CPCCBC4002A Manage OH&S in the Building & Construction Workplace Assessment Task 3.1 - Write a SWMS Organisation Details Organisation Name: Lukas Builders Contact Name:: Taj ACN/ABN 018433 Contact Position: Employee Address: 80 Colier Drive Cudmirrah Contract Phone No: 0401070101 Project Details: Project: Replace rotten joists on back patio Area: Use of power tools, working at heights This SWMS has been developed in consultation with: Back of house Activity: Gavin Lukas Reviewed by: ________________________ (Note high risk tasks): Position: Boss __________________ Date: _27/1/21 / __ / Resources / Trades Involved: Carpenters Equipment Used: Nailgun, Circular saw, battery drill, reciprocator saw, Hand tools, correct ppe Maintenance checks: Chorded tools undergo mandatory check and tag if necessary Materials Used: timber posts, timber decking , timber joists, timber beams,shade cloth, bolts,bugel screws and nails. Work Health Safety or Environmental Legislation: © Master Builders Association Assessment Tools Nov 2018 V 2.0 Codes or Standards applicable to the works: managing the risks of falls at the workplace, managing electrical risks in the workplace CPCCBC4002A Manage OH&S in the Building & Construction Workplace Level H (1) (High level of harm) M (2) (Medium level of harm) Description of Consequence or Impact Consequence Likelihood / Probability Potential death, permanent disability or major structural failure/damage. Off-site environmental discharge/release not contained and significant long-term environmental harm. Potential temporary disability or minor structural failure/damage. On-site environmental discharge/release contained, minor remediation required, short-term environmental harm. L (3) (Low level of harm) Incident that has the potential to cause persons to require first aid. On-site environmental discharge/release immediately contained, minor level clean up with no short-term environmental harm. Level Likelihood / Probability Likely Could happen frequently Moderate Could happen occasionally Unlikely May occur only in exceptional circumstances © Master Builders Association Assessment Tools Nov 2018 V 2.0 L Likely M Moderate U Unlikely H (1) (High) 1 1 2 M (2) (Medium) 1 2 3 L (3) (Low) 2 3 3 CPCCBC4002A Manage OH&S in the Building & Construction Workplace Item Job steps Hazards remove old decking boards/ inspect damage nails, hitting/cutting self Risk Class/ Ranking L Controls corrrect ppe, take your time Name of persons responsible for work Workers remove old shadecloth/rafters nails, manual lifting, fallingM remove old beams Nails, falling objects, manual M lifting Correct ppe, correct lifting, correct work platform Workers remove old posts falling objects, Manual lifting,Nails L Correect ppe, correct lifting workers remove rotten joists and replace Nails, manual lifting, handLtools Correct ppe, take your time workers stand new posts manual lifting L Correct ppe, correct lifting Workers replace new beams/rafters manual lifting, heights M Correct ppe, Correct work platform workers install shadecloth falling, cutting self M Correct ppe, correct work platform workers lay new decking manual labour, Cutting self L Correct pee, take time, lift correctly Workers © Master Builders Association Assessment Tools Nov 2018 V 2.0 correct ppe, correct lifting, correct work platform Workers CPCCBC4002A Manage OH&S in the Building & Construction Workplace Item Job steps © Master Builders Association Assessment Tools Nov 2018 V 2.0 Hazards Risk Class/ Ranking Controls Name of persons responsible for work CPCCBC4002A Manage OH&S in the Building & Construction Workplace Qualifications and experience required to complete the task The workers should know the house layout Personnel, Duties and Responsibilities (Supervisory staff and others) There will be two tradesmen and one builder. and be experienced with power tools.The worker Builder will oversee all work. Training Required to Complete Work No extra training is required to complete this job other than learning houses layout. should have a cert 3. Job is over $5000 so a licensed builder is needed. Also note below how the controls within this SWMS will be implemented, monitored and reviewed These controls will be implemented by making sure that the workers are involved in the swms procedure and they understand the risks involved along with the correct procedures to negate all possible risks. The builder takes the role of supervising that all procedures put in place are stuck to for the entirety of the job At the site meetings there will be a review of this will happen atleast weekly and anything Engineering Details / Certificates / SafeWork Approvals: © Master Builders Association Assessment Tools Nov 2018 V 2.0 the procedures and their effectivness. that is brought up will be discussed and quickly implemented. CPCCBC4002A Manage OH&S in the Building & Construction Workplace This SWMS has been developed through consultation with our workers and has been read, understood and signed by all workers undertaking the works: Print Names: Signatures: Dates: Taj Lukas gnjrdbgk 27/1/21 Review No 01 02 Initial: Date: © Master Builders Association Assessment Tools Nov 2018 V 2.0 03 04 05 06 07 08 09