SF09-01 Hazard Identification and Risk Assessment – HIRA CSP # Project Name 1650 Routine Non Routine Wadi Safar Infrastructure Package 1 Related Documentation/ Legislation 90-QB13-N-201-HSE OPERATIONAL MANUAL Site Office Mobilization Task/Activity: Emergency RA No: RISK ASSESSMENT SN Hazard Identified Affected Person Bad weather / Personnel being run over struck by moving vehicles Risk Workers, foreman, Supervisor 1 RISK CONTROLS Original Risk Without Controls S (1-5) 1 REVISION RA-MSC-013 Personnel Injury 4 L (1-5) 3 Risk Control Measure Already in Use Rate 12 Original Risk With Present Control S L (1-5) (1-5) • Safety Induction training shall be conducted for all employees prior to deploy to the site • Eliminate activities in bad weather to avoid the accidents • Permit to work (PTW) system can be implemented in site to implement additional precautions for the operation of equipment. • Maintain safe distance with equipment. • Maintain daily equipment checklist prior to activity. • Assign trained flagman with every moving equipment for taxing or operation of vehicle or equipment in site. • Use high visibility vest and maintain an eye conduct with the operator. • All equipment is fitted with warning light and sound alarms to alert the employees regarding the operation. • Use reverse alarm during reversing to avoid the accidents. • Only authorised and trained people to operate equipment. • Provide instruction to the employees regarding safe operating procedure. • Safe operating procedure shall be displayed on the equipment or nearby. • Periodic inspection should carry out on all equipment 4 2 Additional Control Measures Needed Rate Residual Risk With Additional Control S L (1-5) (1-5) Rate 8 IF THE RESIDUAL RISK RATING IS 16 OR ABOVE, then additional controls need to be developed for the activity Legend: S Severity and LLikelihood: Hierarchy of Controls: Elimination, Substitution, Engineering, Administrative, PPE LIKELYHOOD Very Unlikely SEVERITY Catastrophic 5 Critical 4 Serious 3 Medium 2 Minimal 1 REV-02 Unlikely Likely Very Likely Almost Certain 1 2 3 4 5 5 4 3 2 1 10 8 6 4 2 15 12 9 6 3 20 16 12 8 4 25 20 15 10 5 RA Team Name 1 Md Ehsan Designation HSE Engr. Prepared By: 2 Mohamed Saeed HSE Officer 3 Mostafa Tharwat CM 4 Ayham Emmrer Engr. Approved By: Engr. Mohamed Khalel Engr. Ashraf Esaam HSE DEPARTMENT PROJECT MANAGER Page 1 of 9 Routine Non Routine Emergency Site Office Mobilization Task/Activity: RISK ASSESSMENT SN Hazard Identified Affected Person Risk S L (1-5) Risk Control Measure Already in Use Rate • • • • • • Operator Property damage, Personnel Injury 3 3 9 Original Risk With Present Control S L (1-5) (1-5) • Collision with existing facilities and assets RA No: RA-MSC-013 REV REVISION 1 RISK CONTROLS Original Risk Without Controls (1-5) 2 1 SFHI09-02 Hazard Identification and Risk Assessment – HIRA Rate Additional Control Measures Needed Residual Risk With Additional Control S L (1-5) (1-5) Rate according to the manufacture recommendation to maintain the equipment serviceable. Speed limit shall be implemented in site to avoid collisions Only certified operator can operate the equipment. Area should be clear from any type of obstruction. Place signage of be aware from moving part. Use proper PPE for employees to reduce the impact of hazards if happened (Hand gloves, high visibility vest). Conduct TBT meeting prior to activity will provide idea of hazards involved in each activity. Appropriate supervision and monitoring shall be provided to reduce the hazards • Safety Induction training shall be conducted for all employees prior to deploy to the site. • Permit to work (PTW) system can be implemented in site to implement additional precautions for the operation of equipment. • Maintain safe distance with equipment. • Maintain daily equipment checklist prior to activity. • Assign trained flagman with every moving equipment for taxing or operation of vehicle or equipment in site. • All equipment is fitted with warning light and sound alarms to alert the employees regarding the operation. • Only authorised and trained people to operate equipment. • Excavations, scaffold and fall opening shall be hard barricade and post reflective signage to alert the drivers • Speed limit shall be implemented in site to avoid collisions • Provide instruction to the employees regarding safe operating procedure. • Periodic inspection should carry out on all equipment according to the manufacture recommendation to maintain the equipment serviceable. • Only certified operator can operate the equipment. 3 2 6 Page 2 of 9 Routine Non Routine Emergency Site Office Mobilization Task/Activity: RISK ASSESSMENT SN Hazard Identified Affected Person 1 SFHI09-02 Hazard Identification and Risk Assessment – HIRA RA No: RA-MSC-013 REV REVISION 1 RISK CONTROLS Risk Original Risk Without Controls S (1-5) L (1-5) Rate Risk Control Measure Already in Use Original Risk With Present Control S L (1-5) (1-5) Rate Additional Control Measures Needed Residual Risk With Additional Control S L (1-5) (1-5) Rate • Area should be clear from any type of obstruction. • Place signage of be aware from moving part. • Conduct TBT meeting prior to activity will provide idea of hazards involved in each activity. • Appropriate supervision and monitoring shall be provided to reduce the hazards 3 4 Heat Exhaustion Falling and Tripping Workers Employees Personnel Illness, Fatality (Heat Stroke) Fatality, Personnel injury 4 4 4 4 16 • Safety Induction training shall be conducted for all employees prior to deploy to the site • Avoid working in dangerous working in environment (High temperature environment) • Provide Drinking water and Ice cubes on the site to reduce the impact of heat • Avoid working under the direct sun light in the summer time • Provide shelters with cool atmosphere for the rest time. • Provide frequent breaks for the employees to reduce the impact • Close supervision and monitoring shall be provided for the activities carried in heat atmosphere • Provide cooling fans for the workers performing job inside the building • Follow the safe work procedure to perform the jobs. 3 3 9 16 • Safety Induction training shall be conducted for all employees prior to deploy to the site. • PTW system can be implemented to reduce the accidents generating form working at height • All workers are attended the safe working at height training • Pre-use check shall be carryout on all ladders and scaffolds • Guard rails should be provided for all edges to avoid falling from height • Working on the guard rails are prohibited • Remove defective component of harness prior to use • Periodic inspection shall be carried out on all harness to ensure the quality. 4 2 8 Page 3 of 9 Routine Non Routine Emergency Site Office Mobilization Task/Activity: RISK ASSESSMENT SN Hazard Identified Affected Person 1 SFHI09-02 Hazard Identification and Risk Assessment – HIRA RA No: RA-MSC-013 REV REVISION 1 RISK CONTROLS Risk Original Risk Without Controls S (1-5) L (1-5) Rate Risk Control Measure Already in Use Original Risk With Present Control S L (1-5) (1-5) Rate Additional Control Measures Needed Residual Risk With Additional Control S L (1-5) (1-5) Rate • All defective parts are replaced with good parts of scaffold and ladder. • Placing the ladder and scaffold on a slop surface is prohibited • Avoid ladder as a working platform. Perform all the job by standing on a working platform • All scaffolds are erected by certified scaffold erectors and inspected by the certified scaffold inspector or supervisor • All the activity above 1.8 meter height the operator need to wear full body harness with shock absorber with 100% tie off • Operator need to hock the safety harness on a fixed or strong point above his shoulder height • Ladder are need to secure on top before performing the task • Scaffold tag system shall be implemented in site • Scaffolds and ladders are should be placed on strong and even floor levels to reduce the scaffold collapse • Proper supervision shall be provided for all activity work at height activity • Periodic inspection shall be carried out scaffold according to the project requirement. • TBT meeting shall be conducted prior to each work at height activity regarding safe working at height. • Access and egress to working platform is free from obstructions to easily accessible • Emergency response plan shall be Implemented for in case of emergencies • Proper PPE shall be provided for employees are performing the work a height activity • Signage and postures are displayed on the edges to alert the employees regarding the hazard. • Proper illumination on the site to reduce the slip and trip. • Maintain good housekeeping in site to avoid slip and trip hazards. Page 4 of 9 Routine Non Routine Emergency Site Office Mobilization Task/Activity: RISK ASSESSMENT SN Hazard Identified Affected Person 1 SFHI09-02 Hazard Identification and Risk Assessment – HIRA RA No: RA-MSC-013 REV REVISION 1 RISK CONTROLS Risk Original Risk Without Controls S (1-5) L (1-5) Rate Risk Control Measure Already in Use Original Risk With Present Control S L (1-5) (1-5) Rate Additional Control Measures Needed Residual Risk With Additional Control S L (1-5) (1-5) Rate • Clean all spillages immediately to avoid slip. • Maintain Floor free from any type of slippery things and obstructions. • Proper stacking and storage of material also avoid slip and trip inside the site. • Park the equipment’s at their designated parking area only. • All under lying utilities show be covered to avoid trip hazards • Place signage for slip & trip hazard to alert the employees. • Floor surfaces should be even to avoid the trip hazards in the site. • Floor opening should be covered and display the signage regarding the caution. • If changes in level of ground try to level it or put the signage’s for awareness. • Conduct TBT meetings regarding the slip and trip hazards. • Proper cable management should maintain in the site to avoid trip hazards. • Access, Egress must be clear and free from obstruction. 5 Injury due to obstacles, carrying heavy loads, use of tools. workers Personnel Injury, 3 3 9 • Safety Induction training shall be conducted for all employees prior to deploy to the site • Housekeeping shall be performed in to avoid the obstacles in the pathway • Pathways are clear from obstructions and adequate illumination and warning signage shall be in place to avoid the trip hazards • Pathways are maintained in even and underlying utilities shall be covered to avoid the trip hazards. • Maintain proper cable management to reduce the accidents arising from the obstructed pathway • Manual handling procedure shall be implemented and employees are trained with safe manual handling technique • WLL shall be set in site for the manual handling activities 3 2 6 Page 5 of 9 Routine Non Routine Emergency Site Office Mobilization Task/Activity: RISK ASSESSMENT SN Hazard Identified Affected Person 1 SFHI09-02 Hazard Identification and Risk Assessment – HIRA RA No: RA-MSC-013 REV REVISION 1 RISK CONTROLS Risk Original Risk Without Controls S (1-5) L (1-5) Rate Risk Control Measure Already in Use Original Risk With Present Control S L (1-5) (1-5) Rate Additional Control Measures Needed Residual Risk With Additional Control S L (1-5) (1-5) Rate • Loads shall be spilt into separate parts to reduce the load • Mechanical aids can be used instead of manual handling • Safe system work shall be communicated to the workers to avoid the injuries arising from the tools • Pre-use inspection shall be carried out on tools to ensure the tools are safe to use • Defective tools shall be replaced with good to avoid the injuries arising from the tools. • Periodic inspection and maintenance of tools will reduce the chance of injuries • Competent person allowed to perform the activities to avoid the incidents • Proper supervision and monitoring will provide the advises to the workers to reduce the accidents 6 7 Physical Injuries due to use and movement of equipment’s, are falling, tripping Fall of lifted concrete foundations Operator, workers Lifting crew, operatives Personnel Injury Personnel injury, Fatality, Property Damage 4 4 2 3 8 • Safety Induction training shall be conducted for all employees prior to deploy to the site • Barricade and signage shall be installed in the hazardous location (Excavation, trench, etc.) • Site survey plan shall be implemented on site and an effective site survey shall be carried out to identify the hazardous location. • Risk Assessment shall be conducted to assess hazardous areas in site. • Work shall be carried out according to the method statement approved by the company • Close Supervision and monitoring shall be provided for all the activities • Assign competent people to perform the job in site 3 2 6 12 • Safety Induction training shall be conducted for all employees prior to deploy to the site • Lifting plan and permit shall implemented on site • According to the approved lifting plan, lifting activity shall be carried out • Proper supervision and monitoring shall be implemented 4 1 4 Page 6 of 9 Routine Non Routine Emergency Site Office Mobilization Task/Activity: RISK ASSESSMENT SN Hazard Identified Affected Person 1 SFHI09-02 Hazard Identification and Risk Assessment – HIRA RA No: RA-MSC-013 REV REVISION 1 RISK CONTROLS Risk Original Risk Without Controls S (1-5) L (1-5) Rate Risk Control Measure Already in Use Original Risk With Present Control S L (1-5) (1-5) Rate Additional Control Measures Needed Residual Risk With Additional Control S L (1-5) (1-5) Rate • All the lifting equipment are certified • Pre-use check shall be carried out on all lifting equipment and gears used to identify the defective parts • All lifting gears are free from damage to use for lifting. • Avoid lifting activity on high wind climate to avoid the falling of load • Lift according to the WLL of lifting equipment • Lifting gears are should be installed to C of G of load and. Out triggers are properly installed to avoid the lifting failure • Standing under suspended load is prohibited in site • Lifting area shall be barricade and post signage to avoid the unauthorised interview. • Assign signaller or banks man for lifting activities • Assign a trained rigger to perform the rigging activities. • All the equipment operators have trained and valid certificate. • Proper PPE shall be provided installed to reduce the impact of debris falling • Proper housekeeping shall be conducted in site to remove the unwanted material from site • Provide hard barricade under the scaffold, working at height areas, and edges to avoid the impact on workers • Postures and signage regarding 8 Collapse of trench / Manhole pit Workers Personnel Injury, Fatality 4 4 16 • Safety Induction training shall be conducted for all employees prior to deploy to the site • Provide barricade and signage on the manhole and trench pitch to alert the workers • PTW system can be implemented on site to take precautions to get in of man holes • Adequate supervision and monitoring shall be provided for the activities inside man hole • Work shall be carried out according to the safe system of work • Only competent workers are allowed to perform the job 4 2 8 Page 7 of 9 Routine Non Routine Site Office Mobilization Task/Activity: Emergency RISK ASSESSMENT SN Hazard Identified Affected Person 1 SFHI09-02 Hazard Identification and Risk Assessment – HIRA RA No: RA-MSC-013 REV REVISION 1 RISK CONTROLS Risk Original Risk Without Controls S (1-5) L (1-5) Rate Risk Control Measure Already in Use Original Risk With Present Control S L (1-5) (1-5) Rate Additional Control Measures Needed Residual Risk With Additional Control S L (1-5) (1-5) Rate • Pre-use check shall be conducted on all manholes before entry • Drilling, Milling, use of heavy equipment is prohibited near to manholes. 9 Defective tools and equipment 10 Damage to equipment’s / Uncontrolled lifts Operator and helpers Personnel injury, property damage Property Damage 3 4 3 2 9 • Safety Induction training shall be conducted for all employees prior to deploy to the site • Emergency response plan and system shall be implemented in site • Emergency precautions shall be taken while performing the activity. • All defective tools remove from operations in site • Pre-use check-up shall be carried out to ensure the equipment safe for operation • Periodic inspection shall be carried on all tools and equipment by a trained technician in site • Colour coding system can be implemented on all equipment for ensuring the quality • Periodic maintenance can be carried out according to the manufacture recommendations • All employees are trained with safe operation of tools and equipment to avoid the accidents • TBT Meeting can be conducted prior to each activity to avoid the injuries • Proper PPE Shall be provided for operators according to the manufacture recommendations • Safe operating procedure can be communicated and posted on the equipment • Barricade the area to avoid unauthorised entry • Signage and postures can be posted on the area to alert the workers regarding the hazards. 3 2 6 8 • Safety Induction training shall be conducted for all employees prior to deploy to the site • Adequate supervision shall be provided for all activity • Proper precautions shall be taken while handling equipment/ uncontrolled lifts • All lifting activities should meet the requirements and 3 2 6 Page 8 of 9 Routine Non Routine Emergency Site Office Mobilization Task/Activity: RISK ASSESSMENT SN Hazard Identified Affected Person 1 SFHI09-02 Hazard Identification and Risk Assessment – HIRA RA No: RA-MSC-013 REV REVISION 1 RISK CONTROLS Risk Original Risk Without Controls S (1-5) L (1-5) Rate Risk Control Measure Already in Use Original Risk With Present Control S L (1-5) (1-5) Rate Additional Control Measures Needed Residual Risk With Additional Control S L (1-5) (1-5) Rate approved lifting plan and PTW shall be implemented • Traffic management plan shall be implemented for the safe operation of equipment. • Only competent workers and operators are allowed to perform the job. • Emergency response procedure shall be implemented in site • Emergency precautions shall be taken while operating the equipment • Periodic maintenance of equipment shall be carried to avoid failure. • Pre-use check shall be carried out on equipment to avoid the failure. Page 9 of 9