Uploaded by Goutham Virigineni

print

advertisement
Path from 'T1/D' to 'D2/D' (slack = -0.422665)
c lk(T1/D)
Pin (T1/D)
0.7364 slew = 0.1145
Pin (T1/Q)
1.0067 slew = 0.1276
Pin (I2/A)
1.0067 slew = 0.1276
Pin (I2/Y)
1.1118 slew = 0.1541
Pin (D2/D)
1.1118 slew = 0.1541
time lent
path delay
0.2364
0.3754
slac k
-0.4227
setup
required
c lk(D2/D)
0.3109
arrival
Download