.No. Facility
Capacity
Existing
1 Sponge Iron Plant
100 TPD (2x50 TPD)
Proposed
1 Sponge Iron Plant
200 TPD (2x100 TPD)
2 Induction furnace
10 TPD
3 Rolling Mill
30 TPD
4 Captive Power Plant
6 MW
WHRB
4 MW
FBC
2 MW
.No. Facility
Capacity
Existing
1 Sponge Iron Plant
100 TPD (2x50 TPD)
Proposed
1 Sponge Iron Plant
200 TPD (2x100 TPD)
2 Induction furnace
10 TPD
3 Rolling Mill
30 TPD
4 Captive Power Plant
6 MW
WHRB
4 MW
FBC
2 MW
Expansion of Sponge Iron Plant (100 TPD to 300 TPD) along with installation of Induction Furnace
(10T) , Rolling Mill (30 T) and Captive Power Plant (6 MW; 4 MW-WHRB & 2 MW-FBC) at Sy No.
404 to 408, Village Halkundi, Taluk & District Bellary, Karnataka by M/s Yeshashvi Steels & Alloys
Pvt. Limited - regarding Environmental Clearance