.No. Facility Capacity Existing 1 Sponge Iron Plant 100 TPD (2x50 TPD) Proposed 1 Sponge Iron Plant 200 TPD (2x100 TPD) 2 Induction furnace 10 TPD 3 Rolling Mill 30 TPD 4 Captive Power Plant 6 MW WHRB 4 MW FBC 2 MW .No. Facility Capacity Existing 1 Sponge Iron Plant 100 TPD (2x50 TPD) Proposed 1 Sponge Iron Plant 200 TPD (2x100 TPD) 2 Induction furnace 10 TPD 3 Rolling Mill 30 TPD 4 Captive Power Plant 6 MW WHRB 4 MW FBC 2 MW Expansion of Sponge Iron Plant (100 TPD to 300 TPD) along with installation of Induction Furnace (10T) , Rolling Mill (30 T) and Captive Power Plant (6 MW; 4 MW-WHRB & 2 MW-FBC) at Sy No. 404 to 408, Village Halkundi, Taluk & District Bellary, Karnataka by M/s Yeshashvi Steels & Alloys Pvt. Limited - regarding Environmental Clearance BHADRASHREE STEEL & POWER LIMITEDxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx