a). Bind the power cable along the left side of the simple installation bracket toward the
wall, and lead the power cable to the cable tray vertically along the PVC cable trough
(see Figure 3).
b). Lay the power cable vertically along the left side of the 19-inch standing installation
rack or RRU standing installation rack, and bind the power cable once at an interval of
100mm (see Figure 4).
4
Key Points and Precautions
1
The B8200 special power cable is a 3-strand black cable. It contains one blue strand
and one black strand (2×2.5mm2) as well as an idle strand that has insulating
pretreatment.
2
Figure 3
Installation Tools
cross screwdriver
diagonal pliers
1
adjustable wrench
2
Figure 4
Installation Materials
B8200 special power cable,
containing one blue and one black
strands (2×2.5mm2)
white ties
Confidential and Proprietary Information of ZTE CORPORATION.
3
4
42
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
8.1.2 Connecting & Distributing DC Power Cable (for BC8180)
Installation Steps
1
2
3
For the BC8180 cabinet, first move the sliding gaskets at the left and the right sides at
the cabinet bottom with a cross screwdriver to extend the aperture and make the cable
connectors smoothly enter the cabinet. After all cables are distributed, move the gaskets
to the original places (see Figure 1).
Lead the special power cable into the cabinet from the cabinet bottom, and insert one
end of the cable into the PM module and tighten the screw (see Figure 2 and 3).
Distribute the special power cable along the left side of the cabinet and bind it with the
ties in the cabinet (see Figure 4).
4
Figure 1
Figure 2
5
6
Key Points and Precautions
1
2
Figure 3
Installation Tools
cross screwdriver
diagonal pliers
3
1
Figure 4
Installation Materials
white ties
2
B8200 special power cable
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
43
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
Installation Steps
1
If the BC8180 cabinet adopts the AC power supply, it is required to install a power
switching unit (PSU).
2
Both ends of the B8200 special power cable have a special connector. Connect one end
to B8200 and the other end to PSU DC power port (at the left side of the module), lay the
cable along the left side of the cabinet, and bind the cable with ties in the cabinet (see
Figure 1).
Lead the AC power cable into the cabinet through the hole at the left side of the cabinet,
connect the cable to the PSU AC power port (3-core), lay it along the cabinet bottom,
and bind it with ties in the cabinet (see Figure 2).
3
4
Figure 1
Figure 2
8.1.3 Connecting & Distributing AC Power Cable (for BC8180)
One end of the input/output dry-contact-node cable is a DB9 connector. Connect the
DB9 connector to the monitor port at the PSU right side, and connect another end of the
cable to the dry-contact-node port of the SA cables for the B8200. Lay the cable along
the cabinet bottom and bind it neatly (see Figure 3 and 4).
5
6
Key Points and Precautions
Figure 3
Installation Tools
cross screwdriver
diagonal pliers
Figure 4
Installation Materials
1
PSU
2
Auxiliary AC/DC power cable and
monitoring cable
white ties
3
Confidential and Proprietary Information of ZTE CORPORATION.
1
Before connecting the AC power cable, switch OFF the PSU switch.
2
The input/output dry-contact-node cable is a customized cable. One end of the cable is a
DB9 connector and the other end is SB25 connector.
3
4
44
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
Installation Steps
1
2
3
Figure 1
8.1.4 Connecting & Distributing PGND Cable
Make the PGND cable terminals on the site. For details, see 9.1.1 Making DC Power
Cable & PGND Cable Terminals.
For the simple installation bracket, the 16mm2 yellow-green PGND cables are used.
Connect the copper lug of the PGND cable to the ground terminal of the simple
installation bracket, and the other end to the terminal of the indoor copper ground bar
(see Figure 1).
For the simple installation bracket, the connected PGND cable can be laid along the
PVC cable trough to the cable tray together with the DC power cable (see Figure 2).
4
The 19-inch standing installation rack and RRU standing installation rack have no GND
terminal. It is required to connect the copper lug of the PGND cable to the ground
terminal at the right side of B8200, connect the other end to the terminal of the indoor
copper ground bar, and tighten them with a cross screwdriver (see Figure 3).
5
For the 19-inch standing installation rack and RRU standing installation rack, the PGND
cable can be laid at the interior side of the left upright column together with the DC
power cable. After bundling the cables respectively, lead the PGND cable to the cable
tray (see Figure 4).
Figure 2
Key Points and Precautions
Figure 3
Installation Tools
cross screwdriver
diagonal pliers
adjustable wrench
1
Figure 4
Installation Materials
16mm2 yellow-green PGND cable
2
white ties
1
Because the simple installation bracket has a ground point, there is no need to add
another PGND cable.
2
Because the 19-inch standing installation rack and RRU standing installation rack have
2
no ground terminal, the 16mm yellow-green cable can serve as the B8200 PGND cable
by connecting the B8200 to the indoor ground bar. Otherwise, the ground bus bar can be
installed at the flank side of the installation rack, and in this case the engineer should
lead the B8200 PGND cable to the grounding terminal of the ground bus bar and
connect the ground bus bar with the indoor ground point.
3
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
45
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
Figure 1
Figure 2
8.1.5 Connecting & Distributing PGND Cable (for BC8180)
Installation Steps
1
Make the PGND cable terminals on the site. For details, see 9.1.1 Making DC Power
Cable & PGND Cable Terminals.
2
For the BC8180 cabinet, a short PGND cable is delivered with the cabinet. Connect the
copper lug of the PGND cable to the ground point at the left side of the B8200, and
tighten the screw with a cross screwdriver (see Figure 1).
3
The BC8180 cabinet contains a built-in ground bar. Connect the other end of the short
PGND cable to one terminal of the built-in ground bar in the cabinet. Also tighten the
screw with a cross screwdriver (see Figure 2).
4
The ground terminal of the BC8180 cabinet is at the left side of the cabinet bottom.
Remove the nut and washer from the ground point with an adjustable wrench (see
Figure 3).
Add the washer, 16mm2 yellow-green PGND cable, and nut in sequence to the ground
point, and screw down the nut with an adjustable wrench (see Figure 4).
5
6
Key Points and Precautions
1
2
Figure 3
Installation Tools
cross screwdriver
adjustable wrench
1
Figure 4
Installation Materials
16mm2 yellow-green PGND cable
2
3
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
46
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
Installation Steps
1
Connect the SCSI50 connector of the SA cable to the SA panel, and tighten the fixing
screws with a screwdriver (see Figure 1).
2
Connect the short ground cable of the SA cable to the B8200 ground terminal, and
tighten the screw with a cross screwdriver (see Figure 2).
3
The other end of the SA cable provides three connectors (E1, RS232, and
dry-contact-node connectors). Hide the SA cables and the three connectors in the cable
trough below B8200, bundle the cables and lead them rightward, and distribute the
cables along the right side.
Figure 3 shows how to distribute the SA cable on the simple installation bracket and
RRU standing installation rack.
Figure 4 shows how to distribute the SA cable on the 19-inch standing installation rack.
4
Figure 1
Figure 2
8.1.6 Connecting & Distributing SA Cable
5
Key Points and Precautions
1
The E1 connector of the SA cable should be connected to the E1 cable. Decide whether
to connect the dry-contact-node and RS232 connectors according to the onsite
demands.
2
Figure 3
Installation Tools
cross screwdriver
diagonal pliers
Figure 4
Installation Materials
1
white ties
2
SA cables
3
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
47
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
8.1.7 Connecting & Distributing SA Cable (for BC8180)
Installation Steps
1
Connect the SCSI50 connector of the SA cable to the SA panel, and tighten the fixing
screws with a screwdriver (see Figure 1).
2
Connect the short ground cable of the SA cable to one ground terminal in the BC8180
cabinet, and tighten the screw with a cross screwdriver (see Figure 2).
3
The other end of the SA cable provides three connectors (E1, RS232, and
dry-contact-node connectors). Neatly arrange the SA cable and three connectors, and
lead the cable along the left side to the cabinet bottom (see Figure 3).
4
Figure 1
Figure 2
5
6
Key Points and Precautions
1
2
Figure 3
Installation Tools
cross screwdriver
Installation Materials
1
3
SA cables
2
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
48
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
Figure 1
Figure 2
8.1.8 Connecting & Distributing E1/RS232 Cables
Installation Steps
1
According to the labeling condition of the E1 cables, find the E1 cables of Pair 1 to 4 at
the other end to match the SA E1 cable (see Figure 1).
2
The connectors of the 75ohm E1 cable must be made on the site and connected to the
DDF. Refer to 9.1.2 Making 75ohm E1 Cable Connectors to learn how to make the
connectors. The 120ohm E1 cable should be connected to DDF through a wire clamp.
3
Connect the E1 cable and RS232 cable respectively to corresponding connectors of the
SA cable (see Figure 2).
4
For the simple installation bracket, all the cables and fibers are laid along the PVC
trough on the wall, and then led downward from the right side of the simple installation
bracket and through the cable trough at the bracket bottom. After the FE cable and
outdoor fibers are connected, bundle the SA cables together with them at the right side
(see Figure 3).
For the 19-inch standing installation rack and RRU standing installation rack, all the
cables and fibers are laid from the interior side of the right-upright column and led to the
cable trough at the B8200 bottom. After the FE cable and outdoor fiber are connected,
bundled the SA cables together with them (see Figure 4).
5
Key Points and Precautions
Figure 3
Installation Tools
diagonal pliers
cross screwdriver
1
E1 cables fall into 2 categories: 75ohm and 120ohm. Usually the 8-pair 75ohm E1 cable
is used in China. One end of the cable is a DB44 connector while the other one divides
into 2 cables (each cable has 8 cores [Core 1 to 8] and each cable supports 4 pairs of E1
links).
2
1
Figure 4
Installation Materials
white ties
2
E1 cable (75/120ohm)
3
3
RS232, dry contact node cables
120ohm E1 cables also fall into 2 categories: 4-pair and 8-pair. One end is the DB44
connector while the other end is one 4-pair cable or two 4-pair E1 cables. Each 4-pair
cable has 8 cores (Core 1 to 8) and supports 4 pairs of E1 links. The connector at the
DDF side is connected through a wire clamp.
If the B8200 and R8840 both adopt the indoor installation, decide whether to use the
input/output dry-contact-node cable and RS232 cable according to the actual conditions.
4
cables
Confidential and Proprietary Information of ZTE CORPORATION.
49
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
Installation Steps
1
2
3
4
Figure 1
Figure 2
8.1.9 Connecting & Distributing Outdoor Optical Fibers
5
6
If the optical interface of the FS module is not fitted with an optical module, install an
optical module. Note that the blue handle should face upwards. Insert the optical module
tightly.
Make temporary labels at both ends of the outdoor fiber according to the optical module
directions and sectors, and connect the outdoor fiber to the TX and RX interface of the
FS module. Please note that you should insert the fiber in the direction of the optical
module. After connecting the fiber correctly, you can hear a “KA” sound (see Figure 1).
Reserve an enough bending radius when the outdoor fiber is laid to the cable trough
(see Figure 2).
For the simple installation bracket, all the cables and fibers are laid along the PVC
trough on the wall, led downward from the right side of the simple installation bracket
and through the cable trough at the bracket bottom. After other cables are connected,
bundle the outdoor fiber together with them (see Figure 3).
For the 19-inch standing installation rack and RRU standing installation rack, all the
cables and fibers are laid from the interior side of the right-upright column and led to the
cable trough at the B8200 bottom. After other cables are connected, bundle the outdoor
fiber together with them (see Figure 4).
When the outdoor fiber is laid indoors, the outdoor fiber should be long enough for
cabling in the cable trough. Do not place heavy objects or other heavy cables on the
outdoor fiber. The redundant outdoor fiber should be coiled and placed neatly under
R8840 or nearby.
Key Points and Precautions
Figure 3
Installation Tools
1
Figure 4
Installation Materials
outdoor optical fibers, whose length
depends on the survey result
1
Before the FS board is delivered, the required optical modules usually have been built
in.
2
After the equipment is powered on, do not look into the optical module to protect your
eyes from being damaged.
3
Connect the outdoor fibers to B8200 correctly according to the correspondence between
the outdoor fibers and sectors. For example, the outdoor fiber of the first sector is
connected to TX0 and RX0 (at the right side of the FS board) of the first port on the FS
panel, and the others follow the same rule.
4
The other end of the outdoor fiber should be connected to the LC1 interface of the
R8840.
2
3
Confidential and Proprietary Information of ZTE CORPORATION.
50
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
Installation Steps
1
The RJ45 connectors of the FE cable should be made on the site. For details, refer to
9.1.4 Making RJ45 Connector of the FE Cable.
2
Connect one end of the FE cable to the eth0 RJ45 port on the CC panel and the other
end to the optical terminal equipment (see Figure 1).
3
For the simple installation bracket, the FE cable is laid along the PVC trough on the wall,
led downward from the right side of the simple installation bracket and through the cable
trough at the bracket bottom. And then bundle it together with the
E1/RS232/dry-contact-node cables and outdoor fibers, and the interval should be
100mm (see Figure 2).
Figure 3 shows the general cabling layout of the simple installation bracket.
4
Figure 1
Figure 2
8.1.10 Connecting & Distributing FE Cable
5
6
For the 19-inch standing installation rack, the FE cable is laid from the interior side of the
right-upright column and led to the cable trough at the B8200 bottom. And then bundle it
together with the E1/RS232/dry-contact-node cables and outdoor fibers, and the interval
should be 100mm (see Figure 4).
For the RRU standing installation rack, the FE cable is laid along the right-upright
column and led to the cable trough at the bottom of the simple installation bracket. And
then bundle it together with other cables, and the interval should be 100mm.
Key Points and Precautions
1
2
Figure 3
Installation Tools
diagonal pliers
1
2
Figure 4
Installation Materials
Category-5 unshielded Ethernet
cable
white ties
3
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
51
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Steps
Installation Figures
Figure 1
8.1.11 Connecting & Distributing BC8180 Transmission Cable
Figure 2
1
For the BC8180 cabinet, the E1 cable, FE cable and outdoor optical fibers all enter the
cabinet through the cable hole at the right side of the cabinet bottom (see Figure 1).
2
Connect the E1 cable to the E1 port of the SA cable, and lay them at the bottom of the
cabinet (see Figure 2).
3
Connect the FE cable to the eth0 RJ45 port on the CC panel and the outdoor optical
fibers to corresponding optical ports on the FS board.
4
Lay the FE cable and the outdoor optical fiber along the right side of the cabinet, and
bundle them with the ties in the cabinet (see Figure 3).
5
Lead the cables at both the left and the right side of the BC8180 cabinet along the
cabinet bottom to the wall, and then lay them along the PVC cable trough at both sides
to the indoor cable tray.
6
Figure 4 shows the general layout of an installed BC8180 cabinet.
Key Points and Precautions
1
Connect the outdoor fibers to B8200 correctly according to the correspondence between
the outdoor fibers and sectors. For example, the outdoor fiber of the first sector is
connected to TX0 and RX0 (at the right side of the FS board) of the first port on the FS
panel, and the others follow the same rule.
2
Figure 3
Installation Tools
cross screwdriver
diagonal pliers
1
2
Figure 4
Installation Materials
E1 cables
3
Category-5 unshielded
cable
outdoor optical fibers
4
white ties
Confidential and Proprietary Information of ZTE CORPORATION.
3
Ethernet
4
52
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.1 Cable Connection at the B8200 Side
Installation Figures
8.1.12 Connecting Antistatic Bracelet
Installation Steps
1
Insert the antistatic bracelet into the hole in the middle-right part of B8200 (see Figure 1).
2
Fix the antistatic nipper to the installation rack (or post) at the right side (see Figure 2).
3
For the BC8180 cabinet, place the antistatic bracelet at the right side of the cabinet (see
Figure 3).
4
Figure 1
Figure 2
5
6
Key Points and Precautions
1
2
Figure 3
Installation Tools
Installation Materials
3
1
2
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
53
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.2 Connection & Distribution of Cables for Power Distribution Box
8.2.1 Connecting & Distributing Cables for DC Power Distribution Box
Installation Steps
2
Installation Figures
Figure 1
Figure 2
1
Remove 8~10mm of the cable sheath from one end of the 16mm blue DC power cable
with a wire stripper or knife. And make the same operation on the 16mm2 black DC
power cable and the PGND cable (see Figure 1).
2
Insert the naked core wires of the PGND cable into a hole of the ground bar at the left of
the DC power distribution box, and tighten the wires with a cross screwdriver (see Figure
2).
3
Lead the blue and black DC power cables into the box respectively through the cable
holes at the top of the DC power distribution box (see Figure 3).
4
Connect the blue and black power cables to the corresponding input ends of the DC
power distribution box, and then tighten them with a cross screwdriver (see Figure 4).
5
The PGND and power cables shall all be laid along the PVC troughs on the wall and led
into the cable tray. Besides, the PGND cable and the power cables shall be laid
separately in the cable tray and they shall not be bundled with other cables.
6
Key Points and Precautions
Figure 3
Installation Tools
wire stripper
knife
1
cross screwdriver
2
1
During the cable connection, first connect the PGND cable and then other cable. During
the disconnection, the PGND cable should be the last one to be disconnected.
2
Before the PGND cable is connected, arrange its core wires neatly to make sure all the
wires are close to each other. It is prohibited to expose any core wire in the air after the
core wires are inserted into the wiring hole.
The power cable between the DC power distribution box and the DC power cabinet
should be either a blue power cable plus a black power cable or 2-core unshielded
cable.
Figure 4
Installation Materials
16mm2 yellow-green PGND cable
3
16mm2 blue and black DC power
cables
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
54
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.2 Connection & Distribution of Cables for Power Distribution Box
Installation Figures
Installation Steps
1
Remove 8~10mm of the cable sheath from one end of the AC power cable (containing a
brown cable, a blue cable and a black cable) with a wire stripper or knife.
2
Lead the AC power cable into the power distribution box through the cable hole at the
top of the power distribution box, connect the brown cable, blue cable and black cable
respectively to corresponding input ends of the power distribution box, and tighten the
screw with a cross screwdriver (see Figure 1).
Similar to Step 2, connect the RRU AC power cables to the output ends of the power
distribution box. During the connection, conform to the connection in Figure 2 and pay
attention to the port L, N, and GND.
3
4
Figure 1
Figure 2
8.2.2 Connecting & Distributing Cables for AC Power Distribution Box
For the AC power distribution box, insert the PGND (black) cable of the AC power cable
to a hole of the ground bar at the left side of the box, and tighten the screw with a cross
screwdriver (see Figure 3).
5
Key Points and Precautions
1
The core wires of the AC power cable should all be arranged neatly before they are
inserted to the cable holes. It is prohibited to expose any core wire in the air.
2
Installation Tools
Installation Materials
wire stripper
knife
1
cross screwdriver
Heat gun
2
3
AC power cable (containing a
brown cable, a blue cable and a
black cable)
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
55
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.3 Connecting the Cables at the R8840 Side
8.3.1 Connecting the DC Power Cable
Installation Steps
Installation Figures
1
If DC power supply is used for the R8840, four special 1.5mm2 DC power cables
are used (including two blue power cables and two black power cables) (see
Figure 1).
2
Connect the special interface of the special power cables to the PWR interface at
the bottom of the R8840 (Note: The red marking point should be targeted at the
mark of the PWR interface), and then tighten the connector (see Figure 2).
3
Respectively strip 8~10mm of cable sheaths from the two blue power cables and
two black power cables at the other end with a wire stripper or knife (see Figure 3).
4
Connect the other end to the power output end of the DC power distribution box
(connect the two blue power cables to the 48V terminal, and connect the two
Figure 1
black power cables to the 48V GND terminal), fix the power cables tightly by using
Figure 2
the clip in the box, and tighten the fastening screw at the power output end with a
cross screwdriver (see Figure 4).
Key Points and Precautions
1
2
Figure 3
Figure 4
Installation Tools
Installation Materials
wire stripper
knife
cross screwdriver
diagonal pliers
1
3
R8840 special DC power cable,
whose specification is 4×1.5mm
2
2
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
56
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.3 Connecting the Cables at the R8840 Side
Installation Figures
8.3.2 Connecting the AC Power Cable
Installation Steps
2
If AC power supply is used for the R8840, three special 1mm AC power
1
cables are used (the brown cable is the live wire (L), the blue cable is the
null wire (N), and the black cable is the GND cable) (see Figure 1).
2
Connect the special interface end of the special AC power cables to the
PWR interface at the bottom of the R8840 (Note: The red marking point
should be targeted at the mark of the PWR interface), and then tighten the
connector
3
At the other end, strip the 8~10mm of sheaths from the three cables with a
wire stripper or knife. Handle the outdoor AC power cable in the same way.
Figure 1
Figure 2
4
Connect the other end to the power output end of the AC power distribution
box (connect the brown power cable to the L terminal, connect the blue
power cable to the N terminal, and connect the black power cable to the
GND terminal), fix the power cables tightly with the clip in the power
distribution box, and tighten the fastening screw at the power output end
with a cross screwdriver (see Figure 2).
Key Points and Precautions
1
You need to apply waterproof treatment to all interfaces of the R8840. For
details, see the content on waterproof treatment for equipment interfaces.
Installation Tools
wire stripper
knife
Installation Materials
1
R8840 special AC power cable, whose
specification is 3×1.0mm
cross
diagonal pliers
2
2
You need to cut off the redundant alarm cables.
2
screwdriver
Confidential and Proprietary Information of ZTE CORPORATION.
57
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.3 Connecting the Cables at the R8840 Side
Installation Figures
8.3.3 Connecting the Rack-Top Jumper (A)
Installation Steps
1
The R8840 is configured with two ports, which are connected to each other through
the rack-top jumper (see Figure 1).
2
Plug the N-type feeder connector of one feeder cable to the RF cable interface of
the transmit/receive diversity (RX/TX) in the lower part of the R8840, and tighten
the feeder connector by using the wrench (see Figure 2).
3
Plug the N-type feeder connector of another feeder cable to the RF cable interface
of the receive diversity (TX) in the lower part of the R8840, and tighten the feeder
connector by using the wrench (see Figure 3).
4
Figure 1
(to be continued in next page)
Figure 2
Key Points and Precautions
1
(See next page)
2
Figure 3
Installation Tools
(See next page)
1
Installation Materials
(See next page)
2
3
Confidential and Proprietary Information of ZTE CORPORATION.
3
58
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.3 Connecting the Cables at the R8840 Side
Installation Figures
Figure 1
4
8.3.3 Connecting the Rack-Top Jumper (B)
Installation Steps
R8840 feeder grounding principles:
a) If the feeder is shorter than 5m, it does not need grounding.
b) If the feeder is longer than 5m but shorter than 10m, it is required to ground at
one point, and the ground point is at the antenna side and within 2m from the
antenna-feeder connector.
c) If the feeder is longer than 10m but shorter than 20m, it is required to ground
at two points, one point within 2m from the R8840 feeder connector and the
antenna-feeder connector.
d) If the feeder is longer than 20m and shorter than 60m, it is required to add
one ground point within 2m from the point where the feeder leaves the tower
or the rooftop.
e) If the feeder is longer than 60m, it is required to add one more ground point
for each 20 more meters.
Figure 2
Key Points and Precautions
1
You need to apply waterproof treatment to all interfaces of the R8840. For details,
see 8.5.1 Waterproof Measures for Equipment Connectors.
2
The R8840 is usually installed close to the antennas. The following materials are
selected:
a. When the feeder cable between the R8840 and the antenna is less than 5 m in
length, you can select the fixed-length 1/2” rack-top jumper or make the jumper on
site (for details on how to make the jumper, refer to the manual provided by the
manufacturer).
Figure 3
Installation Tools
adjustable wrench
b. When the feeder cable between the R8840 and the antenna is less than 20 m in
Installation Materials
1
length, you need to select the 1/2” feeder cable.
R8840 special rack-top jumpers
c. When the feeder cable between the R8840 and the antenna is more than 20 m
2
but less than 60 m in length, you need to select the 7/8” feeder cable.
3
d. When the feeder cable between the R8840 and the antenna is more than 60 m
in length, you need to select the 5/4” feeder cable.
3
At the connection position of the feeder cable, you do not need to install a lightning
arrester.
Confidential and Proprietary Information of ZTE CORPORATION.
59
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.3 Connecting the Cables at the R8840 Side
8.3.4 Connecting the Outdoor Optical Fiber
Installation Steps
Installation Figures
1
Before plugging the R8840 end of the optical cable to the LC interface of the
R8840, remove the white protective cap.
2
Target the red mark upwards at the interface. After plugging the R8840 end
properly, you can hear a “click” sound. Finally, tighten the protective cap (see
Figure 1 and Figure 2).
3
Connect the other end to the TX/RX interface of the FS module according to the
mapping between the optical module directions and sectors.
4
Figure 1
Figure 2
5
6
Key Points and Precautions
1
2
Installation Tools
Installation Materials
1
outdoor
optical
fibers,
whose
3
lengths and specifications depend
on the survey result
2
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
60
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.4 Bundling and Distributing Indoor Cables in the Cable Tray
Installation Figures
8.4.1 Bundling and Distributing Indoor Cables in Cable Tray
Installation Steps
1
On the indoor cable tray, the DC power cable should be separated from the AC power cable (they
should stay at least 50mm away from each other), the DC power cable should be separated from
the unshielded signal cable (they should stay at least 50mm away from each other if they are laid
in parallel), and the AC power cable should be separated from the unshielded signal cable (they
should stay at least 150mm away from each other if they are laid in parallel).
2
Cables must be bound closely, and appear to be straight and orderly.
3
Cable ties should be distributed at regular intervals to ensure the tightness of cables. The interval
between cable ties should be consistent with the interval between cable trays (usually, 300 to 700
mm).
The redundant cable ties should be cut off. The indoor cable ties must be cut to the same length
from the bottom. Black cable ties cannot be confused with white cable ties. The indoor cable ties
should be white ties.
4
5
The redundant cable ties should be cut off. The indoor cable ties must be cut to the same length
from the bottom. Black cable ties cannot be confused with white cable ties. The indoor cable ties
should be white ties.
6
The power cables (including the GND cable) and signal cables are laid at two sides of the cable
tray respectively.
Key Points and Precautions
Installation Tools
diagonal pliers
1
Installation Materials
white ties
Confidential and Proprietary Information of ZTE CORPORATION.
1
The cable routes should meet the project design requirements.
2
Different types of cables should be laid separately from each other. Cable should be routed
clearly and straightly. Cables should not intersect each other. Cables should be bound tightly to a
moderate extent.
3
61
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.5 Waterproof Measures for Equipment Connectors
Installation Figures
Figure 1
Figure 2
8.5.1 Waterproof Measures for Equipment Connectors (A)
Installation Steps (to be continued in next page)
1
Before the waterproof treatment, firstly clean off the dusts and dirt from the connector.
2
Firstly wrap the PVC insulating tape from the bottom upward. The upper layer covers 1/2
of the lower layer. PVC insulating tape should cover the entire feeder connector so that
the waterproof insulating tape will not adhere to the connector (see Figure 1).
3
Then wrap the waterproof insulating tape. Unfold the waterproof insulating tape, remove
the release paper and paste the tape end to the point 20~50mm under the connector
(with the gelatinous layer inward) (see Figure 2).
4
Stretch the waterproof insulating tape evenly to make its width shrink to 75%~50% of the
original width and keep certain elasticity. Wrap the connector from the bottom upward.
The upper layer covers 1/2 of the lower layer (see Figure 3).
5
When the waterproof insulating tape reaches 20~50mm above the connector, wrap from
the top downward to 20~50mm beneath the connector in the same way, and finally wrap
from the bottom upward again. Therefore, 3 layers of waterproof insulating tape are
required (see Figure 4-5). (to be continued in next page)
Key Points and Precautions
1
(See next page)
2
Figure 3
Installation Tools
(See next page)
Figure 4
1
Installation Materials
(See next page)
Confidential and Proprietary Information of ZTE CORPORATION.
3
62
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.5 Waterproof Measures for Equipment Connectors
Installation Figures
Figure 5
8.5.1 Waterproof Measures for Equipment Connectors (B)
Installation Steps (follow the previous page)
6
After 3 layers of waterproof insulating tape are wrapped, press the tape layers with
hands to make sure there is no air between the layers (see Figure 6).
7
And then wrap the PVC insulating tape from the bottom upward. Both ends should cover
20mm more from those of the waterproof insulating tape layer. The upper layer should
cover 1/2 of the lower layer. 3 layers of PVC insulating tape should be wrapped in the
sequence: from the bottom upward, from the top downward and finally from the bottom
upward (see Figure 7).
8
Bind both ends tightly with black ties after the wrapping (see Figure 8).
Figure 6
Key Points and Precautions
Figure 7
scissors
Installation Tools
diagonal pliers
1
Waterproof measures should be taken for antenna-jumper connectors, jumper-feeder
connectors, ground points between feeders and ground clips, ground points of the
outdoor cable ground clips, all R8840 connectors (including the feeder connectors,
power connectors, optical connectors, monitoring connectors, AISG connectors, etc.).
2
During the wrapping process, do not stretch the tape too much.
Figure 8
Installation Materials
PVC insulating tape
3
1
The antenna-jumper connector must be wrapped from the bottom upward. And after the
wrapping, both ends of the tape should be bond with black ties.
2
waterproof insulating tape
4
3
black ties
The wrapping direction should be the same as the connector screwing direction. It is
prohibited to wrap in the reserve direction.
4
Confidential and Proprietary Information of ZTE CORPORATION.
63
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.6.1 Checking B8200 Equipment Power-up/Power-down
8.6 Checking B8200&R8840 Equipment Power-up/Power-down
Installation Figures
Installation Steps
1
Check if the PGND cable at the equipment side has been connected correctly. And
check if the DC power cables at the DC power supply cabinet side have been
connected correctly (the polarities shall not be reverse).
2
Check and make sure the power switches at the DC power supply cabinet side are
in the OFF state (see Figure 1).
3
Use a multimeter to test if the voltage at the DC power supply cabinet side is
normal (see Figure 2). If it is normal, power up the DC power supply cabinet (turn
ON the power switch).
4
Check if the B8200 fan runs normally and check the states of the board and
module LED indicators (see Figure 3).
Figure 1
Figure 2
5
After the power-up check, turn OFF the power supply at the DC power supply
cabinet side.
Key Points and Precautions
1
The normal voltage at the DC power supply cabinet side ranges from -40V DC to
-57V DC.
2
Observe the fan module and board LED indicators to judge the running status.
Figure 3
Installation Tools
cross screwdriver
multimeter
Installation Materials
1
2
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
64
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
8.6.2 Checking R8840 Equipment Power-up/Power-down
8.6 Checking B8200&R8840 Equipment Power-up/Power-down
Installation Figures
Installation Steps
1
Check if the DC power cables and the PGND cable at the DC ILP/OLP side and the
R8840 side have been connected correctly.
2
Check and make sure the power switches at both the DC power supply cabinet
side and the ILP side are in the OFF state.
3
Use a multimeter to test if the voltage at the DC power supply cabinet side is
normal. If it is normal, power up the DC power cabinet (turn ON the power switch).
4
Use a multimeter to test if the input voltage at the DC ILP side is normal (see
Figure 1). If it is normal, turn ON the R8840 power switch in the DC ILP (see Figure
2).
Figure 1
Figure 2
5
6
Open the DC OLP with a socket wrench and use a multimeter to test if the input
voltage is normal (see Figure 3).
If it is normal, wait for 5 minutes and touch the R8840 top to feel the heat. If there is
heated, it indicates the equipment is running normally (see Figure 4).
7
After the power-up, turn OFF the power switches of DC ILP and DC power supply
cabinet one by one.
Key Points and Precautions
1
The normal voltages at the DC power supply cabinet side and the DC ILP/OLP side
range from -40V DC to -57V DC.
2
Figure 3
Figure 4
Installation Tools
Installation Materials
cross screwdriver
socket wrench
multimeter
If R8840 adopts AC power supply, refer to Installation Steps on this page.
3
1
2
4
3
Confidential and Proprietary Information of ZTE CORPORATION.
65
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Chapter 9 Making Cable Connectors and Labeling
Confidential and Proprietary Information of ZTE CORPORATION.
66
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
9.1 Making Cable Connectors
Installation Steps
Installation Figures
Figure 1
9.1.1 Making DC Power Cable & PGND Cable Terminals
Figure 2
1
Remove about 15mm of the power cable sheath from one end of the cable. Trim the
core wires with diagonal pliers (see Figure 1).
2
Cover the core wires with a matching copper lug (see Figure 2).
3
Use the multifunction crimping pliers to firmly crimp the copper lug. It the core wires can
move in the lug, crimp the lug again (see Figure 3).
4
Cover the copper lug with the same color of heat-shrink sleeve, that is, the blue DC
power cable should be covered with the blue heat-shrink sleeve.
5
Heat the heat-shrink sleeve with a heat gun to make it tightly wrap the crimping joint (see
Figure 4).
6
Key Points and Precautions
1
The PGDN cable terminals are made in the same way as the DC power cable terminals.
Please note the color of the heat-shrink sleeve must be the same as that of the cable.
2
Figure 3
Installation Tools
wire stripper
multifunction
crimping pliers
heat gun
Figure 4
3
1
Installation Materials
DC power cable
2
PGND cable
4
3
matching copper lugs
4
heat-shrink sleeve
Confidential and Proprietary Information of ZTE CORPORATION.
67
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
9.1 Making Cable Connectors
Installation Steps
Installation Figures
Figure 1
9.1.2 Making 75ohm E1 Cable Connectors
Figure 2
1
Take a strand from the 75ohm E1 cable. Remove about 10mm of its sheath with a wire
stripper to expose the inner sheath (see Figure 1).
2
Let the 75ohm E1 terminal go through the rear cover and the fastening ring.
3
Remove about 5mm of the inner sheath with a wire stripper to expose the inner core
wire. Let the 75ohm E1 terminal go through the hole in the front cover of the connecting
terminal (see Figure 2).
4
Weld the metal part of the hole and the core wire securely with an electric iron and a
soldering tin thread (see Figure 3).
5
Hold the fastening ring against the rear end of the front cover and crimp the strand with
the multifunction crimping pliers. (see Figure 4)
6
Screw down the front cover the rear cover of the connecting terminal.
Key Points and Precautions
1
2
Figure 3
Installation Tools
wire stripper
multifunction
crimping pliers
electric iron
soldering
tin
thread
Figure 4
1
2
Installation Materials
75ohm E1 cable
connecting terminals for 75ohm E1
cable
3
4
3
Confidential and Proprietary Information of ZTE CORPORATION.
68
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
9.1 Making Cable Connectors
Installation Steps
Installation Figures
Figure 1
9.1.3 Clamping 120ohm E1 Cable
Figure 2
1
Every 10 strands of the 120ohm E1 cable form a circle. See Figure 1, the 1st circle from
bottom
upward
are
blue/red,
blue/black-pink/red,
pink/black-green/red,
green/black-orange/red, orange/black-gray/red, and gray/black.
2
Every strand in the 1st circle is marked with 1 red point, and every strand in the 2nd
circle is marked with 2 red points. Other circles adopt the same rule.
3
Clamp every wire into the corresponding slot. Make sure the wire clamp is facing the
correct direction (the cutting edge faces inward). Press the clamp post downward and
the wire will be clamped after a sound of “KA”. The redundant wire will be cut off
automatically (see Figure 2).
4
5
Key Points and Precautions
1
Determine how to connect the 120ohm E1 cable to DDF according to the conditions on
the site.
2
Installation Tools
wire clamp
1
Installation Materials
120ohm E1 cable
2
3
4
3
Confidential and Proprietary Information of ZTE CORPORATION.
69
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
9.1 Making Cable Connectors
Installation Steps
Installation Figures
Figure 1
9.1.4 Making FE Cable Connectors
Figure 2
1
Remove 20mm~30mm of the sheath with a wire stripper or some other tool to expose
the core twisted-pair wires, Cut off the anti-stretch thread (see Figure 1).
2
According to the 568B standard, if the RJ45 sheet metal faces upward, the wires from
left to right are white-orange, orange, white-green, blue, white-blue, green, white-brown,
and brown (see Figure 2).
3
Trim the core wires with a wire stripper or some other tool and leave about 14mm
outside the sheath. Arrange them in the correct order.
4
Insert the core wires into the RJ45 connector pins and push them against the inner end
of the RJ45 connector (see Figure 3).
5
Check if every wire is in the correct position and clamp the RJ45 connector with the
multifunction crimping pliers (see Figure 4).
6
After the cables are made, use the RJ-45 cable gauge to check if the FE cables are
made up to the standard.
Key Points and Precautions
Figure 3
Installation Tools
multifunction
wire stripper
crimping pliers
1
In Step 3, the naked core wires should not be too long. Otherwise the sheath may not be
clamped in the RJ45 connector and the wires may become flexible later.
2
After inserting the core wires to the RJ45 connector, it is required to check and make
sure the core wires have reached the top end in the connector.
Figure 4
1
2
Installation Materials
Category-5 unshielded Ethernet
cable
RJ45 connectors
3
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
70
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
9.1 Making Cable Connectors
Installation Steps
Installation Figures
Figure 1
9.1.5 Making Feeder Connectors
Figure 2
1
Remove about 29mm of the feeder sheath with a feeder connector cutter or a knife and
expose the metal part. Use a brush to clean off the dusts after the cutting (see Figure 1).
2
Apply grease to the metal part. Let the rear cover of the connector go through the metal
part and make the spring ring against the external metal part of the feeder (see Figure
2).
3
Move the rear cover of the connector to the front part until the spring ring against the
external metal part. Remove the dust and sharp edges in the cross section (see Figure
3).
4
Take out the front cover of the connector. Connect the inner conductor in the connector
to the feeder core, push the connector and make sure the connector and the feeder
contact securely.
Screw the rear cover of the connector to make it contact the screw thread in the
connector.
5
6
Fix the connector and the rear cover firmly. All the feeder connectors must have
waterproof measures. Refer to 8.5.1 Waterproof Measures for Equipment
Connectors for detailed information (see Figure 4).
Key Points and Precautions
1
Here takes the straight 7/16-inch DIN coaxial connector and the 7/8-inch feeder as the
example to illustrate how to make the feeder connector. Refer to the above steps when
making other types of feeder connectors.
2
Figure 3
Installation Materials
feeders
3
1
brush
2
matching feeder connectors
4
feeder connector cutter (optional)
3
knife
Installation Tools
2
adjustable
wrenches
Figure 4
Confidential and Proprietary Information of ZTE CORPORATION.
71
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
9.2 Labeling
Installation Figures
9.2.1 Outdoor Labeling
Installation Steps
1
All the labels should be ZTE private labels.
2
Paste labels at both ends of the rack-top jumpers: one point 200mm from the master
feeder connector and one point 200mm from the BS8800 rack top.
3
Paste labels at both ends of the -48V DC power cable, -48VGND DC power cable, and
the ground cable. At the power supply cabinet side, the labels should be 20mm from the
power terminals; at the ground bar side, the labels should be 20mm from the ground
terminals.
Paste labels at both ends of the optical fibers, network cables, and trunk cables. The
labels should be 20mm from the cable ends.
4
5
The labels should face a consistent direction, with the side indicating the outgoing
direction upward or facing the operations and maintenance panel, to facilitate reading.
Key Points and Precautions
Installation Tools
1
Installation Materials
paper labels
2
1
Labels fall into two categories: printed paper labels (used indoors) and tags (used
outdoors).
2
It is prohibited to paste labels or write on the boards. If the writing is required, the
handwriting must be neat and the labels must be pasted tidily.
3
4
3
4
Confidential and Proprietary Information of ZTE CORPORATION.
72
ZXSDR B8200&R8840 (V4.0) NodeB Engineering Installation Guide (BBU Indoors & RRU Indoors) V1.0
Procedure
Item
9.2 Labeling
9.2.2 Outdoor Labeling
Installation Steps
Installation Figures
1
All the labels should be ZTE private outdoor labels in complete sets (see Figure 1).
2
Paste labels at both ends of the outdoor antenna jumpers and rack-top jumpers. The
labels should be 200mm from the jumper connectors.
3
A master feeder must have at least 3 labels: 2 labels 200mm from the feeder connectors
at its both ends, 1 label 200mm from the feeder outlet before it enters the equipment
room, and 1 label 200mm from the point where it leaves the iron tower.
4
Paste clear labels at both ends of the outdoor cables and ground cables. The labels
should be 200mm from the cable ends.
5
Paste clear labels at both ends of the outdoor optical cables. The labels should be
200mm from the cable ends.
6
The outgoing directions indicated by the labels should be consistent with the actual
cable routes.
Key Points and Precautions
1
Labels of the master feeder are in a composite mode and the ZTE-WCDMA tags should
be used to identity the system.
2
Installation Tools
Installation Materials
1
3
tags
2
4
3
Confidential and Proprietary Information of ZTE CORPORATION.
73