INDU 421 FACILITIES DESIGN AND MATERIAL HANDLING SYSTEMS Project – 20 points The project is to be done in groups of maximum of 5 people. Collaboration between groups are not allowed. Students are required to design a plant layout for the production of one/more medical products/equipments related to COVID-19 that requires the assembly of a number of parts (between 10-15 components). While some parts will be produced in-house, some other parts need to be purchased from outside vendors. Students are free to choose their products however, instructors’ approval is required. For this project groups with 5 students will be established. Each group should include least one student who is confident in CAD programs and one more in simulation. The due date to submit your proposal for approval is on Friday, 24th September 2021. All reports should be typed. You are required to use software program for conducting the analysis, i.e., Arena, Cplex, python, excel etc. Deliverables and Deadlines: 1. (5 points) Progress report: Submission Deadline: Wednesday, November 10, 2021, 17:45, on Moodle. a. A 3-page summary of the progress you made. Submit on Moodle b. Show all initial results 2. (20 points) Final submission: Submission Deadline: Friday, November 26, 2021, 17:45, on Moodle. a. Final report showing your detailed analysis b. maximum 10 pages. c. Graph files, excel files, etc. d. PowerPoint presentation file. 3. (5 points) Project presentations: 15 minutes each group. Friday, December 3, 2021, 17:45 Late submissions will not be allowed. Purpose: o Design project allows you to apply the material you learnt in the class in a real facility planning project. Objective: o The objective is to design a plant layout for the production of some medical products/equipment’s related to COVID-19. o The selection of the product: Your product should involve an assembly of several parts (min 10 and max 15 components). You are free to choose your product, but my approval is required. Some of the examples of the products from the last years’ projects: Touch Liquid Hand Sanitizer. Teams: o This is a team work. Groups of 4-5 students should be established soon Project proposal: o This project should be addressed during the whole semester. You cannot complete such project during the last week. Start working on it as soon as possible. Project proposal should define your project early in the semester so that you can start working on the project soon. o Project proposal is a document of max 1 page including: the names of the members of your group the proposed product a brief description of your project (one paragraph is sufficient) Scope of your project: The project requires more than the design of a plant layout! Other issues which MUST be addressed are listed below: o Market analysis: Justify the production of your product o Product, process and schedule design Include at least one document related to process design o Vendors and suppliers selection Suppliers are the ones supplying you with raw material and/or parts: While most of the parts will be produced in-house, some parts need to be purchased from outside vendors. You have to include both inhouse produced and outsourced parts. Vendors are the ones who will be selling your product to the end customers. This means that you have to define your retailers (or wholesales). o Equipment and personnel requirements o Location selection You must use at least one facility location method o Plant layouts designs Include From-To Chart and/or Relationship Chart You need to produce several designs At least one design should be produced by FactoryCAD Selection of the best design Draw the final design with FactoryCAD o Materials handling o Life cycle analysis of both product and facility: What will happen to the product and to the facility in the long run? Presentation: o Your team will present the project in the last week of the course. o Everybody has to be present during the presentation and everybody has to participate (speak). Each team member should be ready to answer any question related to the project o Your presentation should take around 10-15 min (this will be specified later when the number of presenting teams is known). Longer presentations than the maximum length will be penalized. Reports: o Report describing your work in detail should be submitted at the time of the presentation of your team. o Soft copy of your report is required Introduction Objectives of facilities planning Product Design Exploded parts photographs Component part drawing-detailed Part List Bill of Material Process design Route sheet data requirement Assembly Charts Operation Process Chart Precedence Diagrams Schedule design Process Requirements: Input/Output analysis (Scrap estimates), Machine Requirement, Operator Requirement Identification of each equipment required by each operation Overall equipment requirements Facilities Design o o o o o o o o o o o o o o o o o o o o Affinity diagram Interrelationship diagram Tree diagram Matrix diagram Contingency diagram Activity network diagram Prioritization matrix Flow, space and activity relationships Manufacturing cell forming Direct clustering algorithm Binary Ordering Algorithm Cluster Identification algorithm Flow process chart Flow diagram From-To Chart Frequency chart Relationship Chart Relationship Diagram: Method 1 and/or Method 2 Space Requirements and Space relationship diagram Departmental Specification and areas requirements Material Handling Layout design one of Basic layout types o o o o o o o o o o Layout alternatives: Pairwise exchange method Graph-based method CRAFT MCRAFT LOGIC MULTIPLE with any sfc CORELAP ALDEP MIP o Simulation model to evaluate different layout