Uploaded by Ahamed Shaikh

3B Electrical DWG stca

advertisement
LIGHTING LEGEND
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
SYMBOL DESCRIPTION
D1
D2
D3
D4
D5
D6
F1
F2
F3
S1
S2
S3
EM
EX-W
WL
WL1
WL2
WL3
KEY PLAN
3
1B
1B
2B
1B
2A
1B
3B
1B
2B
CL-1
1B
2A
2
3B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2B
3A
2A
0
POWER POINT FOR EXHAUST FAN
SUB CONTRCTOR
1B
POWER POINT FOR CHANDELIER LIGHT
: ‫توقيــع‬
2A
CH
EF EF
: ‫ختـــم‬
2B
ML
‫ممثـــل المتعھـــد‬
CL-1
UP
RECESSED DOWN LED LIGHT - 12W
WITH GEAR LOSS - 14W (IP-44)
RECESSED DOWN LED LIGHT - 6.5W
WITH GEAR LOSS - 8W (IP-20)
RECESSED DOWN LED LIGHT - 26W
WITH GEAR LOSS - 29W (IP-44)
RECESSED DOWN LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-20)
RECESSED DOWN LED LIGHT - 22W
WITH GEAR LOSS - 24W (IP-65)
RECESSED DOWN LED LIGHT - 13W
WITH GEAR LOSS - 14W (IP-20)
SURFACE MOUNTED LINEAR LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-66)
RECESSED MOUNTED LINEAR LED LIGHT - 4.8W
WITH GEAR LOSS - 6W (IP-65)
SURFACE MOUNTED LINEAR LED LIGHT - 26W
WITH GEAR LOSS - 28W (IP-40)
SURFACE MOUNTED LED LIGHT - 28W
WITH GEAR LOSS - 30W (IP-54)
SURFACE MOUNTED LED LIGHT - 14W
WITH GEAR LOSS - 16W (IP-65)
SURFACE MOUNTED LED LIGHT - 57W
WITH GEAR LOSS - 63W (IP-40)
SURFACE/RECESSED MOUNTED EMERGENCY LED LIGHT (SELF
CONTAINED) -8W WITH GEAR LOSS - 10W (IP-65)
WALL MOUNTED/SURFACE EMERGENCY EXIT SIGN (SELF CONTAINED) - 8W
WITH GEAR LOSS - 10W (IP-65)
SURFACE MOUNTED LIGHT LED - 15.5W
WITH GEAR LOSS - 17W (IP-65)
WALL MOUNTED DOWN LIGHT LED - 16.8W
WITH GEAR LOSS - 20W (IP-65)
WALL MOUNTED UP-DOWN LIGHT LED - 13.9W
WITH GEAR LOSS - 16W (IP-65)
WALL MOUNTED LED LIGHT - 17W
WITH GEAR LOSS - 20W (IP-66)
GROUND RECESSED UP LIGHT LED - 14.3W
WITH GEAR LOSS - 16W (IP-67)
SURFACE MOUNTED LED LIGHT - 18W
WITH GEAR LOSS - 20W (IP-43)
1B
POWER POINT FOR UNDER CABINET LIGHTS (KITCHEN)
3A
CL-9
1B
LP
CL-1
3B
2A
1A
2A
1B
2A
3A
1B
1B
3A
2A
1B
2A
1B
4
FLOOD LED LIGHT 104W
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
3A
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
16
LEGEND AND ABBREVIATIONS
DB.3B.GF.01\ R11
PHASE WIRE (2.5Sq mm PVC
WIRE)
H.1
I
NEUTRAL WIRE(2.5Sq mm PVC
WIRE)
F
F
F
EARTH WIRE(1.5Sq mm PVC
WIRE)
F
D5
LG45
D5
D5
D5
D5
LG70
LG69
LG68
D5
F
CONDUIT FOR EMERGENCY
SUPPLY
LG46
D5
LG44
LG67
F3 b
LG143
D5
LG72
G
D5
D5
D5
LG73
LG74
LG75
D5
D5
D5
LG66
LG65
LG64
LG59
EG7
EM
SINGLE POLE 2-WAY SWITCH @ 1250mm FROM
FFL
LT ROOM
LG63
D5
D5
LG48
LG49
SINGLE POLE 1-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
F3 a
a
F3
LG142
b
LG141
D5
SINGLE POLE 2-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
LG43
a
WL1
PB
LIGHT POINT FOR FAN
D5
D5
LG81
LG80
D5
D5
LG78
D5
LG77
D5
LG61
LG60
D5
D5
LG57
LG56
DB.3B.GF.01\ Y1
?
WL1
UP
D5
LG123
LG124
S1
?
STAIR
?
?
LG86
D1
?
EM
WL1
F2
?
LG85
D1
EM
EG2
LG15
D1 LOBBY
LG93
D5
D1
LG122
D
LG92
LG87
LG94
LG88
LG91
LG133
D5
LG120
D1
LG95
D1
D1
LG90
LG89
LG128
F1
LG11
j
F1
?
D6
a
LG129
D6 b
h
D6
a
D6 b
LG131
a bc
LG130
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
UP
LG41
OTIS
LG146
LG137
D5
TRANSFORMER ROOM WALL MOUNTED
LIGHTS ARE MOUNTED AT 3.5 METER HEIGHT
(TYPICAL)
D.1
LG39
a
D5
LG38
EG1
LG5
DB.3B.GF.01
F3
b
a
b
ELECTRICAL
ROOM
LG4 F3 a
F3
LG3
STATE OF KUWAIT
ELECTRICAL ROOM WALL MOUNTED
LIGHTS ARE MOUNTED AT 2.5 METER HEIGHT
(TYPICAL)
D5
LG35
LG117
D5
LG116
D5
LG103
F2
D5
D5
RETAIL-DB
LG115
F3
a
PUBLIC AUTHORITY FOR HOUSING WELFARE
TELECOM
a
F3
F2
D5
LG112
D5
LG113
LG104
a
LG33
LG34
b
LG25
LG101
WL
LG114
D5
LG2
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
D5
D5
b
D5
LG102
D5
D5
LG26
D5
D5
LG28
LG30
D5
LG32
DB.3B.GF.01\ R2
CLUSTER :
B
LG109
LG111
A
LG110
D5
WL1
LG107
D5
LG108
WL1
D5
WL1
LG106
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
LG36
LG1
LG100
: ‫رقم المخطط التعاقدي‬
BU-EL-100-‫ب‬
D5
LG37
DB.3B.GF.01\ R1
D5
‫يعتمـــد‬
LG40
h
EM
LG99
WL1
LG27
D5
LG105
D5
LG29
D5
LG31
A.1
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
WL1
GROUND FLOOR PLAN
LIGHTING LAYOUT
TELECOM ROOM WALL MOUNTED
LIGHTS ARE MOUNTED AT 2.5 METER HEIGHT
(TYPICAL)
: ‫عنــــوان المخـــطط‬
DB.3B.GF.01\ R8
UP LIGHT FOR ENTRANCE
UP
LG50
DATE
FAWAZ
LG6
F3
D6
c
NIRMEEN HAAL
AHEMD NAGEEB
SIGN
AD
CORE & SHELL
F2
UBC
ELEVATOR
D5
EF
LG12
LG7
D6
c
a
DB.3B.GF.01\ B7
DB.3B.GF.01\ Y7
?
WL
D4
EG4
LG132
?
STAIR
EM
F3
EM
D4
LG98
D4
g
?
RETAIL
OFFICE
LG136
LG118
b
LG13
S1
GUARDS
QUARTER
FOR GROUND FLOOR LIFT
LOBBY LIGHT
F2
EF
LG145
S1
NASHWA AL-SAYED
FIRE FIGHTING
def
D4
LG97
DB.3B.GF.01\ B1
c D6
b
a
F1
COMPANY
SR. STURUCTURAL
PLAUMBING
a
a
DB.3B.GF.01\ Y8
NAME
SR. ARCHITECT
D5
LG42
b
DB.3B.GF.01\ B5
LG135
LG119
D2
d
g LG14
LG10
D1
EM
D5
GARBAGE
CHUTE
FOR G.F EXTERNAL LIGHT
D6
a D6
EG3
F2
de f
?
LG134
b
F3
LG16
gh
FOR STAIRCASE-1&2 LIGHT
WL WL
?
D1
EF k
j
DB.3B.GF.01\ B3
LG126
LG127
EM
F1
LG23
LG9
i
f EF
D2 d
LOBBY
D1
F1
LG8
LG125
D1
LG121
i
GARBAGE ROOM WALL MOUNTED
LIGHTS ARE MOUNTED AT 3.0 METER HEIGHT
(TYPICAL)
ML e
D5
LG96
k
EM
F3
WL1
LG53
LG54
DB.3B.GF.01\ R4
D1
EF
TOILET
DB.3B.GF.01\ Y2
LG83
LG84
DB.3B.GF.01\ R5
D1
EG6
TRANSFORMER
ROOM
LG17
DB.3B.GF.01\ B2
DB.3B.GF.01\ B5
S1
b
LG140
EG5
LG138
f
DB.3B.GF.01\ R3
F1
LG22
EM
LG24
WATER TANK
ROOM
c
LG79
E
F1
ML e
WL WL
D5
LG18
TRADE
F3
b
STORAGE
LIGHT POINT FOR FAN
LIGHT IN LIFT PIT
LG139
AD
c
LG19
LIFT SHAFT LIGHT EVERY 7 MTR
(TYPICAL)
F
COORDINATION CERTIFICATION
c
‫اعتماد‬
D5
a
F1
WL1
LG82
F1 a
: ‫اسم‬
LG62
WL1
LG58
c
: ‫التوقيع‬
WL1
EF
ON / OFF PUSHBUTTON SWITCH @ 1250mm FROM FFL
LG20
LG21
c
: ‫اسم‬
LG55
C
SINGLE POLE 1-WAY SWITCH @ 1250mm FROM
FFL
LG144
D5
D5
LG76
HOME RUN TO DB
F3 b
: ‫التوقيع‬
D5
LG71
D5
LG47
WATER TANK ROOM WALL MOUNTED
LIGHTS ARE MOUNTED AT 3.0 METER HEIGHT
(TYPICAL)
CONDUIT
‫موافقة‬
H
1A
2B
1A
‫تاريخ‬
6
: ‫التوقيع‬
5
: ‫اسم‬
4
CL-1
2A
1A
3B
‫تد قيـــق‬
3
CL-2
1A
1A
1A
: ‫التوقيع‬
2
1B
3A
: ‫اسم‬
1
2B
2B
1A
‫مخطط االنارة التفصيلي األرضى‬
FOR BUILDING SIGNAGE
UP
LG51
WL3
LG52
DRG.NO:
SD-BU-3B-EL-101-A
DRAWN BY:
BM
CHKED.BY: YASSER
LIGHTING LEGEND
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
SYMBOL DESCRIPTION
D1
D3
D4
D5
D6
F1
F2
F3
S1
S2
S3
EM
EX-W
WL
WL1
WL2
WL3
KEY PLAN
1B
2B
1B
3
1B
2B
2A
1B
3B
1B
2B
CL-1
1B
2A
2
3B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
2B
1B
3A
3A
1B
5
3B
CL-1
CL-1
2B
3A
0
2A
1B
3A
POWER POINT FOR UNDER CABINET LIGHTS (KITCHEN)
CL-9
1B
2A
1B
2A
3A
1B
3A
1B
2A
1B
4
2A
7
CL-1
FLOOD LED LIGHT 104W
2A
1A
1B
CL-1
3B
LP
CL-1
1B
3A
2A
CL-1
POWER POINT FOR EXHAUST FAN
SUB CONTRCTOR
2B
POWER POINT FOR CHANDELIER LIGHT
EF EF
: ‫توقيــع‬
1B
ML
CH
: ‫ختـــم‬
CL-1
UP
‫ممثـــل المتعھـــد‬
2A
RECESSED DOWN LED LIGHT - 12W
WITH GEAR LOSS - 14W (IP-44)
RECESSED DOWN LED LIGHT - 6.5W
WITH GEAR LOSS - 8W (IP-20)
RECESSED DOWN LED LIGHT - 26W
WITH GEAR LOSS - 29W (IP-44)
RECESSED DOWN LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-20)
RECESSED DOWN LED LIGHT - 22W
WITH GEAR LOSS - 24W (IP-65)
RECESSED DOWN LED LIGHT - 13W
WITH GEAR LOSS - 14W (IP-20)
SURFACE MOUNTED LINEAR LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-66)
RECESSED MOUNTED LINEAR LED LIGHT - 4.8W
WITH GEAR LOSS - 6W (IP-65)
SURFACE MOUNTED LINEAR LED LIGHT - 26W
WITH GEAR LOSS - 28W (IP-40)
SURFACE MOUNTED LED LIGHT - 28W
WITH GEAR LOSS - 30W (IP-54)
SURFACE MOUNTED LED LIGHT - 14W
WITH GEAR LOSS - 16W (IP-65)
SURFACE MOUNTED LED LIGHT - 57W
WITH GEAR LOSS - 63W (IP-40)
SURFACE/RECESSED MOUNTED EMERGENCY LED LIGHT (SELF
CONTAINED) -8W WITH GEAR LOSS - 10W (IP-65)
WALL MOUNTED/SURFACE EMERGENCY EXIT SIGN (SELF CONTAINED) - 8W
WITH GEAR LOSS - 10W (IP-65)
SURFACE MOUNTED LIGHT LED - 15.5W
WITH GEAR LOSS - 17W (IP-65)
WALL MOUNTED DOWN LIGHT LED - 16.8W
WITH GEAR LOSS - 20W (IP-65)
WALL MOUNTED UP-DOWN LIGHT LED - 13.9W
WITH GEAR LOSS - 16W (IP-65)
WALL MOUNTED LED LIGHT - 17W
WITH GEAR LOSS - 20W (IP-66)
GROUND RECESSED UP LIGHT LED - 14.3W
WITH GEAR LOSS - 16W (IP-67)
SURFACE MOUNTED LED LIGHT - 18W
WITH GEAR LOSS - 20W (IP-43)
D2
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1
2
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
16
1A
LEGEND AND ABBREVIATIONS
PHASE WIRE (2.5Sq mm PVC
WIRE)
EARTH WIRE(1.5Sq mm PVC
WIRE)
LIGHT POINT FOR FOR CHANDLIER
L44
DB-3BR-2\ Y2
DB-3BR-2\ R2
G
L31
S3 L38
h
S3
L37
g
b
a
L30 S3
c
b
c d e
D6
L35
a
f
D1 L18
c
d
c
b
a
DB-3BR-2\ B1
DB-3BR-2\ Y1
g
L11 D6
a
z
y
x
L5 PD.
D1 bFD
L4 d
ML
L3
EF
c
L10
D6
a
a
L9
L48
D1
L1/21
L1/22
L5
a
d
EF
D6
FD
a
EM
S3
c
EF
?
b D1
CORRIDOR
EF
L46
e
L1
d
b
L3
D1
E
b
a
b
c
d
?
D1
D1
L1/17
L1/19
E1/4
L1/18
EM
?
D1
L1/16
D1
CORRIDOR
L1/14
L1/15
D1
D1
L1/13
EM
L1/12
D1
D1
L1/11
E1/3
D1
L1/10
EX1/2
FOR EXHAUST FAN
(TYP)
D4ROOM
MAID'S
h L30 e
g
f
EF L33
L34
f
h D1 g
ML MAID'S TOILET
L35
D
FD
DB-3BR3a\ Y2
L43
L44
d
L45
ML
TOILET
e
FD
a
b S3
LP
c
b
KITCHEND3
a
a L27 a
FOR WALL CABINET
LIGHT
D6
c L16
DB-3BR3a\ R2
f
L37
D2
L42
f
FD
D1
TOILETc
L38
L39
e f D2
d
c L36
ML
e
L15
c
d
e
f
j
M
L46
L8
f
g EF
FD
D1
TOILET
L9 e
L19
d
S3
b
L20
a
D1
L20
gfe
e
e
S3
BED ROOM
L47
m CH
L41
L11
D6
LIVING
j
L9
j
a
a
DB-3BR-2
D6
L25
EM
D3
LP
k
EF
d
e
S3
x
y
z
a
D6 L11
a
c
k
b
L12 S3
DIWANIYA/
BEDROOM 3
a
b
c
b
c
d
LIVING ROOM
b
L16
f
L27
L28
f
MAID'S
ROOM
D4
EM
DB-3BR-2\ Y1
KITCHEN
FOYER DB-3BR-2\ B1
a
D6 L1
L7
EF
x
ML L6 y FD
z
TOILET
L8
D1
a
L14
D3
c
L18 D1
L35
D6
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. STURUCTURAL
PLAUMBING
OTIS
g
D4
g
h
j
k
L31
L30
D1
MAID'S
h TOILET j
L29 EF
D.1
BU-EL-101-‫ب‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
b
S3
b
h
L38 S3
CH
j
L39
LIVING ROOM
g
L37
S3
L36
f
D6
S3
f
g
h
i
CH
PUBLIC AUTHORITY FOR HOUSING WELFARE
L31
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
L40 i
DINING ROOM j
S3
g
L41
S2
L13
DB-3BR-2\ R2
a
b
c
DB-3BR-2\ Y2
a
d L24 D2
e
f
L43
L29
EF
e
L25
b
S3
ML L27
FD
L28
D1
f
CLUSTER :
MASTER
BEDROOM
c
S3
PROTOYPE :
L26
A.1
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
FIRST FLOOR PLAN
LIGHTING LAYOUT
LIGHT
POINT FOR CHANDELIER
DB.3B.L1.03
(3BR-2 TYP)
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
STATE OF KUWAIT
A
DB.3B.L1.04
(3BR-3A TYP)
‫يعتمـــد‬
k MLFD
e d c
S3 L30
a
DATE
FAWAZ
ELEVATOR
BEDROOM 2
e
S3
a
c
h L42
e
f
d
c
UBC
FIRE FIGHTING
L33
S3 BEDROOM 3S3
L26
NASHWA AL-SAYED
SR. ARCHITECT
SIGN
D4
L25
FOR CABINET
LIGHT
UP/DN
?
f
L32
POWER POINT FOR UNDER CABIN LIGHT
L23
L33
ML
EF c
e
d
L32
FD
b L21
FD
c
L34 d EF
cTOILET
TOILET
MAID'S L20
ROOM bMAID'S D1
D1
a D4
L22
a
ML d
a
L15 D3
DB-3BR-2\ R1
c
EF
L3
ML
d L4 FD
bPD.D1
L5
L10
b
S2
?
UP
k
LIGHT POINT FOR CHANDLIER
g
COMPANY
DB.3B.GF.01\ B12
L1/5
L2
L12
S3
L24
S1
E1/2
D1
D6
a
?
d
L22
S3
a
S3
D3
c
FOR EXHAUST FAN
D6
b
a
f
L21
EM
EM
D1
DB.3B.GF.01\ Y4
c
d
L23
FOR EXHAUST
FAN
?
EF
L6
e
NAME
L1/6
E1/1
S3
L40
L23
k
GARBAGE
D6
b
L7
S3
d
L18
L5
F3
L1/4
L10
DINING
S3
a
j
l
D1
S3
S3
a
ML
D6 L14
a
c
b
MASTER BED
ROOM
D1
L2
l
j
PD.
EF
L4
FD k
cde
gf
D1
ELEC.
L1/3
L1/1
L3
FOYER
c
D6
ML
b
D6
L13
j
FOR EXHAUST FAN
D6
L1/2
F1
D6 a
b
L16
D6
L15
EF
TRADE
L34
FD
D1
L35
TOILET
d
F3
L1
DB-3BR3a\ B1
L24
c
EM
DB-3BR3a\ R1
a DB-3BR3a\ Y1
ba
b
D3
EF e
d
c
b
L26 D1
L28
D4
e
d
d e
L32 EF
c D6
c
f
D1
c
L29
L31
L17
EF e
c
j
D3
b
KITCHEN
D3
S1
L1/7
e
c ML
L22
?
EM
EX-W
EM
D1
D1
L36
DB-4BR2\ Y1
L19
EX-W
S1
COORDINATION CERTIFICATION
L7
L21
EX1/1
UP
B
k
L1/8
?
S1
C
a
D1
L1/9
SWITCH FOR
CORRIDOR LIGHT
D6
ON / OFF PUSHBUTTON SWITCH @ 1250mm FROM FFL
b
L4
DB-4BR2\ B1
E1/5
L1/20
e
S3
c
ML
D1
a
PB
j
D6
j
a
L38
S3
L17
e f gh
b
PDL2
c
D1
L8
S3
S3
BEDROOM 2 b
L37
S3
f
L9
LIGHT POINT
FOR FAN(TYP.)
L6
D6
a
g
?
CH
L10
f
L45
DB-4BR2\ Y2
L47
D1
SINGLE POLE 2-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
a
e
ML
L50
c
b
a
D6
D6
a
SINGLE POLE 1-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
j
D6
FD
DB-4BR2\ R2
a
S3
SINGLE POLE 2-WAY SWITCH @ 1250mm FROM
FFL
DB-4BR2\ R1
f
L51
TOILET
D1
L49
a
L16
b
S3
SINGLE POLE 1-WAY SWITCH @ 1250mm FROM
FFL
c
D2 L39 def
b
a
L13
HOME RUN TO DB
j
a
D6 f
e
DB-3BR-2
L2
a
f
h L12
LIVING
ROOM
CH
L11
f
L18
KITCHEN
D3 L15
a
L52
g
D6
L1 D6 FOYER
a
DB-3BR-2\ R1
d
a
ML
L22
D1
TOILET
MAID'S TOILET D4 a
D1
b cMAID'S
c
FD
L20 ROOM
EF d L34
FD
b
L21
L32
d
e
c EF
ML
L33
L23
POWER POINT FOR UNDER CABIN LIGHT
b
L42
ML
L40
c
D1
L8TOILET
z
FD y L6
ML
x
EF
L7
c
b
D3 a
L14
a
S3
LIVING
L39ROOM
j
CH
BEDROOM 2
S3
F
L42 h
j DINING ROOM
i
i L40
h
CH
g
f
D6
f
L36
S3 L12
b
k
MASTER
BEDROOM
S3
c
‫تاريخ‬
L25
e
D2 L24 d
a
c
b
a
b
e
S3
S3
DIWANIYA/
BEDROOM 4
CONDUIT FOR EMERGENCY
SUPPLY
: ‫التوقيع‬
f
S3
L41
g
S3
: ‫اسم‬
L27 ML
L43
e
TOILET
D1 FD d
‫تد قيـــق‬
MASTER
BEDROOM
S3
S2
: ‫التوقيع‬
c
L53
g
CONDUIT
‫موافقة‬
H
D1
TOILET
L28
FD
d
f
c
b
L14
: ‫اسم‬
L26
L13
S2
L43BALCONY
e
k
f
: ‫التوقيع‬
S3
S3
EF
L41
‫اعتماد‬
H.1
L29
: ‫اسم‬
e
EF
: ‫التوقيع‬
I
NEUTRAL WIRE(2.5Sq mm PVC
WIRE)
DB.3B.L1.02
(4BR-2 TYP)
: ‫اسم‬
DB.3B.L1.01
(3BR-2 TYP)
LIGHT POINT FOR CHANDELIER
: ‫عنــــوان المخـــطط‬
‫مخطط االنارة التفصيلي األول‬
DRG.NO:
SD-BU-3B-EL-102-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
LIGHTING LEGEND
SYMBOL DESCRIPTION
D1
D3
D4
D5
D6
F1
F2
F3
S1
S2
S3
EM
EX-W
WL
WL1
WL2
CL-1
3
1B
1B
2B
2A
1B
3B
1B
2B
CL-1
1B
2A
2
3B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
2B
3A
2A
0
POWER POINT FOR EXHAUST FAN
1B
EF EF
KEY PLAN
CL-1
POWER POINT FOR CHANDELIER LIGHT
SUB CONTRCTOR
2B
CH
: ‫توقيــع‬
1B
UP
ML
: ‫ختـــم‬
2B
WL3
‫ممثـــل المتعھـــد‬
2A
RECESSED DOWN LED LIGHT - 12W
WITH GEAR LOSS - 14W (IP-44)
RECESSED DOWN LED LIGHT - 6.5W
WITH GEAR LOSS - 8W (IP-20)
RECESSED DOWN LED LIGHT - 26W
WITH GEAR LOSS - 29W (IP-44)
RECESSED DOWN LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-20)
RECESSED DOWN LED LIGHT - 22W
WITH GEAR LOSS - 24W (IP-65)
RECESSED DOWN LED LIGHT - 13W
WITH GEAR LOSS - 14W (IP-20)
SURFACE MOUNTED LINEAR LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-66)
RECESSED MOUNTED LINEAR LED LIGHT - 4.8W
WITH GEAR LOSS - 6W (IP-65)
SURFACE MOUNTED LINEAR LED LIGHT - 26W
WITH GEAR LOSS - 28W (IP-40)
SURFACE MOUNTED LED LIGHT - 28W
WITH GEAR LOSS - 30W (IP-54)
SURFACE MOUNTED LED LIGHT - 14W
WITH GEAR LOSS - 16W (IP-65)
SURFACE MOUNTED LED LIGHT - 57W
WITH GEAR LOSS - 63W (IP-40)
SURFACE/RECESSED MOUNTED EMERGENCY LED LIGHT (SELF
CONTAINED) -8W WITH GEAR LOSS - 10W (IP-65)
WALL MOUNTED/SURFACE EMERGENCY EXIT SIGN (SELF CONTAINED) - 8W
WITH GEAR LOSS - 10W (IP-65)
SURFACE MOUNTED LIGHT LED - 15.5W
WITH GEAR LOSS - 17W (IP-65)
WALL MOUNTED DOWN LIGHT LED - 16.8W
WITH GEAR LOSS - 20W (IP-65)
WALL MOUNTED UP-DOWN LIGHT LED - 13.9W
WITH GEAR LOSS - 16W (IP-65)
WALL MOUNTED LED LIGHT - 17W
WITH GEAR LOSS - 20W (IP-66)
GROUND RECESSED UP LIGHT LED - 14.3W
WITH GEAR LOSS - 16W (IP-67)
SURFACE MOUNTED LED LIGHT - 18W
WITH GEAR LOSS - 20W (IP-43)
D2
1B
3A
CL-9
1B
2A
1B
2A
3A
1B
3A
1B
2A
1B
4
2A
7
CL-1
POWER POINT FOR UNDER CABINET LIGHTS (KITCHEN)
2A
1A
1B
CL-1
3B
LP
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
FLOOD LED LIGHT 104W
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1
2
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
16
1A
LEGEND AND ABBREVIATIONS
PHASE WIRE (2.5Sq mm PVC
WIRE)
NEUTRAL WIRE(2.5Sq mm PVC
WIRE)
L39
CH
S3 L38
h
g
d
c
b
BEDROOM 2
L31
b
a
L30 S3
S3
c
b
c d e
D6
L35
a
D1 L18
c
f
d
L22
D6
L10
a
L2
a
a
D6
a
L9
L19
D1
D6
L4
DINING
EF
b
LT/24
L5
c
EF
D6
EM
UP/DN
UP/DN
ET/5
FD
e
L18
ef g
L2
MAID'S ROOM
D4
k
j g
h L28
g
L30
ML k
FD
D4
L27
D
e
L26
S3
f
L33
L25
D4
BEDROOM 3
S3
S1
EM
k
LP
D3
g
L32
d
EF
c
L23
EM
L20
D1
D3
KITCHEN
L24 c
D3
L21
L22
ed c
d
FD
D1
L35
L34
C
TOILET
EF
j
D6
L15
j
a
b
D1
LT/20
LT/19
DB-4BR2\ B1
a
L3
D6
a
e
hg f e
L7
L36
D6
j L17
b
S3
a
L37
f
L8
D1
e
L43
FD
EF
f TOILET
A
e
LIGHT
FOR FAN(TYP.)
g
L10
f
L5
D1 b
EF
c
D6
a
b L48
c
L46
?
ML
e
L50
L18
S3
L13
f
g
LIVING ROOM
CH
L12 h
L11
b S3
f
L52
c
L40
S3
MASTER
BEDROOM
S3
L41
a
k
S2
b
k
BALCONY
L14
d
c
b
L39
e f D2
d
c L36
ML
e
L19
a
d
b
L20
S3
BED ROOM
L40
L47
L41
ML
L8
PD.
ML
L2
j
l
g EF
FD
D1
L9 e
LT/1
L5
k
L3
gfe
L11
f
a
k
d
GARBAGE
D6
L9
e
c ML TOILET
EF
FD
D1
L35
d
L7
j
L16
D6
L15
j
FOR EXHAUST FAN
cde
D3
b
D3
L24
D1
L20
DB-4BR2\ Y1
L23
D3
c
D3
LP
k
EF
d
e
S3
L26
EM
EXT/1
FOR EXHAUST
FAN
?
S1
S1
EM
f
?
L27
D4
g
MAID'S ROOM
L28 h
g j
k
D4
D6
L10
S3
x
y
z
a
D6 L11
a
b
c
c
L3
PD.
b D1
L5
FD
L7
EF
x
ML L6 y FD
c
b
c
d
L30
h
D1
j
EF
h
L38 S3
LIVING ROOM
e
g
S3
L13
D.1
CH
j
L39
f
L35
D6
a
S2
YASSER ABDULLAH
GGC
FAWAZ
OTIS
L37
g
L36
f
D6
S3
CH
L40
i
f
g
h
i
g
L41
DB-3BR-2\ Y2
a
d L24 D2
e
f
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
L31
L29
EF
e
L25
b
CLUSTER :
S3
ML L27
L43
FD
L28
D1
f
MASTER
BEDROOM
c
S3
PROTOYPE :
L26
A.1
TYPICAL FLOOR PLAN
LIGHTING LAYOUT
LIGHT POINT FOR FOR CHANDLIER
DB.3B.L2.05
(3BR-3A TYP)
LIGHTDB.3B.L2.04
POINT FOR CHANDELIER
(3BR-2 TYP)
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
L44
DB.3B.L2.06
(4BR-2 TYP)
‫دولة الكويت‬
DB-3BR-2\ R2
a
b
c
j
DINING ROOM
: ‫رقم المخطط التعاقدي‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
S3
b
‫يعتمـــد‬
STATE OF KUWAIT
e d c
S3 L30
a
d
BALCONY
ELECTRICAL
b
c
S3
S3
GGC
BU-EL-102-‫ب‬
BEDROOM 2
e
c
L14
a D3
h L42
b
L12 S3
DIWANIYA/
BEDROOM 3
L53
c
L18 D1
TOILET
z
D1 L8
k
DB-3BR-2\ Y1
DB-3BR-2\ B1
D6
EF
ML
d L4
b
L16
KITCHEN
a
D6 L1
AHEMD MOUSTAFA
L31
POWER POINT FOR UNDER CABIN LIGHT
L23
L33
ML
EF c
e
L32
MAID'S ROOM d
FD
b L21
FD
L20 c bMAID'S TOILET
c L34 d EF
D1
D1
a D4
L22
TOILET
ML d
a
a
L15 D3
DB-3BR-2\ R1
a
HVAC
MSB.3B.L2.01
UP/DN
LT/5
UBC
GGC
DATE
MAID'S
k MLFDTOILET
L29
DB.3B.GF.01\ B12
LT/4
NIRMEEN HAAL
AHEMD NAGEEB
SR. STURUCTURAL
PLAUMBING
SIGN
S3
f
FOR CABINET
UP/DN
LIGHT
?
?
ET/2
D1
UBC
ELEVATOR
L33
FOR EXHAUST FAN
D1
NASHWA AL-SAYED
BEDROOM 3
D4
L25
f
L32
g
COMPANY
FIRE FIGHTING
e
KITCHEN
c
a
gf
L22
L21
NAME
SR. ARCHITECT
L34
D6
LT/6
EM
FOYER
L2 a
a
DB-3BR-2
L12
j
b
a
b
c
d
L19
D6
b
a
?
TRADE
L36
D1
ELEC.
LT/3
DB.3B.GF.01\ Y10
a
S3
COORDINATION CERTIFICATION
L4
D6
LT/8
LT/7
ET/1
S3
S3
L25
a
S3
b
j
D6
j
?
ON / OFF PUSHBUTTON SWITCH @ 1250mm FROM FFL
L38
L17
LT/2
D6
b
c
d
e
S3
D1
EF
L6
S3
S3
b
c
ML
a
e f gh
b
L2
c
D1
PD
L7
c
L24
BALCONY
S2
d
L8
PB
b
F3
b
LIGHT POINT FOR CHANDLIER
e
DB-4BR2\ B1
k
g
L1
D1
L36
LT/10
F3
D1
j
S3
d
L22
S3
a
b
TOILET
D1
L10 e
L21
j
FD
a
g D1
F1
EF
L4
FD k
m CH
L23
d
EF
D6
e
D4
LT/11
ET/3
D6 a
L3
f
L18
e
L33
L1
ML
D6 L14
a
LIVING
S3
a
BEDROOM 2
L37
S3
f
LIGHT POINT
FOR FAN(TYP.)
L6
D6
a
?
L9
CH
S3
L45
L5
g
L10
f
c
EF
b D1
DB-3BR3\ Y2
DB-3BR3a\ R1
a DB-3BR3a\ Y1
b
D6
DINING
S3
EM
?
L46
h
LT/9
e
L32 e
f MAID'S
L35
EF TOILET
EF
g
MAID'S ROOM
d
f L34
h
MAID'S TOILET
c
LP
FOR EXHAUST FAN
(TYP)
D1
D1
D1
L29
L30
D1
L50
a
L47
EF
c
c
SINGLE POLE 2-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
j
D6
a
EM
S3
S3
a
DIWANIYA/
BEDROOM 4
S3
D1
L38 c
TOILET
f
b
MASTER BED
ROOM
S3
S3
a
FD
L42
L46
e
f D6
a
L49
f
TOILET
L37
D2
e
f
a
LT/12
FOYER
c
a
D1
l
d
e
f
j
M
D6
D4
D3
LT/13
L13
L15
D1
L43
L15
L31
ba
c
D6
c
e
L27
DB-3BR3a\ B1
D3
a
a L27 a
FOR WALL CABINET
LIGHT
L38
L44
SINGLE POLE 1-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
FD
e
ML
d ML
TOILET
L45
DB-4BR2\ Y2
f
SINGLE POLE 2-WAY SWITCH @ 1250mm FROM
FFL
DB-4BR2\ R1
D1
DB-4BR2\ R2
e
L18
FD
e
D6
c
L14
D1
?
c
b
D3
DB-3BR3a\ R2
L11
DB-3BR3\ B1
b
L28
EF e
ML
DB-4BR2\ R2
L51
a
b
L45
LP
D6
c L16
D6
c
L28
L26 D1
KITCHEN
D4
e
d
d
e
L32 EF
c D6
c
f
D1
c
DB-4BR2\
Y2
FD
D1
D6
j
d
a
L45
S3
a
L44
L39 D2
ML
d
D6
a
BEDROOM 2
c
L42
L9
a
FD
DB-4BR2\ R1
B
DINING ROOM
d
L6
POINT
CH
j
f ed
S3
S3
S3
L38
b
c
b
D6
L47
L43
L29
L31
L17
EF e
TOILET
EF
d
L1
UP/DN DB-3BR3a\ Y2
c
h L30 e
g
f MAID'S ROOM
DB-3BR3\ R2
S3
L51
c
b
a
D6
FD
D1 CORRIDOR
LT/14
b
a
D2 f
L46
FD
FOR WALL CABINET LIGHT
?
LT/15
D1
KITCHEN
a b
LT/16
D4
EF L33
MAID'S TOILET
f
h D1 g
ML
FD
WL
L35
a
FD
L2
b
j
S3
e
PD D1
c
ML
EM
ET/4
FOR EXHAUST FAN
(TYP)
D1
k
d
c
b
a
L16
ML c
LT/17
L13
b
c
d
L39
D3
b
D6
D1
c
e
f
a
b
c
d
L1
DB-3BR3\ Y1
DB-3BR3
D1 R1
DB-3BR3\
LT/18
L19
L4
D6
D1
L34
b
D3
fg
FOR EXHAUST FAN
LT/21
EXT/2
DB-4BR2\ Y1
e
D1
D1
?
STAIR
FOR EXHAUST
FAN
f
L31
UP
FOR CABINET
LIGHT
f
S1
EX-W
EF L29
MAID'S
j TOILET
h
D1
D6
L16
L10
a D6
a
FOYER
EF f
D6 a
SWITCH FOR CORRIDOR
LIGHT
L12 c
d
CH
c
D2 L39 def
b
a
L13
TOILET
f
a
D6 f
e
L48
ML
TOILET d
L40
EF
c
D1
E
L17
ML
CLOSET
WL
LT/22
FOR EXHAUST FAN
PD TOILET
f
e
d
D1 d
L6
f
gFD
c
D6
b
L3
ML
f
M
k
j
hg
D1 e
b
D1
LT/23
L16
b
g
TOILET
S3
c
f
L12
SINGLE POLE 1-WAY SWITCH @ 1250mm FROM
FFL
j
L47
L37 D2
f
S3
L49
ab
S3
L20
g
h
L11
g
L41
j
S3
c
L7
D3 L15
a
h
L22
L52
c
L40
LIVING ROOM
S3
S3 b
S3
L21
d
DB-3BR-2
a
ML
CH
m
S3
S3
g
BED ROOM
L23
S3
c
L8
a
LIVING
k
MASTER BED
S3 ROOM
L48
a
L42
S3
k
L24
d
L9
D6
L1 D6
FOYER
a
KITCHEN
MAID'S TOILET D4 a
D1
b c L20
c
d
L34
FD
EF
b
FD
L21
L32
d MAID'S ROOM
e
c EF
ML
L33
L23
POWER POINT FOR UNDER CABIN LIGHT
F
L4 d
ML
L3
EF
c
DB-3BR-2\ R1
L25
S3
DIWANIYA
FD
DB-3BR-2\ B1
DB-3BR-2\ Y1
TOILET
D1
a
S3
L11 D6
a
z
y
x
L5 PD.
D1 b
c
b
D3 a
L14
a
TOILET
L8 D1
z
FD y L6
ML
x
EF
L7
j
CH
S3
L37
m
HOME RUN TO DB
L42
ML
S3
a
d
‫تاريخ‬
G
i
h
g
f
c
b
LIVING ROOM
DINING ROOM
i L40
j
D6
f
L36
DB-3BR-2\ R2
L42 h
e
D1 FD
MASTER
BEDROOM
k
DIWANIYA/
BEDROOM 4
LIGHT POINT FOR CHANDLIER
CONDUIT FOR EMERGENCY
SUPPLY
: ‫التوقيع‬
DB-3BR-2\ Y2
S3 L12
b
L43
: ‫اسم‬
D2 L24 d
a
c
b
a
b
L25
L41
g
f
e
S3
S3
‫تد قيـــق‬
e
S3
S2
S3
L41
b
: ‫التوقيع‬
S3
S2
L26
BALCONY
m
DIWANIYA/
BEDROOM 3
L27 ML
L53
g
e
BALCONY
k L14
: ‫اسم‬
MASTER
BEDROOM
c
: ‫التوقيع‬
c
S2
S3
‫موافقة‬
H
L43
D1
TOILET
L28
FD
d
f
L13
CONDUIT
: ‫اسم‬
S3
L26
?
L44
TOILETf
EF
: ‫التوقيع‬
H.1
L29
EARTH WIRE(1.5Sq mm PVC
WIRE)
LIGHT POINT FOR FOR CHANDLIER
EX-W
e
EF
DB.3B.L2.03
(4BR-2 TYP)
‫اعتماد‬
I
DB.3B.L2.02
(3BR-3 TYP)
: ‫اسم‬
DB.3B.L2.01
(3BR-2 TYP)
LIGHT POINT FOR CHANDELIER
: ‫عنــــوان المخـــطط‬
‫مخطط االنارة التفصيلي المتكرر‬
DRG.NO:
SD-BU-3B-EL-103-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
LIGHTING LEGEND
SYMBOL DESCRIPTION
D1
D2
D3
D4
D5
D6
F1
F2
F3
S1
S2
S3
EM
EX-W
WL
WL1
3
2B
1B
2B
3B
2A
1B
1B
2B
CL-1
1B
2A
2
3B
2A
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
CL-1
1B
5
3B
CL-1
2B
1B
3A
CL-1
1B
3A
CL-1
2B
3A
0
2A
1B
3A
CL-9
1B
2A
1A
1B
2A
2A
3A
1B
CL-1
3B
1B
3A
1B
2A
4
2A
1B
POWER POINT FOR EXHAUST FAN
2B
EF EF
KEY PLAN
1B
POWER POINT FOR CHANDELIER LIGHT
SUB CONTRCTOR
2A
ML
CH
: ‫توقيــع‬
1B
WL3
UP
: ‫ختـــم‬
CL-1
WL2
‫ممثـــل المتعھـــد‬
1B
RECESSED DOWN LED LIGHT - 12W
WITH GEAR LOSS - 14W (IP-44)
RECESSED DOWN LED LIGHT - 6.5W
WITH GEAR LOSS - 8W (IP-20)
RECESSED DOWN LED LIGHT - 26W
WITH GEAR LOSS - 29W (IP-44)
RECESSED DOWN LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-20)
RECESSED DOWN LED LIGHT - 22W
WITH GEAR LOSS - 24W (IP-65)
RECESSED DOWN LED LIGHT - 13W
WITH GEAR LOSS - 14W (IP-20)
SURFACE MOUNTED LINEAR LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-66)
RECESSED MOUNTED LINEAR LED LIGHT - 4.8W
WITH GEAR LOSS - 6W (IP-65)
SURFACE MOUNTED LINEAR LED LIGHT - 26W
WITH GEAR LOSS - 28W (IP-40)
SURFACE MOUNTED LED LIGHT - 28W
WITH GEAR LOSS - 30W (IP-54)
SURFACE MOUNTED LED LIGHT - 14W
WITH GEAR LOSS - 16W (IP-65)
SURFACE MOUNTED LED LIGHT - 57W
WITH GEAR LOSS - 63W (IP-40)
SURFACE/RECESSED MOUNTED EMERGENCY LED LIGHT (SELF
CONTAINED) -8W WITH GEAR LOSS - 10W (IP-65)
WALL MOUNTED/SURFACE EMERGENCY EXIT SIGN (SELF CONTAINED) - 8W
WITH GEAR LOSS - 10W (IP-65)
SURFACE MOUNTED LIGHT LED - 15.5W
WITH GEAR LOSS - 17W (IP-65)
WALL MOUNTED DOWN LIGHT LED - 16.8W
WITH GEAR LOSS - 20W (IP-65)
WALL MOUNTED UP-DOWN LIGHT LED - 13.9W
WITH GEAR LOSS - 16W (IP-65)
WALL MOUNTED LED LIGHT - 17W
WITH GEAR LOSS - 20W (IP-66)
GROUND RECESSED UP LIGHT LED - 14.3W
WITH GEAR LOSS - 16W (IP-67)
SURFACE MOUNTED LED LIGHT - 18W
WITH GEAR LOSS - 20W (IP-43)
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
POWER POINT FOR UNDER CABINET LIGHTS (KITCHEN)
CL-7
2A
1B
1A
LP
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
FLOOD LED LIGHT 104W
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1
2
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
16
1A
LEGEND AND ABBREVIATIONS
PHASE WIRE (2.5Sq mm PVC
WIRE)
NEUTRAL WIRE(2.5Sq mm PVC
WIRE)
EARTH WIRE(1.5Sq mm PVC
WIRE)
LIGHT POINT FOR FOR CHANDLIER
L44
DB-3BR-2\ R2
G
L31
D1
L8TOILET
z
FD y L6
ML
x
EF
L7
d
c
b
b
a
L30 S3
c
L4 d
ML
L3
EF
c
FD
b
c d e
D6
L35
a
f
D1 L18
c
c
b
D3 a
L14
a
a
DB-3BR-2\ B1
KITCHEN
L16
b
a
D6
L9
L7/2
DB-4BR2\ Y2
S3
c
EF
?
a
d
EF
D6
FD
a
e
D6
a
L1
d
ML
L3
a
L7/15
L7/27
k
b
a
b
c
d
D3
a
D1
S1
UP/DN
S1
?
?
?
?
L7/26
?
D1
D1
L7/24
E7/3
L7/25
EM
L7/31
EX7/2
WL2
L7/33 WL2
D
D1
L7/22
L7/23
D1
L7/21
D1
L7/20
L7/30
L45
e
a
b S3
D1
TOILETc
L38
f
WL2L7/38
L39
ML
e
c
d
e
f
j
M
f
D1
L2
l
j
PD.
EF
L4
FD k
ML
D6 L14
a
L8
f
g EF
FD
L7
D1
TOILET
L9 e
L10
DINING
S3
d
S3
L40
L20
L47
L41
S3
a
E7/1
GARBAGE
F3
S3
L24
L20
LP
k
L24
D3
L23
cde
e
c
g
D3
EF
d
e
L26
?
EM
EM
f
L32
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
D4
L25
f
FOR
CABINET
UP/DN
LIGHT
f
?
L27
D4
S3
FAWAZ
ELEVATOR
L33
g
L28 h
MAID'S ROOM
g j
k
D4
OTIS
‫يعتمـــد‬
L31
k MLFD
L30
D1
MAID'S
h TOILET j
L29 EF
D.1
FOR EXHAUST FAN
D1
L7/12
: ‫رقم المخطط التعاقدي‬
BU-EL-103-‫ب‬
‫دولة الكويت‬
STATE OF KUWAIT
DB.3B.GF.01\ B9
D6
b
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AYTHORITY FOR HOUSING WELFARE
L11
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
WL2
S3
DATE
S3 BEDROOM 3S3
AD
L7/43
j
L7/42
WL2
CLUSTER :
WL2 L7/36
S2 BALCONY
L25
B
NIRMEEN HAAL
AHEMD NAGEEB
SR. STURUCTURAL
PLAUMBING
FIRE FIGHTING
k
LIGHT POINT FOR CHANDLIER
UBC
SIGN
L12
S3
j
D3
b
NASHWA AL-SAYED
ELEC.
?
d
L22
L7/41 L23
WL2L7/37
L7/13
FOR EXHAUST FAN
AD
f
L21
LIVING
m CH
WL2
EM
D6
FD
D1
L35
TOILET
d
gf
MSB.3B.L7.01
L7/11
L15
j
COMPANY
SR. ARCHITECT
L34
D6
DB.3B.GF.01\ B12
L7/44
S3
e
S3
BED ROOM
k
D6
b
?
j
L16
EF
NAME
c
d
c
b
L5
L6
e
S3
d
L18
F3
S1
S1
?
WL2
L7/10
gfe
D1
L19
a
j
l
D1
L7/14
L7/17
F1
b
L3
FOYER
L15
L7/18
D6 a
ML
b
D6
L13
c
D6
e f D2
d
c L36
b
MASTER BED
ROOM
S3
a
KITCHEND3
a
a L27 a
WL2 CABINET
FOR WALL
LIGHT L7/40
DB-3BR3a\ R2
L46
WL2
D3
L28
D1
L1
DB-3BR3a\ B1
c
b
FD
L42
d
c
b
b
L37
D2
ba
DB.3B.GF.01\ R6
EM
D1
WL2
DB-3BR3a\ R1
a DB-3BR3a\ Y1 L7/45
L7/39
L26 D1
LP
EF e
ML
AD
AD
c D6
c
f
L29
D6
c L16
L17
FD
C
c
E7/2
L7/19
WL2
FOR EXHAUST FAN
D4
WL2
EF L33
(TYP)
h L30 e
g ROOM
MAID'SL34TOILET
f MAID'S
f
DB.3B.GF.01\
Y6
h D1 g
ML
L31 D4
FD
L35
e
d
d e
DB-3BR3a\ Y2
L32 EF
EF e
TOILETL43
D1
L44 c
d
L7/34
D1
EM
EX-W
EM
D1
D1
c ML
FOR EXHAUST
FAN
?
EX-W
WL2
KITCHEN
c
L19
?
e
DB-4BR2\ Y1
EX7/1
L7/32
TRADE
L36
L22
L21
D1
D1
COORDINATION CERTIFICATION
L4
D6
ON / OFF PUSHBUTTON SWITCH @ 1250mm FROM FFL
b
L7
c
L7/16
E
a
PB
L38
S3
j
D6
j
a
BEDROOM 2 b
L37
L17
e f gh
DB-4BR2\ B1
D1
e
S3
S3
b
b
PDL2
c
D1
L8
S3
LIGHT POINT
FOR FAN(TYP.)
L6
DB.3B.GF.01\ B6
SWITCH FOR
CORRIDOR LIGHT
EM
L46
L5
WL2
WL2
SINGLE POLE 2-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
S3
f
L9
g
?
CH
L10
f
L45
L7/1
AD
j
D6
a
e
ML
b D1
L47
L7/29
L50
DB-4BR2\ R2
DB.3B.L7.02
(4BR-2 TYP)
D6
a
SINGLE POLE 1-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
FD
c
b
L48
AD
EF WL2
E7/4
a
D6 f
e
D1
L7/28
L7/3
WL2
SINGLE POLE 2-WAY SWITCH @ 1250mm FROM
FFL
DB-4BR2\ R1
f
L51
TOILET
D1
L49
DB-3BR-2
a
S3
SINGLE POLE 1-WAY SWITCH @ 1250mm FROM
FFL
c
D2 L39 def
j
a
CORRIDOR
D1
D3 L15
a
S3
c
b
a
L13
L18
a
L2
f
h L12
LIVING
ROOM
CH
L11
f
L7/9
D6
L10
a
DB-3BR-2\ R1
d
a
ML
L22
a
D1
TOILET
MAID'S TOILET D4
D1
b cMAID'S
c
L20 ROOM
FD
EF d L34
FD
L21 b
L32
d
e
c EF
ML
L33
L23
POWER POINT FOR UNDER CABIN LIGHT
L52
g
D6
L1 D6
FOYER
a
DB-3BR-2\ Y1
g
L11 D6
a
z
y
x
L5 PD.
D1 b
BEDROOM 2
S3
F
S3 L38
h
L7/4
b
S3
LIVING
L39ROOM
j
CH
g
L37
S3
a MASTER
L40
BEDROOM
c
HOME RUN TO DB
‫تاريخ‬
D6
f
L36
j DINING ROOM
i
i L40
h
CH
g
f
S3 WL2
k
L42
ML
: ‫التوقيع‬
DB-3BR-2\ Y2
DIWANIYA/
BEDROOM 4
: ‫اسم‬
e
D2 L24 d
a
c
b
a
b
L7/7
S3 L12
b
L42 h
S3
CONDUIT FOR EMERGENCY
SUPPLY
L43
e
TOILET
D1 FD d
‫تد قيـــق‬
S3
L41
g
S3
S2
: ‫التوقيع‬
f
e
S3
S3
b
: ‫التوقيع‬
L27 ML
L53
g
WL2
L7/6
FD
MASTER
BEDROOM
L25
e
L7/8
CONDUIT
‫موافقة‬
H
D1
TOILET
L28
d
f
c
L13 c
DIWANIYA/
WL2
BEDROOM 3
BALCONY
S2
BALCONY
k
L14
f
: ‫اسم‬
L26
L43
WL2
S3
EF
L41
: ‫التوقيع‬
H.1
S3
L29
: ‫اسم‬
e
EF
‫اعتماد‬
I
: ‫اسم‬
DB.3B.L7.01
(3BR-2 TYP)
LIGHT POINT FOR CHANDELIER
PROTOYPE :
k
WL2
L7/5
A.1
L7/35 WL2
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
LEVEL 7 FLOOR PLAN
LIGHTING LAYOUT
A
: ‫عنــــوان المخـــطط‬
DB.3B.L7.03
(3BR-3A TYP)
‫مخطط االنارة التفصيلي السابع‬
DRG.NO:
SD-BU-3B-EL-104-A
DRAWN BY:
CHKED.BY:
Checker
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
LIGHTING LEGEND
SYMBOL DESCRIPTION
D1
D2
D3
D4
D5
D6
F1
F2
F3
S1
S2
S3
EM
EX-W
WL
WL1
WL2
KEY PLAN
3
1B
1B
2B
1B
2A
1B
3B
1B
2B
CL-1
1B
2A
2
3B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2B
3A
0
2A
1B
POWER POINT FOR EXHAUST FAN
SUB CONTRCTOR
1B
POWER POINT FOR CHANDELIER LIGHT
EF EF
: ‫توقيــع‬
2A
ML
CH
: ‫ختـــم‬
2B
UP
‫ممثـــل المتعھـــد‬
CL-1
WL3
RECESSED DOWN LED LIGHT - 12W
WITH GEAR LOSS - 14W (IP-44)
RECESSED DOWN LED LIGHT - 6.5W
WITH GEAR LOSS - 8W (IP-20)
RECESSED DOWN LED LIGHT - 26W
WITH GEAR LOSS - 29W (IP-44)
RECESSED DOWN LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-20)
RECESSED DOWN LED LIGHT - 22W
WITH GEAR LOSS - 24W (IP-65)
RECESSED DOWN LED LIGHT - 13W
WITH GEAR LOSS - 14W (IP-20)
SURFACE MOUNTED LINEAR LED LIGHT - 24W
WITH GEAR LOSS - 26W (IP-66)
RECESSED MOUNTED LINEAR LED LIGHT - 4.8W
WITH GEAR LOSS - 6W (IP-65)
SURFACE MOUNTED LINEAR LED LIGHT - 26W
WITH GEAR LOSS - 28W (IP-40)
SURFACE MOUNTED LED LIGHT - 28W
WITH GEAR LOSS - 30W (IP-54)
SURFACE MOUNTED LED LIGHT - 14W
WITH GEAR LOSS - 16W (IP-65)
SURFACE MOUNTED LED LIGHT - 57W
WITH GEAR LOSS - 63W (IP-40)
SURFACE/RECESSED MOUNTED EMERGENCY LED LIGHT (SELF
CONTAINED) -8W WITH GEAR LOSS - 10W (IP-65)
WALL MOUNTED/SURFACE EMERGENCY EXIT SIGN (SELF CONTAINED) - 8W
WITH GEAR LOSS - 10W (IP-65)
SURFACE MOUNTED LIGHT LED - 15.5W
WITH GEAR LOSS - 17W (IP-65)
WALL MOUNTED DOWN LIGHT LED - 16.8W
WITH GEAR LOSS - 20W (IP-65)
WALL MOUNTED UP-DOWN LIGHT LED - 13.9W
WITH GEAR LOSS - 16W (IP-65)
WALL MOUNTED LED LIGHT - 17W
WITH GEAR LOSS - 20W (IP-66)
GROUND RECESSED UP LIGHT LED - 14.3W
WITH GEAR LOSS - 16W (IP-67)
SURFACE MOUNTED LED LIGHT - 18W
WITH GEAR LOSS - 20W (IP-43)
3A
CL-9
1B
2A
1A
2A
1B
2A
3A
1B
CL-1
1B
3A
2A
1B
2A
1B
4
POWER POINT FOR UNDER CABINET LIGHTS (KITCHEN)
3B
LP
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
FLOOD LED LIGHT 104W
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1
2
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
1A
LEGEND AND ABBREVIATIONS
16
PHASE WIRE (2.5Sq mm PVC
WIRE)
NEUTRAL WIRE(2.5Sq mm PVC
WIRE)
EARTH WIRE(1.5Sq mm PVC
WIRE)
CONDUIT
I
WL
H.1
WL
LR21
CONDUIT FOR EMERGENCY
SUPPLY
LR23
HOME RUN TO DB
H
SINGLE POLE 1-WAY SWITCH @ 1250mm FROM
FFL
LR6
WL
WL
LR7
SINGLE POLE 2-WAY SWITCH @ 1250mm FROM
FFL
LR22
WL
WL
LR5
SINGLE POLE 1-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
SINGLE POLE 2-WAY SWITCH (WEATHERPROOF) @ 1250mm FROM FFL
WL
LR20
PB
ON / OFF PUSHBUTTON SWITCH @ 1250mm FROM FFL
COORDINATION CERTIFICATION
G
TRADE
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
SR. STURUCTURAL
PLAUMBING
WL
WL
LR4
LR8
WL
LR19
WL
LR1
EXR2
DB.3B.GF.01\ B11
LR16
WL
WL
LR10
WL
a
ER2
c
LR11
F1
S1
S1
?
?
?
?
EM
b
EM
: ‫التوقيع‬
: ‫اسم‬
WL
UP/DN
D.1
EM
F1
F1
ER1
LR29
c
: ‫اسم‬
: ‫اسم‬
LR24
FOR ROOF LIGHTS
S1 LR26
EM
a
LR25
a
CORRIDOR
S1
‫تاريخ‬
LR2
EX-W
WL
‫يعتمـــد‬
EX-W EXR1
‫تد قيـــق‬
E
‫موافقة‬
LR17 WL
WL
: ‫التوقيع‬
LR18
: ‫اسم‬
DB.3B.GF.01\ R7
OTIS
: ‫التوقيع‬
ELEVATOR
F
DATE
FAWAZ
FIRE FIGHTING
LR3
: ‫التوقيع‬
WL
WL
‫اعتماد‬
LR9
SIGN
LR28
b
LR27
BU-EL-104-‫ب‬
b
: ‫رقم المخطط التعاقدي‬
PUMP ROOM
D
STATE OF KUWAIT
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
WL
LR12
LR15
WL
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
C
WL
LR13
CLUSTER :
WL
LR14
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
B
ROOF PLAN
LIGHTING LAYOUT
A.1
: ‫عنــــوان المخـــطط‬
A
‫مخطط االنارة التفصيلي السطح‬
DRG.NO:
SD-BU-3B-EL-105-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
1500
TRENCH SIZE 1000(W)X1200(D)mm
(TYPICAL)
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
MSB.3B.GF.01
ELECTRICAL
ROOM
: ‫توقيــع‬
TRENCH SIZE 900(W)X1200(D)mm
(TYPICAL)
SUB CONTRCTOR
900
DB.3B.GF.03
KEY PLAN
1B
2B
1B
3
2B
1B
CL-1
DB.3B.GF.01
DB.3B.GF.02
2A
1B
3B
1B
2B
CL-1
2A
1B
1B
1B
2A
1B
1B
2A
6
1
1B
3A
3A
1B
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
2B
3A
1B
3A
CL-9
1B
Ground Floor_ELECTRICAL ROOM
2A
1A
2A
3A
1B
3A
1B
2A
1B
4
2A
7
CL-1
SCALE - 1 : 50
2A
1B
1B
CL-1
3B
SD-BU-3B-EP-101-A
0
2A
2
3B
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1
2
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
1A
16
LEGEND AND ABBREVIATIONS
SYMBOLS
I
CONDUIT EMBEDDED IN FLOOR/SCREED SLAB
H.1
E.3B.06
DESCRIPTION
13A 3PIN SW SOCKET @ 450mm FROM FFL
13A 3PIN SW TWIN SOCKET @ 450mm FROM FFL
CONDUIT EMBEDDED IN CEILING SLAB
13A 3PIN SW SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
E.3B.05
13A 3PIN SW TWIN SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
G.S CONDUIT SURFACE MOUNTED
13A 3PIN SW SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
13A 3PIN SW TWIN SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
H
CONTROL PANEL FOR EQUIPMENT (WEATHERPROOF TYPE)
DB.3B.GF.03\ Y9
TRANSFORMER
ROOM
JB.2
DB.3B.GF.03/Y4
P16
D
TO RING EARTH
E.3B.05
FOR EU.3B.01
20A.SPUR.-1 OUTLET
FOR EVAPORATOR UNIT
LOBBY
P23
121
POWER
121
100W
12.100
HVAC
121
65W
7.865
TOTAL LOAD
DP.2
DB.3B.GF.03/R2
OFFICE
P22
GARBAGE
CHUTE
P5
GUARDS
QUARTER
P4
RETAIL
900mm CABLE TRAY
RISE TO UPPER LEVELS
(1000X600mm OPENING IN
CEILING SLAB)
2
SD-BU-3B-EP-101-A
ELECTRICAL
ROOM
P1
P17
P20
DB.3B.GF.02/B3
DB.3B.GF.02/R4
NEUTRAL
PHASE
DB.3B.GF.03/Y3
DB.3B.GF.03/Y1
DB.3B.GF.03/R4
TO RING EARTH
E.3B.06
TO RING EARTH
E.3B.05
COORDINATION CERTIFICATION
TRADE
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
SR. STURUCTURAL
PLAUMBING
DB.3B.GF.02
4x25mm²+1x16mm² WIRE
50mm DIA UPVC CONDUIT
FED FROM MSB.3B.GF.02
ELEVATOR
E.3B.01
TO RING EARTH
E.3B.05
TO RING EARTH
E.3B.06
RETAIL-DB
(12 WAY
DB)
DB.3B.GF.02/R1
TELECOM
8x150mm DIA UPVC
DUCTS FOR OUTGOING CABLES
2x150mm DIA UPVC DUCT SPARE
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
BU-EP-100-‫ب‬
STATE OF KUWAIT
DB.3B.GF.03/B1
DB.3B.GF.03
4x25mm²+1x16mm² WIRE
50mm DIA UPVC CONDUIT
FED FROM MSB.3B.GF.02
‫يعتمـــد‬
D.1
8x150mm DIA UPVC
DUCTS FOR OUTGOING CABLES
2x150mm DIA UPVC DUCT SPARE
IL-0.696
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
E.3B.07
P2
CLUSTER :
B
PROTOYPE :
A.1
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
GROUND FLOOR PLAN
POWER LAYOUT
E.3B.08
A
: ‫اسم‬
: ‫التوقيع‬
4x150mm + 4x100mm DIA UPVC DUCTS
IN TWO ROWS (950mm BELOW GROUND)
FOR HT CABLE INTAKE
IL-0.571
DATE
OTIS
IL-0.696
20A.SPUR.-3 OUTLET
FOR EVAPORATOR UNIT
DB.3B.GF.03/Y2
20A.SPUR.-5 OUTLET
FOR EVAPORATOR UNIT
SIGN
FAWAZ
FIRE FIGHTING
1000x1000x1200mm DEEP MANHOLE
WITH CAST IRON COVER
P18
C
FOR ELECT. WATER
HEATER
DB.3B.GF.03/R3
32A.SPN.ISOL-2
FOR CONDENSING UNIT
E.3B.04
20A.SPN.ISOL-3
STAIR
FOR CONDENSING UNIT
P11
20A.SPN.ISOL-5
FOR CONDENSING UNIT
DB.3B.GF.02/Y1
3B-GF-04
120.744 m²
20A.SPUR.-4 OUTLET
FOR EVAPORATOR UNIT
DB.3B.GF.02/B4
E.3B.04
SERVICE AND UNITS RISER
P3
EARTH
: ‫التوقيع‬
JB
20A.SPUR.-2 OUTLET
FOR EVAPORATOR UNIT
2.420
22.385
FOR ELECT. WATER
HEATER
DB.3B.GF.02/Y4
P19
DB.3B.GF.03/R1
LIGHT
W/Sq.
M20W
PHASE
‫تاريخ‬
P14
TOILET
JB
AREA
P6
DB.3B.GF.02/R2
4x10.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
NEUTRAL
‫تد قيـــق‬
32A.SPN.ISOL-4
FOR CONDENSING UNIT
P12
LOBBY
TOTAL LOAD
IN kW
EARTH
‫موافقة‬
32A.TPN.ISOL-1
FOR CONDENSING UNIT
RETAIL LOAD
DB.3B.GF.03/B4
1505
DB.3B.GF.02/Y3
DB.3B.GF.02/R3
STAIR
DB.3B.GF.03/RYB5
DP.1
CORE & SHELL
P13
WATER TANK
ROOM
P8
DB.3B.GF.03\ B9
CONTROL PANEL FOR
BOOSTER PUMP SET
FROM DB.3A.GF.01
C.P.1
E
4x6.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
DISTRIBUTION BOARD
‫اعتماد‬
P7
20A.SPN.ISOL
FOR CONDENSING UNIT
E.3B.03
C.P.
DB.3B.GF.02/RYB10
DB.3B.GF.02\ RYB6
DB
: ‫اسم‬
P10
P21
2x6.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
COOKER CONTROL UNIT @ 1600mm FROM FFL AND
COOKER CONNECTION UNIT @ 450mm FROM FFL
1000x1000x1200mm DEEP MANHOLE
WITH CAST IRON COVER
P9
20A TPN FOR GARBAGE
EARTH PIT
20A.SPN.ISOL-6
FOR CONDENSING UNIT
8x150mm DIA UPVC
DUCTS FOR OUTGOING CABLES
2x150mm DIA UPVC DUCT SPARE
IL-0.696
LT ROOM
12Nos. 100mm DIA UPVC DUCTS FOR
LT CABLES TO MLTB-3B
DB.3B.GF.02/B2
TOILET JB.1
4x4.0+1x2.5mm2 CU/PVC WIRES IN
∅25mm PVC CONDUIT
TPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
20A.SPUR FOR
EVAPORATOR UNIT
FOR ISOL FOR LIFT-1, 2 & 3
(AT HIGH LEVEL)
FROM MSB.3B.GF.02
2x4.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
SPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
E.3B.02
STORAGE
∅25mm PVC CONDUIT
DOUBLE POLE SWITCH @ 1250mm FROM FFL
20A.SPUR FOR
EVAPORATOR UNIT
G
4x2.5mm2+2x1.0mm2 CU/PVC WIRE IN
20A SWITCHED SPUR UNIT ADJACENT TO A/C UNIT
DB.3B.GF.03\ B2
TO RING
EARTH E.3B.06
2x2.5mm2+1x1.0mm2 CU/PVC WIRE IN
∅20mm PVC CONDUIT
WALL MOUNTED JUNCTION BOX (FLEX OUTLET PLATE) ADJACENT TO
EQUIPMENT
JB
F
RDB
13A 3PIN SW TWIN SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @
1250mm FROM FFL
C.P
P15
ROUND DRAW BOX
13A 3PIN SW SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @ 1250mm
FROM FFL
E.3B.1
: ‫اسم‬
E.3B.10
E.3B.09
: ‫عنــــوان المخـــطط‬
‫مخطط القوى التفصيلي للدور االرضي‬
1
Ground Floor_POWER
SCALE - 1 : 100
DRG.NO:
SD-BU-3B-EP-101-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
16
1B
2B
1B
3
2B
1B
CL-1
KEY PLAN
2A
1B
3B
1B
2B
CL-1
2A
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
2B
1B
3A
3A
1B
5
3B
CL-1
CL-1
2B
3A
0
2A
1B
FOR WATER HEATER(TYP.)
3A
CL-9
1B
2A
1B
2A
3A
1B
3A
1B
2A
1B
4
2A
7
CL-1
JB4
2A
1A
1B
CL-1
3B
I
DB.3B.L1.02
(4BR-2 TYP)
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
DB.3B.L1.01
(3BR-2 TYP)
2A
1B
1A
CL-8
2A
1B
1A
2B
3A
1B
1A
1B
2B
DB-3BR-2\ R5
P9
TOILET
H
P7
DB-3BR-2\ B9
P15
DP4
P2
JB
P18
DB-3BR-2\ R7
DP3
JB3
KITCHEN
DB-3BR-2\ B7
JB
DESCRIPTION
JB
13A 3PIN SW TWIN SOCKET @ 450mm FROM FFL
13A 3PIN SW TWIN SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
DB-3BR-2\ R4
G.S CONDUIT SURFACE MOUNTED
BEDROOM 2
13A 3PIN SW TWIN SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
?
DB-4BR2\ Y3
DB-4BR2\ Y4
4x2.5mm2+2x1.0mm2 CU/PVC WIRE IN
WALL MOUNTED JUNCTION BOX (FLEX OUTLET PLATE) ADJACENT TO
EQUIPMENT
JB
P22
∅25mm PVC CONDUIT
20A SWITCHED SPUR UNIT ADJACENT TO A/C UNIT
2x4.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
SPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
DB-4BR2\ R8
DB-4BR2\ B4
P1
DB-4BR2\ Y8
DB-4BR2\ Y9
DB-4BR2\ R6 P8
DB-4BR2\ Y7
DB-4BR2\ Y6
P13
P14
EARTH PIT
JB3
DB
JB
DP3
JB
4x4.0+1x2.5mm2 CU/PVC WIRES IN
∅25mm PVC CONDUIT
TPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
2x6.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
COOKER CONTROL UNIT @ 1600mm FROM FFL AND
COOKER CONNECTION UNIT @ 450mm FROM FFL
TOILET
P9
PD
2x2.5mm2+1x1.0mm2 CU/PVC WIRE IN
∅20mm PVC CONDUIT
CONTROL PANEL FOR EQUIPMENT (WEATHERPROOF TYPE)
DOUBLE POLE SWITCH @ 1250mm FROM FFL
P1
B10,Y10,Y11,RYB12 FOR
CONDENSING UNITS TO THE RISER
RDB
13A 3PIN SW TWIN SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @
1250mm FROM FFL
C.P
DB-4BR2\ B9
DB-4BR2\ R4
ROUND DRAW BOX
13A 3PIN SW SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @ 1250mm
FROM FFL
P7
?
CONDUIT EMBEDDED IN CEILING SLAB
13A 3PIN SW SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
13A 3PIN SW SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
DB-3BR-2\ B5
4x6.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
DISTRIBUTION BOARD
EARTH
P15
4x10.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
NEUTRAL
PHASE
JB2
P19
P11
EARTH
NEUTRAL
DB-3BR-2\ Y4
F
SYMBOLS
DP1
CORRIDOR
P17
MAID'S ROOM
LEGEND AND ABBREVIATIONS
DB-4BR2\ R9
TOILET
DB-3BR-2\ R6
MICROWAVE OVEN
1A
2B
1A
MASTER
BEDROOM
JB
R9,R10,R11,RYB12 FOR
CONDENSING UNITS TO THE RISER
GAS IGNITER
P23
P16
MAID'S TOILET
TOILET
P23
DB-3BR-2\ Y5
P25
CL-1
2A
1A
3B
P24
DB-3BR-2
P10
P22
REFRIGERATOR
JB
TOILET
JB2
CL-2
1A
1A
DP4
DB-4BR2\ B6
P4
DB-4BR2\ R7
FOYER
2B
1A
3A
TOILET
DP1
FOR WATER HEATER
1B
CONDUIT EMBEDDED IN FLOOR/SCREED SLAB
DB-3BR-2\ Y8
DB-3BR-2\ Y10
P21
1B
2B
3A
P28
DB-3BR-2\ R3
DP2
WASHING M/C/ DRYER
1B
2A
P5
PD.
DB-3BR-2\ Y6
CL-3
1A
2A
1A
JB1
P8
CL-4
3A
P6
DB-3BR-2\ Y3
DB-3BR-2\ B10
DB-3BR-2\ B3
1A
DB-4BR2\ R3
P2
P19
BEDROOM 2
1B
13A 3PIN SW SOCKET @ 450mm FROM FFL
DB-3BR-2\ B4
G
2A
2B
LIVING ROOM
JB1
FOR WATER HEATER
3A
2B
P25
P4
LIVING ROOM
DINING ROOM
3B
1B
3B
DIWANIYA/
BEDROOM 4
DB-3BR-2\ Y9
P11
DB-3BR-2\ R8
DB-3BR-2\ Y7
P20
P3
P10
P6
1A
DB-4BR2\ B7
BALCONY
P5
MASTER P12
BEDROOM
CL-5
1B
2A
3B
KITCHEN
?
P24
DP2
DB-4BR2\ Y10
FOR WATER HEATER
DB-4BR2\ Y5
PHASE
DB-4BR2\ B5
P16
DB-4BR2\ R5
BEDROOM 3 DB-4BR2\ B3
COORDINATION CERTIFICATION
P12
E
P21
TRADE
P20
CORRIDOR
?
P15
Y10,B10,R11,RYB12 FOR
CONDENSING UNITS TO THE RISER
DB-3BR3a\ B5
KITCHEN
p10
DP3
ELEC.
DP2
ELEVATOR
MICROWAVE OVEN
MAID'S ROOM
P17
DB-3BR-2\ R7
DB-3BR-2\ B7
DB-3BR-2\ R6
JB2
DINING
p6
JB
C
DB-3BR-2\ Y5
DB-3BR-2\ R4
P1
FOYER
P16
P23
GAS IGNITER
R9,R10,R11,RYB12 FOR
CONDENSING UNITS TO THE RISER
MAID'S TOILET
KITCHEN
P22
DB-3BR-2\ Y10
P18
JB2
DP2
DB-3BR-2\ Y6
P8
BEDROOM 2
P19
p19
p3
p7
TOILET
p8
LIVING ROOM
LIVING ROOM
DINING ROOM
P11
P6
p12
P2 DIWANIYA/
BEDROOM 3
B
P15
DP4
P7
P12
P5
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
MASTER
BEDROOM
PUBLIC AUTHORITY FOR HOUSING WELFARE
P9
DB-3BR-2\ R5
P3
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
STATE OF KUWAIT
FOR WATER HEATER
JB1
P4
DB-3BR3a\ B7
P20
DB-3BR-2\ B4
DP1
p18
FOR WATER HEATER
JB
DB-3BR3a\ Y4
BU-EP-101-‫ب‬
LIVING
p15
BED ROOM
DB-3BR-2\ B3
WASHING M/C/ DRYER
DB-3BR-2\ R3
JB
p16
p20
PD.
p2
DB-3BR-2\ B10
FOR WATER HEATER
DB-3BR-2\ Y8
?
‫يعتمـــد‬
DP3
P25
P10
TOILET
JB
DB-3BR-2\ Y5
DB-3BR-2
p17
ROOM
OTIS
JB3
REFRIGERATOR
P21
p9
FAWAZ
FIRE FIGHTING
DB-3BR-2\ Y4
DB-3BR-2\ B5
DB-3BR3a\ B9
MASTER BED
DB-3BR3a\
R4
GGC
: ‫اسم‬
P24
DB-3BR3a\ R9
DB-3BR3a\ Y9
YASSER ABDULLAH
‫تد قيـــق‬
TOILET
ELECTRICAL
DATE
DP1
DB-3BR3a\ R3
JB
GGC
: ‫التوقيع‬
TOILET
DB-3BR3a\ Y7
900mm CABLE TRAY
(1000X600mm OPENING IN
CEILING SLAB)
P11
DB-3BR3a\ R7
TOILET
JB3
AHEMD MOUSTAFA
FOR WATER HEATER
JB4
DP4
HVAC
‫موافقة‬
p11
P12
DB.3B.GF.02\ R5
PD.
DB-3BR3a\ R5
DB-3BR3a\ B3
p24
UBC
GGC
: ‫اسم‬
JB
p23
DB-3BR3a\ Y3
DB-3BR3a\ B8
D.1
25mm SLEEVE TO GROUND
TEL. ROOM
GARBAGE
p4
JB1
DB-3BR3a\ Y5
FOYER
p22
P14
p1
JB
p21
NIRMEEN HAAL
AHEMD NAGEEB
SR. STURUCTURAL
PLAUMBING
: ‫التوقيع‬
DB-3BR3a\ B4
DB-3BR3a\ B6
P18
MAID'S TOILET
‫اعتماد‬
p13
UBC
: ‫اسم‬
p5
NASHWA AL-SAYED
SIGN
JB
DB-3BR3a\ R10
DB-3BR3a\ R6
DB-3BR3a\ Y6
MAID'S TOILET MAID'S ROOM
D
MAID'S ROOM P17
P13
p14
COMPANY
SR. ARCHITECT
?
?
NAME
: ‫اسم‬
P14
P3
CL-6
2A
1A
: ‫التوقيع‬
H.1
JB4
JB
P13
P27
P26
1B
1B
3A
FOR WATER HEATER
CL-7
2A
1A
‫تاريخ‬
2
: ‫التوقيع‬
1
P14
JB4
P13
A.1
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
A
DB.3B.L1.04
(3BR-3A TYP)
DB.3B.L1.03
(3BR-2 TYP)
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
FIRST FLOOR PLAN
POWER LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط القوى التفصيلي للدور االول‬
DRG.NO:
SD-BU-3B-EP-102-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
6
7
8
8.1
8.2
9
10
12
14
15
16
3
1B
2B
1B
FOR WATER HEATER(TYP.)
CL-1
KEY PLAN
2A
3B
1B
1B
2B
CL-1
DB.3B.L2.03
(4BR-2 TYP)
1B
DB.3B.L2.02
(3BR-3 TYP)
13
BEDROOM 3 DB-4BR2\ B3
P20
COORDINATION CERTIFICATION
MAID'S ROOM P17
P18
MAID'S TOILET
D.1
MICROWAVE OVEN
DB-3BR-2\ R4
P1
FOYER
P10
P22
JB
JB
p7
GGC
OTIS
JB
DB-3BR-2\ B10
DB-3BR-2\ B3
TOILET
DB-3BR-2\ Y6
P8
BEDROOM 2
‫اعتماد‬
P20
FOR WATER HEATER
JB
JB1
LIVING ROOM
LIVING ROOM
P2 DIWANIYA/
BU-EP-102-‫ب‬
DINING ROOM
P11
P6
JB
BEDROOM 3
P15
DP4
P7
P12
P5
JB
P27
DB-4BR2\ B7
BALCONY
BALCONY DB-3BR-2\ R5
P3
P3
P26
FOR WATER HEATER(TYP.)
DB.3B.L2.05
(3BR-3A TYP)
P14
JB4
P13
DB.3B.L2.04
(3BR-2 TYP)
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
STATE OF KUWAIT
MASTER
BEDROOM
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
A.1
PUBLIC AUTHORITY FOR HOUSING WELFARE
FOR WATER HEATER
JB4
DB.3B.L2.06
(4BR-2 TYP)
JB
P10
P25
‫يعتمـــد‬
DP2
P9
MASTER
BEDROOM
FAWAZ
DB-3BR-2\ B4
p8
p12
YASSER ABDULLAH
WASHING M/C/ DRYER
DB-3BR-2\ R3
DP1
p18
ELECTRICAL
DATE
FOR WATER HEATER
DB-3BR-2\ Y10
PD.
GGC
SIGN
JB3
P18
JB2
DB-3BR-2\ Y5
p2
AHEMD MOUSTAFA
DP3
P25
KITCHEN
HVAC
: ‫اسم‬
DB-3BR-2\ Y5
REFRIGERATOR
UBC
GGC
ELEVATOR
TOILET
JB
JB
P23
GAS IGNITER
R9,R10,R11,RYB12 FOR
CONDENSING UNITS TO THE RISER
NIRMEEN HAAL
AHEMD NAGEEB
: ‫التوقيع‬
MAID'S ROOM
MAID'S TOILET
P17
DB-3BR-2\ R7
DB-3BR-2\ B7
P16
UBC
FIRE FIGHTING
DB-3BR-2\ Y4
DB-3BR-2\ B5
NASHWA AL-SAYED
SR. ARCHITECT
‫موافقة‬
DP2
COMPANY
: ‫اسم‬
P24
NAME
: ‫التوقيع‬
ELEC.
TRADE
SR. STURUCTURAL
PLAUMBING
1x750mm CABLE TRAY UP TO LEVEL-3
1x750mm CABLE TRAY UP TO LEVEL-7
(1000X600mm OPENING IN FLOOR SLAB
UPTO LEVEL-3)
p3
DB-3BR3a\ B7
4x10.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
PHASE
: ‫اسم‬
JB
JB
EARTH
LIVING
P2
4x6.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
DISTRIBUTION BOARD
NEUTRAL
1x750mm CABLE TRAY
(1000X300mm OPENING IN FLOOR SLAB
FOR SERVICES CIRCUITS & CONDENSER
UNITS ON THE ROOF
TEL. ROOMPT2
PT1
P28
TOILET
CL-9
1B
DB
DB-4BR2\ B5
MSB.3B.L2.01
BALCONY
DIWANIYA/
BEDROOM 4
2x6.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
COOKER CONTROL UNIT @ 1600mm FROM FFL AND
COOKER CONNECTION UNIT @ 450mm FROM FFL
EARTH
P4
P5
EARTH PIT
DB-4BR2\ Y5
P19
DB-3BR3a\ Y4
4x4.0+1x2.5mm2 CU/PVC WIRES IN
∅25mm PVC CONDUIT
TPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
STAIR
LIVING ROOM
DB-4BR2\ R9
DB-4BR2\ R3
2A
p16
2x4.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
SPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
P19
KITCHEN
p15
BED ROOM
20A SWITCHED SPUR UNIT ADJACENT TO A/C UNIT
DOUBLE POLE SWITCH @ 1250mm FROM FFL
DB.3B.GF.02\ Y5
DP1
?
p9
∅25mm PVC CONDUIT
P12
DB-3BR-2\ Y8
p20
4x2.5mm2+2x1.0mm2 CU/PVC WIRE IN
WALL MOUNTED JUNCTION BOX (FLEX OUTLET PLATE) ADJACENT TO
EQUIPMENT
JB
JB3
PHASE
GARBAGE
JB2
p6
2x2.5mm2+1x1.0mm2 CU/PVC WIRE IN
∅20mm PVC CONDUIT
CONTROL PANEL FOR EQUIPMENT (WEATHERPROOF TYPE)
P15
JB2
P21
DB-3BR3a\ B9
p19
B
1B
TOILET
P24
P6
P14
RDB
13A 3PIN SW TWIN SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @
1250mm FROM FFL
JB
DP3
JB
P23
DB-3BR3a\ R9
MASTER BED
DB-3BR3a\
R4
ROOM
DB-4BR2\ B6
TOILET
ROUND DRAW BOX
13A 3PIN SW SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @ 1250mm
FROM FFL
DB-4BR2\ Y8
DB-4BR2\ Y9
DB-4BR2\ R6 P8
DB-4BR2\ R5
DB-3BR-2\ R6
DINING
G.S CONDUIT SURFACE MOUNTED
13A 3PIN SW SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
FOR WATER HEATER
p17
P23
DP4
DB-4BR2\ R8
DB-4BR2\ B4
DB-3BR3\ B4
DB.3B.GF.03\ B6
JB1
PD.
DB-3BR3a\ R5
DB-3BR3a\ B3
p10
13A 3PIN SW TWIN SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
13A 3PIN SW TWIN SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
MAID'S TOILET
DB-3BR-2
DP1
JB
3A
P24
MAID'S ROOM
p4
P4
JB1
0
DB-3BR3a\ B5
CONDUIT EMBEDDED IN CEILING SLAB
13A 3PIN SW SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
P16
DB-3BR3a\ R3
DP3
1A
DESCRIPTION
P22
P21
DB-4BR2\ R7
BEDROOM 2
CL-1
TOILET
1A
2B
3B
CONDUIT EMBEDDED IN FLOOR/SCREED SLAB
DB-4BR2\ Y4
P13
P7
P6
?
P7
1
DB-4BR2\ Y3
CL-1
DB-4BR2\ Y4
4
P22
DB-3BR3a\ Y7
DB-3BR3a\ Y9
DB-4BR2\ R4
DB-4BR2\ B9
3A
DB-4BR2\ B4
DB-4BR2\ R8
1B
P1
?
CL-1
DB-4BR2\ R6
3B
P8
JB3
CL-1
2A
1A
13A 3PIN SW TWIN SOCKET @ 450mm FROM FFL
DP2
DB-4BR2\ Y10
PT4
p1
TOILET
JB
CL-2
13A 3PIN SW SOCKET @ 450mm FROM FFL
P11
DB-3BR3a\ R7
DP4
CONDENSING UNITS TO THE RISER
P9
DB-4BR2\ Y9
DB-4BR2\ Y8
3A
JB
PD
JB4
DB-3BR3a\ Y3
p11
2B
1A
1A
1A
DB-4BR2\ Y3
DB-4BR2\ Y7
DB-4BR2\ Y6
PT3
TOILET
DB-3BR3a\ B6
DB-4BR2\ Y6
DB-4BR2\ Y7 B10,Y10,Y11,RYB12 FOR
TOILET
C
JB
PD
JB
1B
P15
DP3
1B
B10,Y10,Y11,RYB12 FOR
CONDENSING UNITS TO THE RISER
DB-3BR3\ B6
DB-3BR3\ Y6
DB-3BR3\ R6
JB DB-3BR3a\ B8
p24
1B
3A
P9
FOR LEVEL-4
EU.3B.07
DB-3BR3a\ Y5
p23
1B
2B
3A
?
DB-4BR2\ B9
DB-4BR2\ R4
DB-3BR3\ B3
JB4
P13
P14
2A
DP2
P11
JB
JB3
p22
DB-4BR2\ Y10
1B
2A
NEUTRAL
P5
KITCHEN
p21
CL-3
1A
2A
1A
SYMBOLS
P1
DP4TOILET
KITCHEN
FOYER
JB2
2B
DB-3BR3\ B5
Y10,B10,R11,RYB12 FOR
CONDENSING UNITS TO THE RISER
P16
P19
1B
p13
DB-3BR3a\ B4
DB-4BR2\ R5
KITCHEN
3B
JB3
?
p5
CL-4
3A
C.P
P10
P8
DB-3BR3\ R5
DB-3BR3\ R10
MAID'S TOILET MAID'S ROOM
P12
DB-4BR2\ Y5
1B
JB2
P4
DB-3BR3\ R8
DB-3BR3a\ R10
DB-3BR3a\ R6
DB-3BR3a\ Y6
1A
P7
P4
DB-4BR2\ R7
CORRIDOR
P21
DB-4BR2\ B5
2B
TOILET
P9
PT5
D
1B
FOYER
CLOSET
p14
1B
BEDROOM 2
DP1
?
DB-4BR2\ B3
3A
PD TOILET
?
BEDROOM 3
1B
TOILET
E
3A
2A
LEGEND AND ABBREVIATIONS
DB-3BR3\ Y9
DB-3BR3\ R3
DP2
Y10,B10,R11,RYB12
FOR CONDENSING
UNITS TO THE RISER
P20
2A
P15
DP1
DB-3BR3\ R7
3B
2B
JB
DP3
JB
P24
CL-5
1B
2A
1A
DB-4BR2\ R9
JB1
P22
DB-3BR3\ Y7
P11
DINING
JB1
DB-3BR3\ Y5
DB-3BR3\ Y3
MAID'S
P17 ROOM
1B
JB
DB-3BR3\ B9
P1
MAID'S TOILET
1B
P1
FOR WATER HEATER
P18
2A
DB-3BR3\ R9
CORRIDOR
DB-3BR-2\
B5
DB-3BR-2\ Y4
5
DB-3BR-2\ R4
DB-3BR-2\ R6
MICROWAVE OVEN
3A
DB-3BR-2\ B7
CL-6
P23
DB-3BR3\ R4
P19
DIWANIYA
R9,R10,R11,RYB12 FOR
CONDENSING UNITS TO THE RISER
GAS IGNITER
P17
1B
2A
P24
MASTER BED
ROOM
P20
LIVING
P2
DB-3BR-2\ Y5
MAID'S ROOM
1B
MAID'S TOILET
3A
JB3
TOILET
F
P17
?
P25
P23KITCHEN
1B
2B
1B
DP4
DB-4BR2\ B6
DB-3BR-2
FOYER
P16
JB
CL-7
2A
1B
P21
BED ROOM
P3
P12
P10
P22
1B
1A
DB-3BR3\ Y4
TOILET
REFRIGERATOR
CL-1
JB2
DB-3BR-2\ R7
P18
DP3
1B
2B
3A
2B
LIVING ROOM
P14
TOILET
DP1
FOR WATER HEATER
DB-3BR-2\ B10
DB-3BR-2\ B3
1B
2A
JB1
DB-3BR-2\ Y8
DB-3BR-2\ Y10
P21
CL-8
2A
1A
3B
P5
DB-3BR-2\ R3
DP2
WASHING M/C/ DRYER
1B
LIVING ROOM
PD.
DB-3BR-2\ Y6
6
P4
FOR WATER HEATER
P8
1B
1A
MASTER
BEDROOM
P6
P13
DB-3BR-2\ Y3
BEDROOM 2
2A
1B
2A
2A
P28
P2
P19
G
1B
P16
P2
DB-3BR-2\ B4
P20
DIWANIYA/
BEDROOM 4
P18
DINING ROOM
2A
1B
3A
3B
DB-3BR-2\ Y9
P11
DB-3BR-2\ R8
DB-3BR-2\ Y7
2A
1A
7
CL-1
1A
P6
DP4
3A
P7
TOILET
DB-4BR2\ R3
3A
P5
MASTER P12
BEDROOM
P15
P10
3B
1A
BALCONY
DB-3BR3\
B7
DB-3BR-2\ B9
P25
BALCONY
DB-3BR-2\ R5
P9
TOILET
H
DB-4BR2\ B7
P3
?
2A
P14
CL-1
JB4
P27
P26
P3
2B
FOR WATER HEATER
P13
2
3B
1B
JB4
H.1
A
11
2A
I
8.4
2B
DB.3B.L2.01
(3BR-2 TYP)
8.3
‫تاريخ‬
5
: ‫التوقيع‬
4
: ‫اسم‬
3
‫تد قيـــق‬
2
: ‫التوقيع‬
1
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
TYPICAL FLOOR PLAN
POWER LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط القوى التفصيلي المتكرر‬
DRG.NO:
SD-BU-3B-EP-103-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
16
1B
2B
1B
3
2B
1B
CL-1
KEY PLAN
2A
1B
3B
1B
2B
CL-1
2A
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
2B
1B
3A
3A
1B
5
3B
CL-1
CL-1
2B
3A
0
2A
1B
FOR WATER HEATER(TYP.)
3A
CL-9
1B
2A
1A
3A
2A
1B
2A
1B
3A
2A
1B
2A
1B
4
JB4
1B
CL-1
3B
I
DB.3B.L7.02
(4BR-2 TYP)
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
DB.3B.L7.01
(3BR-2 TYP)
7
CL-1
2A
1B
1A
CL-8
2A
2B
3A
CL-7
1B
1A
1B
1A
2A
1B
FOR WATER HEATER
BALCONY
CONDUIT EMBEDDED IN FLOOR/SCREED SLAB
P23
DB.3B.GF.02\ B7
DP1
?
DB-3BR-2\ R7
DP3
JB3
DB-3BR-2\ B7
P25
P17
MAID'S ROOM
P24
FOR WATER HEATER
DB-4BR2\ Y5
KITCHEN
P722
p13
DB-3BR3a\ B4
p5
MSB.3B.L7.01
DB-3BR3a\ B5
PHASE
DB-4BR2\ B5
BEDROOM 3 DB-4BR2\ B3
COORDINATION CERTIFICATION
?
MAID'S ROOM P17
p22
JB
p23
PD.
DB-3BR3a\ R5
DB-3BR3a\ B3
p24
p11
TOILET
DB-3BR3a\ B6
DB.3B.GF.02\ Y7
DP4
JB3
TOILET
P721
MAID'S TOILET
D.1
p10
DP3
p6
25mm SLEEVES
DOWN TO
GROUND FLOOR
FOR CONDENCING UNITS
JB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
DATE
FAWAZ
OTIS
3BR2-01
3BR2-03
3BR2-02
3BR2-04
‫يعتمـــد‬
3B-07
3BR2-01
3BR2-02
3BR2-03
3BR2-04
3BR2-01
3BR2-02
3BR2-03
3BR2-04
P719
DB-3BR3a\ B9
3BR2-01
P716
p17
p16
NIRMEEN HAAL
AHEMD NAGEEB
SR. STURUCTURAL
PLAUMBING
ELEVATOR
3BR3-03
P725
UBC
SIGN
JB2
DINING
C
MASTER BED
DB-3BR3a\
R4
ROOM
NASHWA AL-SAYED
FIRE FIGHTING
1x900mm CABLE TRAY
(1000X300mm OPENING IN FLOOR SLAB
FROM LEVL-4 TO LEVEL-7)
ELEC.
DB-3BR3a\ R9
DB-3BR3a\ Y9
COMPANY
DB-3BR3a\ R3
JB
DB-3BR3a\ Y7
NAME
DP1
DP2
TOILET
P77
GARBAGE
DB.3B.GF.02\ R7
DB-3BR3a\ R7
JB4
TRADE
P20
p4
JB1
DB-3BR3a\ Y5
SLEEVES FOR CONDENCING UNITS
TEL. ROOM
DB-3BR3a\ Y3
FOYER
D
P78
P79
p1
JB DB-3BR3a\ B8
p21
NEUTRAL
SR. ARCHITECT
CORRIDOR
Y10,B10,R11,RYB12 FOR
CONDENSING UNITS TO THE RISER
KITCHEN
4x10.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
PHASE
: ‫اسم‬
MAID'S TOILET MAID'S ROOM
4x6.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
DISTRIBUTION BOARD
EARTH
P19
P18
P723
DB
NEUTRAL
JB2
P713
DB-3BR3a\ R10
DB-3BR3a\ R6
DB-3BR3a\ Y6
2x6.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
COOKER CONTROL UNIT @ 1600mm FROM FFL AND
COOKER CONNECTION UNIT @ 450mm FROM FFL
P12
?
50mm SLEEVES DOWN TO GROUND
FLOOR
P710
p14
4x4.0+1x2.5mm2 CU/PVC WIRES IN
∅25mm PVC CONDUIT
EARTH PIT
JB3
P15
DB-4BR2\ R5
P714
?
2x4.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
P16
TO RING EARTH
E.3A.05
P724
DIWANIYA
p9
p20
BED ROOM
DB-3BR3a\ Y4
3BR2-02
3BR2-03
3BR2-01
3BR2-04
3BR2-02
3BR2-03
p2
LIVING
3BR3-04
3BR2-01
p15
p19
3BR2-02
4BR2-03
3BR3-04
3BR3-01
3BR3-01
3BR3-02
4BR2-04
4BR2-02
4BR2-03
3BR2-04
3BR2-04
3BR3-01
BU-EP-103-‫ب‬
DB.3B.GF.02\ R8
p3
p18
p7
p8
BALCONY
DB-3BR3a\ B7
B
P14
P21
?
20A SWITCHED SPUR UNIT ADJACENT TO A/C UNIT
EARTH
TO ROOF
TO RING EARTH
E.3B.06
∅25mm PVC CONDUIT
TPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
JB
DP3
JB
DP2
DB-4BR2\ Y10
TO ROOF
ISOL FOR LIFT-1, 2 & 3
(AT HIGH LEVEL)
FROM MSB.3B.GF.02
E
TOILET
P11
CORRIDOR
4x2.5mm2+2x1.0mm2 CU/PVC WIRE IN
WALL MOUNTED JUNCTION BOX (FLEX OUTLET PLATE) ADJACENT TO
EQUIPMENT
SPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
DB-4BR2\ Y8
DB-4BR2\ Y9
DB-4BR2\ R6 P8
P13
DB-3BR-2\ B5
MICROWAVE OVEN
DB-4BR2\ R8
DB-4BR2\ B4
DB-4BR2\ Y7
DB-4BR2\ Y6
PD
CONTROL PANEL FOR EQUIPMENT (WEATHERPROOF TYPE)
JB
P22
P9
B10,Y10,Y11,RYB12 FOR
CONDENSING UNITS TO THE RISER
2x2.5mm2+1x1.0mm2 CU/PVC WIRE IN
∅20mm PVC CONDUIT
DOUBLE POLE SWITCH @ 1250mm FROM FFL
P1
R9,R10,R11,RYB12 FOR
CONDENSING UNITS TO THE RISER
GAS IGNITER
DB-4BR2\ Y3
DB-4BR2\ Y4
P1
DB-3BR-2\ R6
DB-3BR-2\ Y4
F
DB-3BR-2\ R4
DB-3BR-2\ Y5
P23KITCHEN
P16
MAID'S TOILET
P10
P22
REFRIGERATOR
JB
TOILET
JB2
ROUND DRAW BOX
RDB
13A 3PIN SW TWIN SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @
1250mm FROM FFL
C.P
: ‫اسم‬
JB
P18
13A 3PIN SW TWIN SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
13A 3PIN SW SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @ 1250mm
FROM FFL
?
DB-4BR2\ B9
DB-4BR2\ R4
G.S CONDUIT SURFACE MOUNTED
13A 3PIN SW SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
P7
DB-3BR-2
FOR WATER HEATER
DB-3BR-2\ B10
DB-3BR-2\ B3
13A 3PIN SW TWIN SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
BEDROOM 2
TOILET
P715
CONDUIT EMBEDDED IN CEILING SLAB
13A 3PIN SW SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
JB
DP1
DB-3BR-2\ Y8
DB-3BR-2\ Y10
13A 3PIN SW TWIN SOCKET @ 450mm FROM FFL
P24
P711
P4
DB-4BR2\ R7
FOYER
DESCRIPTION
‫تد قيـــق‬
P21
LEGEND AND ABBREVIATIONS
: ‫التوقيع‬
WASHING M/C/ DRYER
1A
DB-4BR2\ R9
TOILET
DB-3BR-2\ R3
DP2
1A
2B
3B
13A 3PIN SW SOCKET @ 450mm FROM FFL
PD.
DB-3BR-2\ Y6
CL-1
2A
1A
1A
1A
DP4
DB-4BR2\ B6
JB1
P8
CL-2
MASTER
BEDROOM
P5
DB-3BR-2\ Y3
BEDROOM 2
2B
1A
TOILET
DB-4BR2\ R3
P6
P19
G
1B
3A
SYMBOLS
DB-3BR-2\ B4
P20
1B
2B
3A
LIVING ROOM
JB1
FOR WATER HEATER
1B
2A
1A
JB
LIVING ROOM
DINING ROOM
CL-3
1A
2A
P28
P4
DB-3BR-2\ R8
DB-3BR-2\ Y7
CL-4
3A
: ‫اسم‬
P11
1A
2B
: ‫التوقيع‬
DP4
DB-3BR-2\ B9
P15
1B
P25
P2
DB-3BR-2\ Y9
3A
2A
3B
DIWANIYA/
BEDROOM 4
P2
P6
3B
2B
‫موافقة‬
P7
BALCONY
P10
P5
MASTER P12
BEDROOM
CL-5
1B
1A
1B
: ‫اسم‬
H
CL-6
2A
3B
DB-4BR2\ B7
DIWANIYA/
BEDROOM 3
DB-3BR-2\ R5
P9
TOILET
1B
2A
1A
: ‫التوقيع‬
P14
P3
2B
1B
3A
‫اعتماد‬
H.1
JB4
JB
P13
P27
P26
P3
JB
1A
‫تاريخ‬
2
: ‫التوقيع‬
1
3BR3-01
3BR3-02
3BR3-02
3BR3-03
3BR3-03
3BR3-02
3BR2-03
STATE OF KUWAIT
3BR3-04
3BR3-03
3BR3-04
3BR3-01
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
3BR3-02
P720
p12
: ‫رقم المخطط التعاقدي‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
3BR3-04
3BR3-03
A.1
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
A
DB.3B.L7.03
(3BR-3A TYP)
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
LEVEL 7 FLOOR PLAN
POWER LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط القوى التفصيلي للدور السابع‬
DRG.NO:
SD-BU-3B-EP-104-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
8.2
8.3
8.4
9
10
11
12
13
14
15
KEY PLAN
16
1B
8.1
3
8
CL-1
7
3B
2A
6
1B
5
2B
4
1B
3
1B
2
2B
1
1B
2B
CL-1
2A
1B
1B
1B
2A
1B
1B
2A
6
1
1B
3A
3A
1B
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
3B
2B
3A
0
2A
1B
3A
CL-9
1B
3A
2A
1B
3A
2A
1B
2A
1B
4
I
2A
1B
1B
CL-1
3B
2A
1A
2A
7
CL-1
1B
1A
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
PR2
H.1
H
FOR-CU-3BR2-01 (13Nos.)
FED FROM DB.3BR-2/R10 (TYP.)
3BR2-01
3BR3-01
3BR2-01
4BR2-04
4BR2-02
3BR3-01
3BR2-01
PR8
SPN-R-EF-3B-11
3BR2-03
4BR2-02
G
3BR2-02
CONDUIT EMBEDDED IN FLOOR/SCREED SLAB
13A 3PIN SW TWIN SOCKET @ 450mm FROM FFL
13A 3PIN SW TWIN SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
RDB
2x2.5mm2+1x1.0mm2 CU/PVC WIRE IN
13A 3PIN SW TWIN SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @
1250mm FROM FFL
C.P
∅20mm PVC CONDUIT
CONTROL PANEL FOR EQUIPMENT (WEATHERPROOF TYPE)
JB
4x2.5mm2+2x1.0mm2 CU/PVC WIRE IN
WALL MOUNTED JUNCTION BOX (FLEX OUTLET PLATE) ADJACENT TO
EQUIPMENT
∅25mm PVC CONDUIT
20A SWITCHED SPUR UNIT ADJACENT TO A/C UNIT
2x4.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
DOUBLE POLE SWITCH @ 1250mm FROM FFL
SPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
DB.3B.GF.03\ B8
4BR2-04
3BR2-04
4BR2-04
3BR2-04
4BR2-04
3BR2-04
4BR2-01
3BR2-02
ROUND DRAW BOX
13A 3PIN SW SOCKET-WATERTIGHT AT HIGH LEVEL - IP56 @ 1250mm
FROM FFL
4BR2-01
3BR2-03
3BR2-02
G.S CONDUIT SURFACE MOUNTED
13A 3PIN SW SOCKET-WATERTIGHT - IP56 @ 450mm FROM FFL
3BR2-03
3BR2-02
CONDUIT EMBEDDED IN CEILING SLAB
13A 3PIN SW TWIN SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
FOR CU-4BR2-04 (12Nos.)
FED FROM DB.4BR2/RYB12 (TYP.)
4BR2-02
3BR2-02
DESCRIPTION
13A 3PIN SW SOCKET @ 450mm FROM FFL
FOR-CU-4BR2-01 (12Nos.)
FED FROM DB.4BR-2/R10 (TYP.)
4BR2-02
3BR3-01
SYMBOLS
FOR-CU-4BR2-02 (12Nos.)
FED FROM DB.4BR-2/B10 (TYP.)
FOR-CU-4BR2-03 (12Nos.)
FED FROM DB.4BR-2/Y11 (TYP.)
3BR2-04
3BR2-03
3BR2-02
LEGEND AND ABBREVIATIONS
13A 3PIN SW SOCKET AT HIGH LEVEL @ 1250mm FROM FFL
3BR2-04
3BR2-03
1A
DN TO E.3B.05
4BR2-01
3BR2-03
4BR2-02
2B
3B
FOR-CU-3BR2-04 (13Nos.)
FED FROM DB.3BR-2/RYB12 (TYP.)
3BR2-03
3BR2-02
1A
1A
1A
4BR2-01
FOR-CU-3BR2-03 (13Nos.)
FED FROM DB.3BR-2/R11 (TYP.)
3BR2-04
1A
4BR2-01
4BR2-01
FOR-CU-3BR2-02 (13Nos.)
FED FROM DB.3BR-2/R9 (TYP.)
3BR2-01
4BR2-01
CL-1
2A
3A
FOR-CU-3BR3-04 (5Nos.)
FED FROM DB.3BR-3/RYB12 (TYP.)
FOR-CU-3BR3-01 (5Nos.)
FED FROM DB.3BR-3/Y10 (TYP.)
FOR-CU-3BR3-03 (5Nos.)
FED FROM DB.3BR-3/R11 (TYP.)
FOR-CU-3BR3-01 (7Nos.)
FED FROM DB.3BR-3A/Y10 (TYP.)
FOR-CU-3BR3-02 (5Nos.)
FED FROM DB.3BR-3/B10 (TYP.)
FOR-CU-3BR3-04 (7Nos.)
FED FROM DB.3BR-3A/RYB12 (TYP.)
4x4.0+1x2.5mm2 CU/PVC WIRES IN
∅25mm PVC CONDUIT
TPN ISOLATING SWITCH ADJACENT TO EQUIPMENT
EARTH PIT
4BR2-01
2x6.0+1x2.5mm2 CU/PVC WIRES IN
∅20mm PVC CONDUIT
COOKER CONTROL UNIT @ 1600mm FROM FFL AND
COOKER CONNECTION UNIT @ 450mm FROM FFL
FOR-CU-3BR3-02 (7Nos.)
FED FROM DB.3BR-3A/B10 (TYP.)
DB
4x6.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
DISTRIBUTION BOARD
FOR-CU-3BR3-03 (7Nos.)
FED FROM DB.3BR-3A/R11 (TYP.)
EARTH
4x10.0+1x2.5mm2 CU/PVC WIRES IN
∅38mm PVC CONDUIT
NEUTRAL
PHASE
EARTH
4BR2-04
NEUTRAL
SPN-R-EF-3B-10
PHASE
3BR2-04
F
4BR2-01
FOR CONDENCING UNITS
COORDINATION CERTIFICATION
DB.3B.GF.03\ Y8
C.P.
DB.3B.GF.02\ Y8
E
?
CONTROL PANEL FOR FIRE PUMP
FROM MSB.3B.GF.02
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
3BR3-04
DB.3B.GF.02\ Y9
3BR3-04
3BR3-04
D.1
C.P.
ELEVATOR
3BR3-02
3BR3-02
3BR3-02
3BR3-03
SPN-R-EF-3B-08
SPN-R-GREF-3B-01
SPN-R-CU-3B-07
SPN-R-EF-3B-07
C.P.
DB.3B.GF.03\ R8
3BR3-03
3BR3-03
3BR3-03
OTIS
DB.3B.GF.02\ RYB11
: ‫اسم‬
DB.3B.GF.03\ B7
DB.3B.GF.02\ B8
DATE
FAWAZ
FIRE FIGHTING
PUMP ROOM
SIGN
‫يعتمـــد‬
: ‫التوقيع‬
DB.3B.GF.03\ Y7
3BR3-03
PR3
: ‫اسم‬
4BR2-03
PR7
PR5
: ‫التوقيع‬
4BR2-03
DB.3B.GF.03\ Y6
3BR3-03
: ‫التوقيع‬
4BR2-03
3BR3-03
3BR3-04
SR. STURUCTURAL
PLAUMBING
: ‫اسم‬
4BR2-01
4BR2-03
CONTROL PANEL FOR JOCKEY PUMP
FROM MSB.3B.GF.02
: ‫التوقيع‬
4BR2-01
4BR2-03
?
CORRIDOR
3BR3-04
3BR3-04
4BR2-01
DB.3B.GF.02\ R9
PR4
SPN-R-EF-3B-06
D
TRADE
: ‫اسم‬
FOR CONDENCING UNITS
DB.3B.GF.03\ R7
SPN-R-EF-3B-09
3BR3-04
4BR2-03
4BR2-03
4BR2-03
4BR2-02
4BR2-02
4BR2-02
4BR2-02
4BR2-02
4BR2-04
4BR2-04
‫تد قيـــق‬
4BR2-03
‫موافقة‬
C
3BR3-02
‫اعتماد‬
3BR3-02
‫تاريخ‬
3BR3-02
3BR3-02
3BR3-01
3BR3-01
3BR3-01
3BR3-01
3BR3-01
3BR3-01
3BR3-01
4BR2-04
4BR2-04
4BR2-04
4BR2-04
: ‫رقم المخطط التعاقدي‬
BU-EP-104-‫ب‬
4BR2-03
‫دولة الكويت‬
STATE OF KUWAIT
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
4BR2-04
PUBLIC AUTHORITY FOR HOUSING WELFARE
B
A.1
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
A
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
ROOF PLAN
POWER LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط القوى التفصيلي السطح‬
DRG.NO:
SD-BU-3B-EP-105-A
DRAWN BY:
BM
CHKED.BY: YASSER
14
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
15
1168
2
SD-BU-3B-EP-107-A
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
225
5195
225
: ‫توقيــع‬
H
SUB CONTRCTOR
1000
4008
1200
1B
2B
1B
3
2B
1B
CL-1
KEY PLAN
2A
1B
3B
1B
2B
CL-1
2A
3B
1B
CL-1
3B
1B
5
2B
3A
0
2A
2200
3A
CL-9
1B
2A
1A
2A
1B
2A
3A
1B
CL-1
3B
RAMP
1B
3A
2A
1B
2A
1B
4
1800
1B
5302
1
1B
2B
3A
3B
1B
EPOXY FINISH
ON RCC SLAB
1B
3A
3A
CL-1
MLTB-3B
CL-1
1B
2A
1B
1B
2A
6
5100
1B
1B
1B
3A
2A
CL-1
2B
2A
2
CAPACITOR
BANK-3B
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
LT ROOM
LT ROOM
1B
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
1800x2750mm HIGH STEEL DOOR
FIXED TO CONCRETE WALL/COLUMN
F.F.L. +0.160
CHEQUER PLATE TRENCH COVERS
(REFER DETAILS)
CL-7
2A
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
H
G
G
175
1A
1A
1A
2B
3B
1A
6923
5302
175
6114
F.F.L. -0.060
3023
1st Floor
+4.500 m
1080
200
12Nos. 100mm DIA UPVC DUCTS FOR
LT CABLES TO MLTB-3B
LT ROOM
1000
CAPACITOR
BANK-3B
TRANSFORMER
ROOM
F.F.L. +0.160
1808
RAMP
3000x3000mm HIGH STEEL LOUVERED DOOR
FIXED TO CONCRETE WALL/COLUMN
3400
1100
3000x3000mm HIGH
STEEL LOUVRED DOOR
6114
1800
TRANSFORMER & RMU
ROOM
1800x2750mm HIGH
STEEL DOOR
4910
TRANS
BASE
1600
1600kVA
CHEQUER PLATE TRENCH COVERS
(REFER DETAILS)
1300X300mm OPENING IN
CHEQUER PLATE FOR LT CABLES
1A
E
5100
CL-1
2A
3A
TRANS BASE
(REFER DETAIL)
TRANSFORMER-3B
RMU
SUBSTATION LEVEL
+0.160 m
360
COORDINATION CERTIFICATION
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
744
ELECTRICAL
YASSER ABDULLAH
GGC
4x150mm + 4x100mm DIA UPVC DUCTS
IN TWO ROWS (950mm BELOW GROUND)
FOR HT CABLE INTAKE
FIRE FIGHTING
1450
1200
1200
NIRMEEN HAAL
AHEMD NAGEEB
HT SIDE TRENCH
1100
2420
1000
TRENCH COVER
(REFER DETAIL)
5195
1300x300mm OPENING IN
TRENCH COVER
SR. STURUCTURAL
PLAUMBING
ELEVATOR
1500x300mm OPENING IN
TRENCH COVER
2
Section 1
SD-BU-3B-EP-107-A
SCALE - 1 : 50
‫موافقة‬
‫اعتماد‬
SCALE - 1 : 50
‫يعتمـــد‬
‫تاريخ‬
SUBSTATION PLAN
DATE
OTIS
‫تد قيـــق‬
1
: ‫اسم‬
600x360mm OPENINGS IN SLAB
UNDER HT SWITCHGEAR
SIGN
FAWAZ
: ‫اسم‬
1080
1500
600x360mm OPENINGS IN SLAB
UNDER HT SWITCHGEAR
(REFER SECTION-1)
UBC
: ‫التوقيع‬
4x150mm + 4x100mm DIA UPVC DUCTS
IN TWO ROWS (950mm BELOW GROUND)
FOR HT CABLE INTAKE
225
E
NASHWA AL-SAYED
SR. ARCHITECT
: ‫اسم‬
600
COMPANY
: ‫التوقيع‬
600
510
HT SWITCH BASE
TRANS.
BASE
LTSIDE
TRENCH
NAME
300
360
CHEQUER PLATE TRENCH COVERS
(REFER DETAILS)
2014
TRADE
GROUND LEVEL
-0.060 m
: ‫التوقيع‬
EPOXY FINISH
ON RCC SLAB
: ‫اسم‬
F
: ‫التوقيع‬
1910
1500X300mm OPENING IN
CHEQUER PLATE FOR HT CABLE
BU-EP-401-‫ب‬
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
STATE OF KUWAIT
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
EPOXY FINISH ON RCC SLAB
5mm THICK M.S. CHEQUER PLATE
5mm THICK M.S. CHEQUER PLATE
50
50
1600
M.S. ANGLE IRON (50X50X5 mm) FRAME
ALL AROUND THE TRENCH
50.
.
300
CONCRETE WALL
3
TRENCH CORNER DETAIL
SCALE -NTS
STEEL ANGLE 50 X 50 X 5 mm.
ALL AROUND BASE TO BE FIXED
WITH STEEL LUGS.
1050
M.S. FLAT (25X3 mm) WELDED TO
ANGLE IRON AND GROUTED IN CONCRETE
1250
LIFTING HANDLE
FINISHED FL. LVL.
4
TRENCH COVER DETAIL
SCALE -NTS
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
5
SECTION THROUGH TRANSFORMER BASE
SCALE - 1 : 50
SUBSTATION -3B BUILDING PLAN ,
SECTIONS AND DETAILS
‫غرفة المحطات‬
DRG.NO:
: ‫عنــــوان المخـــطط‬
SD-BU-3B-EP-107-A
DRAWN BY:
BM
CHKED.BY: YASSER
CT
R Y B
V
VS
6A
6A
E.3B.04
BUS MOUNTED
CARTRIDGE FUSE
TVSS
CABLE BY MEW
TX.3B.GF.01
11/0.433kV, 50Hz
1600kVA, BY MEW
EARTH BAR
MLTB.3B.GF.01
TCL : 1315.413kW
MDL : 887.382kW
kWH
1
FORM.3b
63A
kWH
2
63A
BUS MOUNTED
CARTRIDGE FUSE
2500A, 3-POLE ACB
(WITHDRAWABLE TYPE)
kWH
kWH
kWH
3
4
5
63A
A
R Y B
A
A
V
VS
63A
400A TPN+E .Cu BUSBAR
320A
LOCATED AT ELEC ROOM GROUND FLOOR
BUILDING TYPE-3B
3 x 25mm Cu.TAPE
1*4C-150mm2 Cu/XLPE/SWA/PVC
IN UPVC DUCT
L = 50m
1*4C-95mm2 Cu/XLPE/SWA/PVC
IN UPVC DUCT
L = 80m
1*4C-300mm2 Cu/XLPE/SWA/PVC
IN UPVC DUCT
L = 75m
1*4C-300mm2 Cu/XLPE/SWA/PVC
IN UPVC DUCT
L = 70m
1*4C-300mm2 Cu/XLPE/SWA/PVC
IN UPVC DUCT
L = 65m
1*4C-300mm2 Cu/XLPE/SWA/PVC
IN UPVC DUCT
L = 60m
1*4C-300mm2 Cu/XLPE/SWA/PVC
IN UPVC DUCT
L = 55m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 30m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 30m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 45m
2*4C-120mm2 Cu/XLPE/SWA/PVC
IN TRENCH
L = 10m
E.3B.02
63A
TRADE
SR. ARCHITECT
SR. STURUCTURAL
PLAUMBING
SPARE
SPARE
7
8
63A
FORM.2b
CLUSTER :
63A
FAULT LEVEL 25 kA FOR 1 Sec.
EARTH BAR
MSB.3B.GF.01
TCL : 149.489kW
MDL : 103.165kW
PROTOYPE :
3 x 25mm Cu.TAPE
FROM MLTB.3B.GF.01
DRG.NO:
DRAWN BY:
BM
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 15m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 15m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*6mm2 Cu.PVC + 1*6mm2 Cu.PVC ON
25mm DIA UPVC CONDUIT
L = 80m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 80m
4*35mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 60m
4*16mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
38mm DIA UPVC CONDUIT
L = 60m
4*16mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
38mm DIA UPVC CONDUIT
L = 60m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 10m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 10m
4*16mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
38mm DIA UPVC CONDUIT
L = 10m
1B
1A
2A
2A
1B
2A
1A
2A
3A
1B
1A
CL-8
2B
1B
1A
2A
3A
1B
CL-7
1B
2B
1B
1A
2A
3B
1B
1A
2A
1B
1B
2B
2A
‫تاريخ‬
TCL : 114.276kW
MDL : 80.399kW
2A
: ‫التوقيع‬
MSB.3B.GF.02
2A
: ‫اسم‬
FORM.2b
‫تد قيـــق‬
FROM MLTB.3B.GF.01
10
3A
: ‫التوقيع‬
LOCATED AT ELEC ROOM GROUND FLOOR
BUILDING TYPE-3B
63A
: ‫اسم‬
250A
9
: ‫التوقيع‬
300A TPN+E .Cu BUSBAR
20A
: ‫اسم‬
FROM MLTB.3B.GF.01
8
: ‫التوقيع‬
: ‫اسم‬
VS
63A
‫موافقة‬
‫اعتماد‬
TCL : 22.385kW
MDL : 17.908kW
RETAIL
(3BR3-A-APARTMENT)
TCL : 31.088kW
MDL : 20.888kW
DB.3B.L1.04
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L1.03
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L1.02
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L1.01
CAPACITOR BANK ( 200 kVAR )
LOCATED AT LT ROOM
AUTOMATIC P.F CORRECTION
TCL : 114.276kW
MDL : 80.399kW
MSB.3B.GF.02
TCL : 95.598kW
MDL : 63.978kW
MSB.3B.L7.01
TCL : 191.210kW
MDL : 127.968kW
MSB.3B.L6.01
TCL : 191.210kW
MDL : 127.968kW
MSB.3B.L5.01
TCL : 191.210kW
MDL : 127.968kW
MSB.3B.L4.01
TCL : 191.210kW
MDL : 127.968kW
MSB.3B.L3.01
TCL : 191.210kW
MDL : 127.968kW
MSB.3B.L2.01
TCL : 149.489kW
MDL : 103.165kW
MSB.3B.GF.01
V
7
1A
CL-9
FAULT LEVEL 50 kA FOR 0.5 Sec.
R Y B
63A
1B
A
500A
A
6
2A
A
100A
400A
A
40A
1B
A
100A
1
0
A
5
3A
CT
9
40A
0
PF
VARIABLE TYPE
EARTH BAR
4
4
MD
CT
63A
3A
2500A TPN + E . Cu BUSBAR
250A
TCL : 191.210kW
MDL : 127.968kW
E.3B.02
3
1B
EF
200A
8
MSB.3B.L3.01
63A
CL-1
SC
400A
7
SPARE
FORM.2b
2
3B
OC
400A
6
FAULT LEVEL 25 kA FOR 1 Sec.
40A
3A
400A
5
LOCATED AT ELEC ROOM LEVEL-3
BUILDING TYPE-3B
1B
400A
4
R Y B
1
7
CL-1
CL-1
1B
kWH
SPARE
VS
63A
1
2A
3 x 25mm Cu.TAPE
V
8
CL-1
2B
FROM MLTB.3B.GF.01
A
63A
1B
3
500A TPN+E .Cu BUSBAR
7
3B
TCL : 191.210kW
MDL : 127.968kW
E.3B.02
A
63A
1B
MSB.3B.L2.01
6
63A
2B
400A
5
63A
1B
3A
A
4
1B
LOCATED AT ELEC ROOM LEVEL-2
BUILDING TYPE-3B
EARTH BAR
63A
2A
400A
FORM.2b
3
1B
R Y B
63A
1B
VS
2
63A
2A
FAULT LEVEL 25 kA FOR 1 Sec.
1
2
LOCATED IN LT ROOM
AT GROUND LEVEL
V
63A
3B
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
1B
320A
2
A
8
2B
1
A
63A
CL-1
A
7
1B
500A TPN+E .Cu BUSBAR
63A
3
6
63A
kWH
C.P.
C.P.
KEY PLAN
CL-1
5
5
63A
kWH
3A
4
63A
kWH
1B
3
63A
kWH
3A
CL-1
2
kWH
1B
2A
1
kWH
1B
kWH
SPARE
1B
6
kWH
SPARE
1B
kWH
SPARE
3A
kWH
SPARE
2A
SPARE
3 x 25mm Cu.TAPE
63A, TPN
2A
3B
CL-1
kWH
3 x 25mm Cu.TAPE
40A, TPN
2B
1*4C-240mm2 Cu/XLPE/SWA/PVC
IN UPVC DUCT
L = 45m
40A, TPN
2B
1B
1B
kWH
63A
(ROOF)
TCL : 2.200kW
MDL : 0kW
JOCKY PUMP
(ROOF)
TCL : 15.000kW
MDL : 0kW
FIRE PUMP
TCL : 18.000kW
MDL : 14.400kW
LIFT-PE-03
TCL : 12.000kW
MDL : 9.600kW
LIFT-PE-02
TCL : 12.000kW
MDL : 9.600kW
LIFT-PE-01
(HVAC)
TCL : 24.260kW
MDL : 21.652kW
DB.3B.GF.03
(POWER)
TCL : 17.687kW
MDL : 16.420kW
DB.3B.GF.02
(LIGHT)
TCL : 11.389kW
MDL : 8.727kW
DB.3B.GF.01
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L3.06
(3BR3-A-APARTMENT)
TCL : 31.088kW
MDL : 20.888kW
DB.3B.L3.05
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L3.04
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L3.03
(3BR3-APARTMENT)
TCL : 31.102kW
MDL : 20.900kW
DB.3B.L3.02
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L3.01
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L2.06
(3BR3-A-APARTMENT)
TCL : 31.088kW
MDL : 20.888kW
DB.3B.L2.05
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L2.04
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L2.03
(3BR3-APARTMENT)
TCL : 31.102kW
MDL : 20.900kW
DB.3B.L2.02
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L2.01
E.3B.05
1B
2B
2A
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
3x25mm C.TAPE
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
E.3B.06
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
3B
CL-6
3B
CL-5
1B
3A
3B
2B
1A
2A
CL-4
3A
1A
1A
2A
FIRE FIGHTING
1B
3A
ELEVATOR
CL-3
1B
2B
1B
1A
2B
3A
CL-2
1A
2A
1A
1A
3B
CL-1
1A
2B
1A
3 x 25mm Cu.TAPE
SPARE
63A
FAULT LEVEL 25 kA FOR 1 Sec.
EARTH BAR
E.3B.02
(LANDLORD)
COORDINATION CERTIFICATION
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
BU-EP-601-‫ب‬
STATE OF KUWAIT
E.3B.02
‫المخططات الھيكلية‬
SIGN
E.3B.02
SD-BU-3B-EP-108-A
E.3B.03
CHKED.BY: YASSER
DATE
FAWAZ
OTIS
‫يعتمـــد‬
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
ELECTRICAL SINGLE LINE DIAGRAM BUILDING TYPE-3B SHEET 1 OF 2
: ‫عنــــوان المخـــطط‬
SPARE
SPARE
kWH
kWH
63A
4
A
400A
A
A
V
VS
kWH
63A
5
500A TPN+E .Cu BUSBAR
R Y B
LOCATED AT ELEC ROOM LEVEL-5
BUILDING TYPE-3B
63A
6
63A
7
63A
FORM.2b
8
63A
EARTH BAR
MSB.3B.L5.01
TCL : 191.210kW
MDL : 127.968kW
CLUSTER :
FAULT LEVEL 25 kA FOR 1 Sec.
PROTOYPE :
400A
3 x 25mm Cu.TAPE
FROM MLTB.3B.GF.01
DRG.NO:
DRAWN BY:
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 15m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 15m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
BM
2A
1B
1A
2A
2A
1B
2A
1A
2A
3A
1B
1A
CL-8
2B
1B
1A
2A
3A
1B
CL-7
1B
2B
1B
1A
2A
3B
1B
STATE OF KUWAIT
1A
2A
1B
1B
2B
FIRE FIGHTING
2A
: ‫التوقيع‬
2A
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 15m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 20m
3A
‫تاريخ‬
‫تد قيـــق‬
‫موافقة‬
‫اعتماد‬
: ‫اسم‬
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L5.06
(3BR3-A-APARTMENT)
TCL : 31.088kW
MDL : 20.888kW
DB.3B.L5.05
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L5.04
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L5.03
(3BR3-APARTMENT)
TCL : 31.102kW
MDL : 20.900kW
DB.3B.L5.02
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L5.01
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L4.06
(3BR3-A-APARTMENT)
TCL : 31.088kW
MDL : 20.888kW
DB.3B.L4.05
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L4.04
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L4.03
(3BR3-APARTMENT)
TCL : 31.102kW
MDL : 20.900kW
DB.3B.L4.02
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
1A
CL-9
3 x 25mm Cu.TAPE
3
1B
SR. STURUCTURAL
PLAUMBING
2A
SR. ARCHITECT
1B
TRADE
3A
63A
TCL : 95.598kW
MDL : 63.978kW
0
E.3B.02
2
4
TCL : 191.210kW
MDL : 127.968kW
E.3B.02
3A
FAULT LEVEL 25 kA FOR 1 Sec.
63A
MSB.3B.L7.01
1B
EARTH BAR
1
CL-1
MSB.3B.L4.01
LOCATED AT ELEC ROOM LEVEL-7
BUILDING TYPE-3B
EARTH BAR
3B
FROM MLTB.3B.GF.01
63A
3A
LOCATED AT ELEC ROOM LEVEL-4
BUILDING TYPE-3B
FORM.2b
8
1B
R Y B
63A
7
CL-1
CL-1
1B
FROM MLTB.3B.GF.01
FORM.2b
1
2A
VS
7
R Y B
CL-1
2B
V
63A
VS
1B
A
6
kWH
V
3B
500A TPN+E .Cu BUSBAR
63A
kWH
A
1B
A
5
kWH
A
2B
63A
250A TPN+E .Cu BUSBAR
5
63A
1B
3A
4
kWH
3 x 25mm Cu.TAPE
kWH
4
1B
kWH
A
63A
2A
63A
400A
3
1B
TCL : 191.210kW
MDL : 127.968kW
63A
1B
MSB.3B.L6.01
2
2A
FAULT LEVEL 25 kA FOR 1 Sec.
63A
2
SPARE
EARTH BAR
1
3B
DB.3B.L4.01
1B
kWH
FORM.2b
63A
2B
LOCATED AT ELEC ROOM LEVEL-6
BUILDING TYPE-3B
8
CL-1
R Y B
63A
1B
500A TPN+E .Cu BUSBAR
7
3
4*25mm2 Cu.PVC + 1*16mm2 Cu.PVC ON
50mm DIA UPVC CONDUIT
L = 35m
KEY PLAN
CL-1
5
VS
63A
3A
V
6
1B
A
A
63A
3A
CL-1
3
A
5
1B
2A
A
63A
1B
63A
4
kWH
1B
6
2
63A
kWH
1B
kWH
3
kWH
3A
63A
63A
kWH
2A
kWH
2
kWH
2A
3B
CL-1
1
63A
kWH
SPARE
2B
1
kWH
SPARE
2B
1B
1B
kWH
SPARE
1B
2B
2A
SPARE
(3BR3-A-APARTMENT)
TCL : 31.088kW
MDL : 20.888kW
DB.3B.L7.03
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L7.02
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L7.01
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L6.06
(3BR3-A-APARTMENT)
TCL : 31.088kW
MDL : 20.888kW
DB.3B.L6.05
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L6.04
(4BR2-APARTMENT)
TCL : 33.004kW
MDL : 21.811kW
DB.3B.L6.03
(3BR3-APARTMENT)
TCL : 31.102kW
MDL : 20.900kW
DB.3B.L6.02
(3BR2-APARTMENT)
TCL : 31.506kW
MDL : 21.279kW
DB.3B.L6.01
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
3B
CL-6
3B
CL-5
1B
3A
3B
2B
1A
2A
CL-4
3A
1A
1A
2A
1B
3A
ELEVATOR
CL-3
1B
2B
1B
1A
2B
3A
CL-2
1A
2A
1A
1A
3B
CL-1
1A
2B
1A
63A
FAULT LEVEL 25 kA FOR 1 Sec.
200A
3 x 25mm Cu.TAPE
E.3B.02
FROM MLTB.3B.GF.01
COORDINATION CERTIFICATION
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SIGN
BU-EP-602-‫ب‬
‫المخططات الھيكلية‬
SD-BU-3B-EP-109-A
CHKED.BY: YASSER
DATE
FAWAZ
OTIS
‫يعتمـــد‬
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
SPARE
kWH
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
ELECTRICAL SINGLE LINE DIAGRAM BUILDING TYPE-3B SHEET 2 OF 2
E.3B.02
: ‫عنــــوان المخـــطط‬
ProjectJ Building Name
SABAH AL AHMAD CITY SIX RESIDENTIAL PROTOTYPE TOWER
Address/ Location
Distribution Board No./Ref
Fed From
KUWAIT
DB.3B.GF.01
MSB.3B.GF.02
Revision
Date
INCOMER
A
OCTOBER-19
100A TPN ON LOAD ISOLATOR
Busbar Section/ RCCB
40A 4POLE 300mA RCCB
ELECTRICAL ROOM 3B-GF-08
Circuit
Number
Rating
Wire Size
Room Name & Number
Circuit Description
Watts Per Points
CONTROLED
A
R1
10 A
2.5
TOILET (3B-GF-10),WATER TANK ROOM-1 (3B-GF-11-1),GARBAGE CHUTE-1 (3B-GF-06-1),ELECTRICAL
ROOM (3B-GF-08),TELECOM (3B-GF-05),STORAGE-1 (3B-GF-09-1)
LG1-LG24
(7x20 ) + (1x21) + (1x25) + (4x26) +
(3x35 ) + (2x42) + (6x70)
SW
867 W
Y1
10 A
2.5
ELEVATOR
ELV/1-ELV5
(5x17)
SW
B1
10 A
2.5
ELEVATOR
ELV/6-ELV10
(5x17)
SW
R2
10 A
2.5
G.F EXTERNAL LIGHT
LG25-LG49
(2x17) + (23x25)
SW
Y2
10 A
2.5
G.F EXTERNAL LIGHT
LG96-LG124
(6x18) + (17x25) + (6x28)
SW
B2
10 A
2.5
G.F EXTERNAL LIGHT
LG53-LG82
(6x18) + (24x25)
SW
R3
10 A
2.5
STAIR -01
LS/1-LS/17
(17x30)
SW
Y3
10 A
2.5
STAIR -02
LS/18-LS/36
(19x30)
SW
B3
10 A
2.5
G.F OFFICE ,TOILET
LG125-LG136
(9x14) + (1x21) + (1x25) + (1x35)
SW
R4
10 A
2.5
ELEVATOR LOBBY
LG83-LG95
(13x14)
SW
Y4
10 A
2.5
ELEC. (3B-102),GARBAGE (3B-101),TEL. ROOM (3B-103)
L1/1-L1/22
(19x14) + (1x20) + (2x70)
SW
B4
10 A
--
Spare
--
--
R5
10 A
2.5
STAIR -01
EMS1-EMS17
(17x20)
MCB
Y5
10 A
2.5
STAIR -02,PUMP ROOM (3B-R01),CORRIDOR (3B-R02)
ER1,ER2,EXR1,EXR2,EMS18-E
MS37
(20x20) + (2x3)
MCB
B5
10 A
2.5
ELECTRICAL ROOM (3B-GF-08),LOBBY-1 (3B-GF-01-1),OFFICE-1 (3B-GF-02-1)
EG1-EG4
(4x20)
MCB
R6
10 A
2.5
L07 SERVICES
L7/39-L7/45
(7x40)
SW
Y6
10 A
2.5
L07 SERVICES
L7/30-L7/38
(9x40)
SW
B6
10 A
2.5
L07 SERVICES
L7/1-L7/9
(9x40)
SW
R7
10 A
2.5
PUMP ROOM (3B-R01)
LR25-LR29
(3x20 ) + (2x30)
SW
Y7
10 A
2.5
TRANSFORMER ROOM (3B-GF-12)
LG145,LG146
(2x120)
SW
B7
10 A
2.5
TRANSFORMER ROOM (3B-GF-12),LT ROOM (3B-GF-13)
LG137-LG144
(4x42) + (4x70)
SW
R8
10 A
2.5
G.F EXTERNAL LIGHT
LG50-LG52
(2x16) + (1x20)
SW
Y8
10 A
2.5
TRANSFORMER ROOM (3B-GF-12),LT ROOM (3B-GF-13)
EG5-EG7
(3x20)
MCB
B8
10 A
2.5
ELEC. (3B-441),GARBAGE (3B-442),Space (425)
LT/1-LT/22
(19x14) + (1x20) + (2x70)
SW
R9
10 A
2.5
ELEC. (3B-541),GARBAGE (3B-542),Space (547)
LT/1-LT/22
(19x14) + (1x20) + (2x70)
SW
Y9
10 A
2.5
ELEC. (3B-641),GARBAGE (3B-642),Space (667)
LT/1-LT/22
(19x14) + (1x20) + (2x70)
SW
B9
10 A
2.5
CORRIDOR (3B-701),ELEC. (3B-703),GARBAGE (3B-702),TEL. ROOM (3B-704),Space (753)
L7/10-L7/29
(17x14) + (1x20) + (2x70 )
SW
R10
10 A
--
Spare
--
--
Y10
10 A
2.5
ELEC. (3B-202),GARBAGE (3B-201),TEL. ROOM (3B-203)
LT/1-LT/24
(21x14) + (1x20) + (2x70)
SW
B10
10 A
2.5
ROOF
LR1-LR12
(12x17)
SW
R11
10 A
2.5
EXTERNAL LIGHT BACK SIDE
LG53-LG57
(5x104)
SW
Y11
10 A
2.5
ELEC. (3B-341),GARBAGE (3B-342),Space (308)
LT/1-LT/22
(19x14) + (1x20) + (2x70)
SW
B11
10 A
2.5
ROOF
LR13-LR24
(12x17)
SW
R12
10 A
--
Spare
--
--
Y12
10 A
--
Spare
--
--
B12
10 A
CORRIDOR-1 (3B-100-1),CORRIDOR (3B-200),CORRIDOR (3B-701),ELEC. (3B-102),ELEC.
(3B-202),CORRIDOR (3B-301),ELEC. (3B-341),CORRIDOR (3B-401),ELEC. (3B-441),CORRIDOR
(3B-501),CORRIDOR (3B-601),ELEC. (3B-541),ELEC. (3B-641),ELEC. (3B-703)
E1/1-E1/5,EX1/1,EX1/2,ET/2,ET/
5,E7/1-E7/4,EX7/1,EX7/2
(34x20) + (12x3)
MCB
2.5
B
C
REMARKS
175 W
175 W
645 W
587 W
600 W
595 W
665 W
207 W
182 W
421 W
0W
--
340 W
406 W
80 W
0W
0W
0W
128 W
240 W
400 W
52 W
60 W
421 W
421 W
421 W
393 W
0W
--
449 W
420 W
520 W
421 W
420 W
0W
--
0W
--
717 W
TOTAL CONNECTED LOAD- SUMMER
11.389 kW
3736 W
3833 W
3822 W
TOTAL CONNECTED LOAD- WINTER
11.389 kW
3736 VA
3833 VA
3822 VA
ProjectJ Building Name
SABAH AL AHMAD CITY SIX RESIDENTIAL PROTOTYPE TOWER
Address/ Location
Distribution Board No./Ref
Fed From
KUWAIT
DB.3B.GF.02
MSB.3B.GF.02
Revision
Date
INCOMER
A
OCTOBER-19
100A TPN ON LOAD ISOLATOR
Busbar Section/ RCCB
40 A 4POLE 30mA ,RCCB
ELECTRICAL ROOM 3B-GF-08
Circuit
Number
Rating
Wire Size
Room Name & Number
Circuit Description
Watts Per Points
CONTROLED
A
R1
16 A
2.5
13ASW.SOCKET AT TELECOM (3B-GF-05),ELECTRICAL ROOM (3B-GF-08)
P1-P2
(2x100)
SW.COMB.
200 W
Y1
16 A
2.5
13ASW.SOCKET ATGUARDS QUARTER (3B-GF-07),GARBAGE CHUTE-1 (3B-GF-06-1),STORAGE-1
(3B-GF-09-1)
P3-P7
(4x100) + (1x200)
SW.COMB.
B1
16 A
--
Spare
--
--
R2
16 A
13ASW.SOCKET AT WATER TANK ROOM-1 (3B-GF-11-1)
P8-P11
(3x100) + (1x200)
SW.COMB.
Y2
16 A
--
Spare
--
--
B2
20 A
4
20A SW & DP SWTCH FOR WATER HEATER AT TOILET (3B-GF-10)
JB1
(1x1500)
DPSW
R3
16 A
2.5
13ASW.SOCKET AT LOBBY-1 (3B-GF-01-1)
P12-P14
(3x100)
SW.COMB.
Y3
16 A
2.5
13ASW.SOCKET AT ELEVATOR PIT (PT-01)
P15-P16
(2x100)
SW.COMB.
B3
16 A
2.5
13ASW.SOCKET AT OFFICE-1 (3B-GF-02-1)
P17-P19
(3x100)
SW.COMB.
R4
16 A
2.5
13ASW.SOCKET AT G.F EXTERNAL
P20-P21
(2x100)
SW.COMB.
Y4
20 A
4
20A SW & DP SWTCH FOR WATER HEATER AT TOILET-1 (3B-GF-03-1)
JB2
(1x1500)
DPSW
B4
16 A
2.5
13ASW.SOCKET AT OFFICE-1 (3B-GF-02-1)
P22-P23
(2x100)
SW.COMB.
R5
16 A
2.5
13ASW.SOCKET AT ELECTRICAL ROOM (3B-GF-08),TEL. ROOM (3B-103),GARBAGE (3B-101),CORRIDOR-1
(3B-100-1),ELEC. (3B-102)
P11-P15
(4x100) + (1x200)
SW.COMB.
Y5
16 A
2.5
13ASW.SOCKET AT TEL. ROOM (3B-203),GARBAGE (3B-201),CORRIDOR (3B-200),ELEC. (3B-202)
PT1-PT5
(4x100) + (1x200)
SW.COMB.
B5
16 A
2.5
13ASW.SOCKETS AT ELE GAR/CORR. RING - 6th FLOOR
PT1-PT5
(5x100)
SW.COMB.
2.5
R6
Y6
B
0W
--
500 W
0W
--
1500 W
300 W
200 W
300 W
200 W
1500 W
200 W
600 W
600 W
500 W
200 W
20 A
5x4
20A TPN FOR GARBAGE
20A TPN FOR GARBAGE
(1x600)
ISOLATOR
200 W
200 W
R7
16 A
2.5
13ASW.SOCKETS AT ELE GAR/CORR. RING - 7th FLOOR
P76-P79,P710
(6x100)
SW.COMB.
Y7
16 A
2.5
13ASW.SOCKETS -EXTERNAL SERVICES 7th FLOOR
P721-P725
(5x100)
SW.COMB.
B7
16 A
2.5
13ASW.SOCKETS -EXTERNAL SERVICES 7th FLOOR
P711-P715
(5x100)
SW.COMB.
R8
16 A
2.5
13ASW.SOCKETS -EXTERNAL SERVICES 7th FLOOR
P716-P720
(5x100)
SW.COMB.
Y8
16 A
2.5
13ASW.SOCKETS AT CORRIDOR (3B-R02),PUMP ROOM (3B-R01)
PR4,PR5
(2x100)
SW.COMB.
B8
20 A
4
20ASPN ISO FOR EF ROOF
SPN-R-GREF-3B-1
(1x187)
ISOLATOR
R9
16 A
2.5
13ASW.SOCKETS AT ROOF
PR1-PR3
(3x100)
SW.COMB.
Y9
16 A
2.5
13ASW.SOCKETS AT ROOF
PR6-PR8
(3x100)
SW.COMB.
B9
16 A
--
Spare
--
--
R10
600 W
500 W
500 W
500 W
200 W
187 W
300 W
300 W
0W
1000 W
20 A
5x4
WATER TANK ROOM-1 (3B-GF-11-1)
C.P FOR WATER TANK ROOM
1000 W
B10
1000 W
R11
Y11
REMARKS
600 W
B6
Y10
C
667 W
20 A
5x4
PUMP ROOM (3B-R01)
C.P FOR PUMP ROOM
667 W
B11
667 W
R12
16 A
2.5
13ASW.SOCKETS AT ELE GAR/CORR. RING - 3RD FLOOR
PT1-PT5
(4x100) + (1x200)
SW.COMB.
Y12
16 A
2.5
13ASW.SOCKETS AT ELE GAR/CORR. RING - 4th FLOOR
PT1-PT5
(4x100) + (1x200)
SW.COMB.
B12
16 A
2.5
13ASW.SOCKETS AT ELE GAR/CORR. RING - 5th FLOOR
PT1-PT5
(4x100) + (1x200)
SW.COMB.
600 W
600 W
600 W
TOTAL CONNECTED LOAD- SUMMER
17.687 kW
5667 W
6367 W
5654 W
TOTAL CONNECTED LOAD- WINTER
17.687 kW
5667 VA
6367 VA
5654 VA
--
ProjectJ Building Name
SABAH AL AHMAD CITY SIX RESIDENTIAL PROTOTYPE TOWER
Address/ Location
Distribution Board No./Ref
Fed From
KUWAIT
DB.3B.GF.03
MSB.3B.GF.02
Revision
Date
INCOMER
A
OCTOBER-19
100A TPN ON LOAD ISOLATOR
Busbar Section/ RCCB
50 A 4POLE 300mA ,RCCB
ELECTRICAL ROOM 3B-GF-08
Circuit
Number
Rating
Wire Size
Room Name & Number
Circuit Description
Watts Per Points
CONTROLED
A
R1
20 A
4
20ASPUR OUTLET FOR EU 3B-O1-LOBBY-1 (3B-GF-01-1)
20A SWITCHED-SPUR UNIT-1
(1x430)
SW
430 W
Y1
20 A
4
20ASPUR OUTLET FOR EU 3B-O2-GUARDS QUARTER (3B-GF-07)
20A SWITCHED-SPUR UNIT-2
(1x125)
SW
B1
20 A
4
20ASPUR OUTLET FOR EU 3B-O3-ELECTRICAL ROOM (3B-GF-08)
20A SWITCHED-SPUR UNIT-3
(1x250)
SW
R2
20 A
4
20ASPUR OUTLET FOR EU 3B-O4-OFFICE-1 (3B-GF-02-1)
20A SWITCHED-SPUR UNIT-4
(1x125)
SW
Y2
20 A
4
20ASPUR OUTLET FOR EU 3B-O5-TELECOM (3B-GF-05)
20A SWITCHED-SPUR UNIT-5
(1x250)
SW
B2
20 A
4
20ASPUR OUTLET FOR EU 3B-O6-LT ROOM (3B-GF-13)
20A SWITCHED-SPUR UNIT-6
(1x250)
SW
R3
32 A
6
32A SPN FOR CU-3B-2 G.F EXTERNAL
32A SPN-CU-3B-2
(1x2940)
ISOLATOR
Y3
20 A
4
20A SPN FOR CU-3B-3 G.F EXTERNAL
20A SPN-CU-3B-3
(1x1470)
ISOLATOR
B3
20 A
--
Spare
--
--
R4
20 A
4
20A SPN FOR CU-3B-5 G.F EXTERNAL
20A SPN-CU-3B-5
(1x1600)
ISOLATOR
Y4
32 A
6
32A SPN FOR CU-3B-4 G.F EXTERNAL
32A SPN-CU-3B-4
(1x2940)
ISOLATOR
B4
32 A
6
40A SPN FOR CU-3B-6 G.F EXTERNAL
40A SPN-CU-3B-6
(1x3330)
ISOLATOR
R5
Y5
B
C
REMARKS
125 W
250 W
125 W
250 W
250 W
2940 W
1470 W
0W
--
1600 W
2940 W
3330 W
1603 W
20 A
5x4
32A SPN FOR CU-3B-1 G.F EXTERNAL
32A TPN-CU-3B-1
(1x4810)
ISOLATOR
1603 W
B5
1603 W
R6
20 A
Y6
20 A
B6
--
Spare
--
--
4
32 A SPN FOR CU-3B-7 ROOF
32A SPN-R-CU-3B-7
(1x1600)
ISOLATOR
20 A
4
20ASPUR OUTLET FOR EU 3B-O7-TEL. ROOM 4TH FLOOR
20A SWITCHED-SPUR UNIT-7
(1x250)
SW
R7
20 A
4
20A SPN FOR EF-3B-6 ROOF
20A SPN-R-EF-3B-6
(1x560)
ISOLATOR
Y7
20 A
4
20A SPN FOR EF-3B-8 ROOF
20A SPN-R-EF-3B-8
(1x120)
ISOLATOR
B7
20 A
4
20A SPN FOR EF-3B-7 ROOF
20A SPN-R-EF-3B-7
(1x560)
ISOLATOR
R8
20 A
4
20A SPN FOR EF-3B-9 ROOF
20A SPN-R-EF-3B-9
(1x560)
ISOLATOR
Y8
20 A
4
20A SPN FOR EF-3B-10 ROOF
20A SPN-R-EF-3B-10
(1x120)
ISOLATOR
B8
20 A
4
20A SPN FOR EF-3B-11 ROOF
20A SPN-R-EF-3B-11
(1x120)
ISOLATOR
R9
20 A
--
Spare
--
--
Y9
20 A
4
LT ROOM
20A SWITCHED-SPUR UNIT
(1x250)
SW
B9
20 A
4
LT ROOM
20A SPN
(1x1600)
ISOLATOR
R10
20 A
--
Spare
--
--
Y10
--
--
--
Space
--
--
B10
--
--
--
Space
--
--
0W
--
1600 W
250 W
560 W
120 W
560 W
560 W
120 W
120 W
0W
--
250 W
1600 W
0W
--
0W
--
0W
TOTAL CONNECTED LOAD- SUMMER
24.260 kW
7818 W
8478 W
7963 W
TOTAL CONNECTED LOAD- WINTER
24.260 kW
7818 W
8478 W
7963 W
--
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
1
2
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
16
250
2108
1987
1955
4969
1168
4962
1B
5003
2B
3799
CL-1
3143
1B
3800
3
4978
2A
250
1B
2132
2B
2014
1B
1930
3B
4994
1B
1143
2B
4962
CL-1
KEY PLAN
2A
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
2B
3A
2A
0
I
1B
3A
CL-9
1B
3A
2A
1B
3A
2A
1B
2A
1B
4
2612
2A
1B
1B
CL-1
3B
2A
1A
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
H.1
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
H
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1A
LEGEND AND ABBREVIATIONS
5100
SYMBOLS
DESCRIPTION
UPVC PIPES
DOOR ENTRANCE UNIT AUDIO STATION WITH TRADITIONAL PANEL
@ 1250mm FROM FFL
IDS
LT ROOM
RET
REQUEST TO EXIT SWITCH
G
DISTRIBUTION POINT BOX (DP) 400 PAIR CAT6 TERMINALS
(SIZE-800X1000X150mm)
ONT
ONT
IC
INTERCOM STATION @ 1250mm FROM FFL
4910
MARKER PLATE ON BOUNDARY WALL10cmX10cm (V2A STEEL)
TERMINAL BOX (TB) (TB.1B.GF.01) (SIZE-300mmX400mmX150mm)
STORAGE
TELECOM OUTLET @ 450mm FROM FFL
TRANSFORMER
ROOM
WATER TANK
ROOM
DOOR BELL
240V,50HZ,1PHASE AC SUPPLY FOR ONT
F
2014
BELL PUSH
TOILET
E
COORDINATION CERTIFICATION
TRADE
GUARDS
QUARTER
D.1
TOILET
RETAIL
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
DISTANCE
50cm
ONT
2 Nos. 50mmDIA UPVC PIPES
FOR MOC INTAKE
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫اسم‬
‫يعتمـــد‬
BU-TT-100-‫ب‬
END TO BE SEALED WITH
PLASTIC PLUGS
NOTE:
MOC INTAKE POINT TO THE BUILDING FROM THE NEAEST
HANDHOLE SHALL BE COORDINATED AS PER INFRA DESIGN.
STATE OF KUWAIT
TERMINAL BOX (TB)
TB.3B.GF.01
(SIZE300mmX400mmX150mm)
2502
‫تد قيـــق‬
1No. 50mm UPVC PIPE TO
NEAREST MOC HANDHOLE
‫موافقة‬
MARKER PLATE ON BOUNDARY WALL
10cmX10cm (V2A STEEL)
240V, 50HZ,
1 PHASE AC SUPPLY FOR ONT
B
: ‫التوقيع‬
OTIS
DISTRIBUTION POINT BOX (DP)
500 PAIR CAT6 TERMINALS
(SIZE-1000X1000X150mm)
TELECOM
INTERCOM POWER SUPPLY UNIT
(240V,50HZ,1PHASE AC SUPPLY)
LOCATED AT ABOVE FALSE CEILING
DATE
FAWAZ
‫اعتماد‬
ELECTRICAL
ROOM
: ‫التوقيع‬
: ‫اسم‬
CAT 6 CABLE IN 25mm∅
UPVC CONDUIT (TYP.)
RTE
4000
OFFICE
IDS
6118
UBC
GGC
300mm CABLE TRAY RISE UP TO LEVEL-7
THROUGH 450mmX200mm OPENING IN CEILING SLAB
LOBBY
A
NIRMEEN HAAL
AHEMD NAGEEB
SR. STURUCTURAL
PLAUMBING
ELEVATOR
IC
DOOR ENTRANCE UNIT
AUDIO STATION WITH TRADITIONAL PANEL @ 1250mm
FROM FFL
UBC
FIRE FIGHTING
D
C
NASHWA AL-SAYED
SR. ARCHITECT
STAIR
SIGN
‫تاريخ‬
GARBAGE
CHUTE
COMPANY
: ‫التوقيع‬
LOBBY
5043
STAIR
NAME
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
A.1
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
GROUND FLOOR PLAN
TELEPHONE & INTERCOM LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط االتصاالت التفصيلي للدور االرضي‬
DRG.NO:
SD-BU-3B-TT-101-A
DRAWN BY:
BM
CHKED.BY: YASSER
1
2
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
16
‫ممثـــل المتعھـــد‬
4962
1143
4994
1930
2014
2132
250
4978
3800
3143
3799
5003
250
2108
1987
1955
4969
1168
: ‫ختـــم‬
4962
: ‫توقيــع‬
I
2612
SUB CONTRCTOR
BALCONY
H.1
BALCONY
TOILET
H
TOILET
DIWANIYA/
BEDROOM 3
DIWANIYA/
BEDROOM 4
MASTER
BEDROOM
MASTER
BEDROOM
2A
1B
3B
1B
2B
CL-1
2A
1B
2A
1B
1B
2A
1B
1B
2A
6
CL-1
1B
3A
2A
CL-1
2B
TOILET
2
3B
1B
5100
1B
2B
1B
3
1B
2B
LIVING ROOM
DINING ROOM
CL-1
KEY PLAN
LIVING ROOM
1
1B
2B
1B
3A
3A
3A
1B
1B
5
3B
CL-1
CL-1
3B
2B
3A
0
2A
1B
3A
CL-9
1B
2A
1A
2A
1B
2A
3A
1B
CL-1
3B
BEDROOM 2
1B
3A
2A
1B
2A
1B
4
TOILET
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
CL-7
2A
1B
1A
PD.
G
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
BEDROOM 2
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
4910
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
IC
1A
DINING ROOM
FOYER
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
TOILET
TOILET
MAID'S TOILET
IC
KITCHEN
CORRIDOR
MAID'S ROOM
LEGEND AND ABBREVIATIONS
PD
SYMBOLS
TELECOM DRAW BOX
(450X450X150mm)
F
?
UPVC PIPES
KITCHEN
2014
INTERCOM DRAW BOX
(200X200X100mm)
RET
BEDROOM 3
REQUEST TO EXIT SWITCH
DISTRIBUTION POINT BOX (DP) 400 PAIR CAT6 TERMINALS
(SIZE-800X1000X150mm)
E
IC
SD-BU-3B-TT-102-A
CORRIDOR
ONT
ONT
2
? ?
DOOR ENTRANCE UNIT AUDIO STATION WITH TRADITIONAL PANEL
@ 1250mm FROM FFL
IDS
?
??
DESCRIPTION
??
?
MAID'S ROOM
INTERCOM STATION @ 1250mm FROM FFL
MARKER PLATE ON BOUNDARY WALL10cmX10cm (V2A STEEL)
MAID'S TOILET
TERMINAL BOX (TB) (TB.1B.GF.01) (SIZE-300mmX400mmX150mm)
5043
D.1
TELECOM OUTLET @ 450mm FROM FFL
TEL. ROOM
DOOR BELL
MAID'S TOILET MAID'S ROOM
240V,50HZ,1PHASE AC SUPPLY FOR ONT
GARBAGE
IC
KITCHEN
FOYER
D
ELEC.
MAID'S ROOM
TOILET
MAID'S TOILET
COORDINATION CERTIFICATION
TOILET
TRADE
4000
TOILET
BELL PUSH
300mm CABLE TRAY RISE
UP TO LEVEL-7
PD.
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
DINING
TOILET
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
FOYER
C
?
SR. STURUCTURAL
PLAUMBING
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
IC
MASTER BED
ROOM
KITCHEN
PD.
DATE
FAWAZ
FIRE FIGHTING
BEDROOM 2
LIVING
SIGN
ELEVATOR
OTIS
2502
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫اسم‬
: ‫التوقيع‬
‫تاريخ‬
A.1
‫تد قيـــق‬
BALCONY
BU-TT-101-‫ب‬
A
STATE OF KUWAIT
1
‫يعتمـــد‬
MASTER
BEDROOM
DIWANIYA/
BEDROOM 3
‫موافقة‬
B
DINING ROOM
‫اعتماد‬
BALCONY
LIVING ROOM
: ‫التوقيع‬
LIVING ROOM
: ‫اسم‬
TOILET
: ‫التوقيع‬
6118
BED ROOM
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
1st Floor_TELECOM
PUBLIC AUTHORITY FOR HOUSING WELFARE
9
SCALE - 1 : 100
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
10
REFER CONDUITS DETAILS IN
RESPECTIVE SCHEMATICS
TELECOM DRAWBOX
SIZE-450x450x150mm
SATELLITE MULTISWITCH
SIZE-600x1000x150mm
3
TEL. ROOM
SATELLITE MULTISWITCH
SIZE-600x1000x150mm
CLUSTER :
INTERCOM DRAWBOX
SIZE-200x200x100mm
TELECOM DRAWBOX
SIZE-450x450x150mm
SD-BU-3B-TT-102-A
300mm CABLE
TRAY
300mm CABLE TRAY
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
FIRST FLOOR PLAN
TELEPHONE & INTERCOM LAYOUT
INTERCOM DRAWBOX
SIZE-200x200x100mm
: ‫عنــــوان المخـــطط‬
‫مخطط االتصاالت التفصيلي للدور االول‬
2
1st FLOOR TELECOM ROOM
SD-BU-3B-TT-102-A
SCALE - 1 : 50
3
1st FLOOR TELECOM ROOM SECTION
SD-BU-3B-TT-102-A
SCALE - 1 : 50
DRG.NO:
SD-BU-3B-TT-102-A
DRAWN BY:
BM
CHKED.BY: YASSER
1
2
4962
3
4
1143
4994
5
1930
6
7
2014
2132
8
8.1
250
4978
8.2
8.3
3800
8.4
3143
9
3799
10
5003
250
11
12
2108
1987
13
14
1955
4969
15
1168
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
16
4962
‫ممثـــل المتعھـــد‬
I
2612
: ‫ختـــم‬
H.1
DISTRIBUTION POINT BOX (DP)
500 PAIR CAT6 TERMINALS
(SIZE-1200X1000X150mm)
AT LEVEL-4
?
TOILET
H
DIWANIYA/
BEDROOM 3
MASTER
BEDROOM
: ‫توقيــع‬
BALCONY
BALCONY
TOILET
DIWANIYA/
BEDROOM 4
SUB CONTRCTOR
MASTER
BEDROOM
LIVING ROOM
LIVING ROOM
5100
DINING ROOM
TOILET
BED ROOM
1B
2A
1B
2B
CL-1
2A
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
DIWANIYA
PD.
1B
BEDROOM 2
TOILET
2B
3A
2A
0
G
3B
LIVING
2B
1B
3
2B
1B
CL-1
KEY PLAN
MASTER BED
ROOM
1B
3A
CL-9
1B
BEDROOM 2
3A
2A
1B
2A
1B
3A
2A
1B
2A
1B
4
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
2A
1A
1B
CL-1
IC
3B
CLOSET
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
CL-7
2A
1B
1A
TOILET
FOYER
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
1A
3B
3A
1B
DINING ROOM
DINING
CL-5
1B
2A
3B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
4910
TOILET
MAID'S TOILET
TOILET
MAID'S ROOM
FOYER
PD TOILET
CORRIDOR
KITCHEN
2014
SYMBOLS
MAID'S ROOM
BEDROOM 3
MAID'S TOILET
E
? ?
??
IDS
TERMINAL BOX (TB)
TB.3B.L4.01
(SIZE-300mmX400mmX150mm) AT LEVEL-4
2
SD-BU-3B-TT-103-A
?
D
REQUEST TO EXIT SWITCH
IC
ONT
INTERCOM STATION @ 1250mm FROM FFL
ONT
MARKER PLATE ON BOUNDARY WALL10cmX10cm (V2A STEEL)
ELEC.
300mm CABLE TRAY RISE UP TO
LEVEL-7
PD.
FOYER
ONT
MAID'S TOILET
TEL. ROOM
GARBAGE
IC
BEDROOM 3
MAID'S ROOM
D.1
5043
MAID'S TOILET MAID'S ROOM
DOOR ENTRANCE UNIT AUDIO STATION WITH TRADITIONAL PANEL
@ 1250mm FROM FFL
DISTRIBUTION POINT BOX (DP) 400 PAIR CAT6 TERMINALS
(SIZE-800X1000X150mm)
CORRIDOR
ONT AT LEVEL-4
KITCHEN
RET
??
? ?
DESCRIPTION
UPVC PIPES
IC
KITCHEN
MAID'S ROOM
1A
LEGEND AND ABBREVIATIONS
?
CLOSET
MAID'S TOILET
2B
3B
PD
240V, 50HZ,
1 PHASE AC SUPPLY FOR ONT
?
F
1A
1A
1A
IC
KITCHEN
1A
TOILET
TOILET
CL-1
2A
3A
TERMINAL BOX (TB) (TB.1B.GF.01) (SIZE-300mmX400mmX150mm)
TELECOM DRAW BOX
(450X450X100mm)
TELECOM OUTLET @ 450mm FROM FFL
DOOR BELL
KITCHEN
240V,50HZ,1PHASE AC SUPPLY FOR ONT
BELL PUSH
INTERCOM DRAW BOX
(200X200X100mm)
DINING
TOILET
FOYER
TRADE
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
IC
?
?
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. STURUCTURAL
PLAUMBING
PD.
BEDROOM 2
LIVING
BED ROOM
ELEVATOR
DINING ROOM
DIWANIYA/
BEDROOM 4
B
MASTER
BEDROOM
BALCONY
‫يعتمـــد‬
A.1
BALCONY
A
‫موافقة‬
‫اعتماد‬
2502
TOILET
MASTER
BEDROOM
DIWANIYA/
BEDROOM 3
BALCONY
: ‫اسم‬
BALCONY
DATE
OTIS
: ‫اسم‬
LIVING ROOM
LIVING ROOM
‫تد قيـــق‬
6118
LIVING ROOM
SIGN
FAWAZ
FIRE FIGHTING
TOILET
: ‫التوقيع‬
TOILET
NASHWA AL-SAYED
: ‫اسم‬
BEDROOM 2
COMPANY
SR. ARCHITECT
CLOSET
MASTER BED
ROOM
NAME
: ‫التوقيع‬
C
COORDINATION CERTIFICATION
KITCHEN
: ‫اسم‬
DINING ROOM
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
TOILET
‫تاريخ‬
TOILET
MAID'S TOILET
: ‫التوقيع‬
4000
IC
PD
MAID'S ROOM
: ‫التوقيع‬
TOILET
TOILET
: ‫رقم المخطط التعاقدي‬
BU-TT-102-‫ب‬
STATE OF KUWAIT
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
9
10
5th Floor
+18.100 m
300mm CABLE TRAY
TERMINAL BOX
SIZE-300x400x150mm
REFER CONDUITS DETAILS
IN RESPECTIVE SCHEMATICS
TELECOM DRAWBOX
SIZE-450x450x150mm
ONT
1800
INTERCOM DRAWBOX
SIZE-200x200x100mm
TELECOM DRAWBOX
SIZE-450x450x150mm
TEL. ROOM
SATELLITE MULTISWITCH
SIZE-600x1000x150mm
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
TERMINAL BOX
SIZE-300x400x150mm
(AT LEVEL-4 ONLY)
CLUSTER :
SATELLITE MULTISWITCH
SIZE-600x1000x150mm
PROTOYPE :
DRAWING TITLE :
INTERCOM DRAWBOX
SIZE-200x200x100mm
4th Floor
+14.700 m
D.1
DISTRIBUTION POINT AT LEVEL-4
SIZE-1200x1000x150mm
CL-5, CL-6, CL-12, CL-13
3B
TYPICAL FLOOR PLAN
TELEPHONE & INTERCOM LAYOUT
DISTRIBUTION POINT AT LEVEL-4
SIZE-1200x1000x150mm
: ‫عنــــوان المخـــطط‬
‫مخطط االتصاالت التفصيلي المتكرر‬
2
4th FLOOR TELECOM ROOM
SD-BU-3B-TT-103-A
SCALE - 1 : 50
3
4th FLOOR TELECOM ROOM SECTION
SCALE - 1 : 50
DRG.NO:
SD-BU-3B-TT-103-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
1
2
3
4
5
6
7
8
8.1
8.2
8.3
8.4
9
10
11
12
13
14
15
16
1B
2B
1B
3
2B
1B
CL-1
KEY PLAN
2A
1B
3B
1B
2B
CL-1
2A
1B
3A
3A
1B
1B
5
3B
CL-1
CL-1
3B
1
4962
CL-1
1168
2B
4969
1B
1955
3A
1987
1B
2108
2A
250
1B
5003
1B
3799
2A
3143
1B
2A
3800
1B
4978
6
250
1B
2132
3A
2014
2A
1930
CL-1
4994
2B
1143
2
3B
1B
4962
2B
3A
0
2A
1B
3A
CL-9
1B
2A
1A
2A
1B
2A
3A
1B
CL-1
3B
1B
3A
1B
2A
4
2A
1B
I
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
2612
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
BALCONY
H.1
BALCONY
H
3A
CL-1
2A
1A
1A
1A
1A
2B
1A
TOILET
DIWANIYA/
BEDROOM 4
MASTER
BEDROOM
LEGEND AND ABBREVIATIONS
SYMBOLS
LIVING ROOM
5100
DINING ROOM
DOOR ENTRANCE UNIT AUDIO STATION WITH TRADITIONAL PANEL
@ 1250mm FROM FFL
IDS
RET
BEDROOM 2
TOILET
REQUEST TO EXIT SWITCH
DISTRIBUTION POINT BOX (DP) 400 PAIR CAT6 TERMINALS
(SIZE-800X1000X150mm)
PD.
4910
IC
?
IC
ONT
ONT
?
BEDROOM 2
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
INTERCOM STATION @ 1250mm FROM FFL
MARKER PLATE ON BOUNDARY WALL10cmX10cm (V2A STEEL)
FOYER
CAT 6 CABLE IN
25mm∅ UPVC CONDUIT(TYP)
TERMINAL BOX (TB) (TB.1B.GF.01) (SIZE-300mmX400mmX150mm)
TELECOM OUTLET @ 450mm FROM FFL
TOILET
DOOR BELL
IC
KITCHEN
MAID'S TOILET
240V,50HZ,1PHASE AC SUPPLY FOR ONT
PD
MAID'S ROOM
DESCRIPTION
UPVC PIPES
LIVING ROOM
TOILET
TOILET
CL-2
1A
3B
MASTER
BEDROOM
G
1B
3A
DIWANIYA/
BEDROOM 3
TOILET
2B
2B
1A
CORRIDOR
?
F
BELL PUSH
KITCHEN
2014
?
BEDROOM 3
TELECOM DRAW BOX
(450X450X150mm)
E
COORDINATION CERTIFICATION
TRADE
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
?
CORRIDOR
?
?
5043
INTERCOM DRAW BOX
(200X200X100mm)
MAID'S ROOM
SR. STURUCTURAL
PLAUMBING
MAID'S TOILET
D.1
TEL. ROOM
MAID'S TOILET MAID'S ROOM
IC
GARBAGE
TOILET
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
‫يعتمـــد‬
4000
TOILET
OTIS
PD.
: ‫التوقيع‬
D
ELEVATOR
300mm CABLE TRAY
: ‫اسم‬
FOYER
ELEC.
DATE
FAWAZ
FIRE FIGHTING
KITCHEN
SIGN
: ‫التوقيع‬
? STAIR
NAME
‫تد قيـــق‬
‫موافقة‬
C
?
MASTER BED
ROOM
BU-TT-103-‫ب‬
LIVING
BED ROOM
6118
STATE OF KUWAIT
‫تاريخ‬
DINING
‫اعتماد‬
TOILET
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
BALCONY
PUBLIC AUTHORITY FOR HOUSING WELFARE
2502
B
A.1
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
A
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
LEVEL 7 FLOOR PLAN
TELEPHONE & INTERCOM LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط االتصاالت التفصيلي للدور السابع‬
DRG.NO:
SD-BU-3B-TT-104-A
DRAWN BY:
BM
CHKED.BY: YASSER
LEGEND
ROOF
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
CAT6 CABLE IN
25mm DIA UPVC CONDUIT
200X200X100mm DRAWBOX
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
INTERCOM STATION
@1250mm FROM FFL
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
INTERCOM DRAW BOX
SIZE - 200x200x100MM
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
PSU
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
SUB CONTRCTOR
1 NOS CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
LEVEL-7
: ‫توقيــع‬
POWER SUPPLY UNIT
DOOR BELL
PUSH BUTTON
DOOR BELL
RTE
CL-1
KEY PLAN
3
1B
2A
1B
1B
2B
CL-1
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2B
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
1B
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
3B
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
1B
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2B
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
REQUEST TO EXIT
2A
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
2B
3A
2A
0
INTERCOM DRAW BOX
SIZE - 200x200x100MM
1B
3A
CL-9
1B
1B
2A
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1B
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2A
1B
3A
2A
4
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
3A
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2A
1B
1B
CL-1
LEVEL-6
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
3B
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2A
1A
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
1A
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
INTERCOM DRAW BOX
SIZE - 200x200x100MM
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
3 NOS CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
LEVEL-5
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
INTERCOM DRAW BOX
SIZE - 200x200x100MM
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
4 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
LEVEL-4
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
COORDINATION CERTIFICATION
TRADE
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
SR. STURUCTURAL
PLAUMBING
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
SIGN
DATE
FAWAZ
FIRE FIGHTING
ELEVATOR
OTIS
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
BU-TT-601-‫ب‬
INTERCOM DRAW BOX
SIZE - 200x200x100MM
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
6 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
LEVEL-2
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
STATE OF KUWAIT
‫يعتمـــد‬
‫تاريخ‬
‫موافقة‬
: ‫اسم‬
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
: ‫التوقيع‬
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
: ‫اسم‬
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
‫اعتماد‬
LEVEL-3
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
‫تد قيـــق‬
5 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
: ‫اسم‬
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
: ‫التوقيع‬
INTERCOM DRAW BOX
SIZE - 200x200x100MM
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
INTERCOM DRAW BOX
SIZE - 200x200x100MM
7 NOS CAT6 CABLES IN
3x25mm∅ UPVC CONDUIT
LEVEL-1
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
PSU
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
2 NOS CAT6 CABLES IN
2x25mm∅ UPVC CONDUIT
DOOR ENTRANCE UNIT
AUDIO STATION WITH TRADITIONAL PANEL
@ 1250mm FROM FFL
AUTOMATIC
DOOR
RELEASE
RTE
LOCATED AT ENTRANCE
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
GUARD ROOM
240V, 50Hz ,
1 PHASE AC SUPPLY
1 NO CAT6 CABLES IN
1x25mm∅ UPVC CONDUIT
INTERCOM SYSTEM RISER DIAGRAM BUILDING TYPE-3B
: ‫عنــــوان المخـــطط‬
‫مخطط االنتركم التفصيلي‬
DRG.NO:
SD-BU-3B-TT-105-A
GROUND FLOOR
DRAWN BY:
BM
CHKED.BY: YASSER
ROOF
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
11XCAT6 CABLE IN
4X25mm DIA UPVC CONDUIT
5XCAT6 CABLE IN
2X25mm DIA UPVC CONDUIT
: ‫ختـــم‬
16 Nos. CAT6 CABLES
IN 300X50mm CABLE TRAY
LEVEL-7
: ‫توقيــع‬
SUB CONTRCTOR
1B
2B
1B
3
2B
1B
CL-1
KEY PLAN
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
2A
1B
3B
1B
2B
CL-1
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
2B
3A
2A
0
LEVEL-6
2A
48 Nos. CAT6 CABLES
IN 300X50mm CABLE TRAY
1B
3A
CL-9
1B
2A
1B
2A
3A
1B
CL-1
3B
2A
1A
1B
3A
1B
2A
1B
4
2A
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1A
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
80 Nos. CAT6 CABLES
IN 300X50mm CABLE TRAY
LEVEL-5
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
112 Nos. CAT6 CABLES
IN 300X50mm CABLE TRAY
TELECOM ROOM
DISTRIBUTION
POINT BOX (DP) - 600 PAIR
CAT6 TERMINALS
1200X1000X150mm
ONT
COORDINATION CERTIFICATION
TERMINAL BOX
(TB)
TB.3B.L4.01
300X400X150mm
240V, 50Hz ,
1 PHASE AC SUPPLY
TRADE
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
SR. STURUCTURAL
PLAUMBING
LEVEL-4
‫يعتمـــد‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫اسم‬
OTIS
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
ELEVATOR
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
DATE
FAWAZ
FIRE FIGHTING
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
SIGN
‫تد قيـــق‬
‫موافقة‬
‫اعتماد‬
LEVEL-3
‫تاريخ‬
32 Nos. CAT6 CABLES + FIBER CABLE
IN 300X50mm CABLE TRAY
: ‫رقم المخطط التعاقدي‬
BU-TT-602-‫ب‬
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
LEVEL-2
‫دولة الكويت‬
STATE OF KUWAIT
64 Nos. CAT6 CABLES + FIBER CABLE
IN 300X50mm CABLE TRAY
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
16XCAT6 CABLE IN
6X25mm DIA UPVC CONDUIT (TYPICAL)
5XCAT6 CABLE IN
2X25mm DIA UPVC CONDUIT
LEVEL-1
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
85 Nos. CAT6 CABLES + FIBER CABLE
IN 300X50mm CABLE TRAY
TELECOM ROOM
GUARD ROOM
MARKER PLATE ON BOUNDARY WALL
10cmX10cm (V2A STEEL)
ONT
END TO BE SEALED WITH
PLASTIC PLUGS
240V, 50Hz ,
1 PHASE AC SUPPLY
DISTANCE 50CM
GROUND FLOOR
OFFICE
ELEC. ROOM
CLUSTER :
RETAIL
DISTRIBUTION
POINT BOX (DP) - 500 PAIR
CAT6 TERMINALS
1000X1000X150mm
PROTOYPE :
7XCAT6 CABLE IN
5X25mm DIA UPVC CONDUIT
16mm² Cu/PVC WIRE
E.3B.07
TELEPHONE RISER DIAGRAM BUILDING TYPE-3B
: ‫عنــــوان المخـــطط‬
‫مخطط التليفون التفصيلي‬
DRG.NO:
50mm DIA UPVC PIPE
FOR MOC CABLE INTAKE
FIBER CABLE IN
50mm DIA UPVC PIPE
TELEPHONE RISER DIAGRAM
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
TERMINAL BOX
(TB)
TB.3B.GF.01
300X400X150mm
1No. 50mm UPVC
PIPE TO NEAREST
MOC HANDHOLE
TELECOM
ROOM
SD-BU-3B-TT-106-A
DRAWN BY:
BM
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
1
2
4962
3
1143
4
4994
5
1930
6
2014
7
2132
8
250
8.1
4978
8.2
3800
8.3
3143
8.4
3799
9
10
5003
250
11
2108
12
1987
13
1955
14
4969
15
1168
16
4962
1B
2B
1B
3
1B
2B
2A
1B
3B
1B
2B
CL-1
2A
3B
1B
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
CL-1
3B
1B
5
2B
3A
0
2A
1B
H.1
3A
CL-9
1B
2612
3B
1
1B
3A
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
I
CL-1
KEY PLAN
2A
1B
2A
3A
1B
CL-1
3B
2A
1A
1B
3A
1B
2A
1B
4
2A
7
CL-1
2A
1B
1A
CL-8
2A
1B
1A
2B
3A
1B
1A
H
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1A
5100
LT ROOM
LEGEND AND ABBREVIATIONS
SYMBOLS
DESCRIPTION
UPVC CONDUIT
G
TELEVISION OUTLET
TV
SATELLITE MULTISWITCH IN DRAW BOX WITH AMPLIFIER
4910
240V,50HZ,1PHASE AC SUPPLY
STORAGE
WATER TANK
ROOM
TRANSFORMER
ROOM
2014
F
25mm SLEEVE FROM 1F
TOILET
E
COORDINATION CERTIFICATION
25mm SLEEVE FROM 1F LOBBY
STAIR
5043
STAIR
GARBAGE
CHUTE
GUARDS
QUARTER
TRADE
D.1
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
SR. STURUCTURAL
PLAUMBING
TOILET
D
NAME
TV
C
‫تد قيـــق‬
‫موافقة‬
‫اعتماد‬
6118
BU-TV-100-‫ب‬
STATE OF KUWAIT
B
2502
‫تاريخ‬
TV
TELECOM
A
‫يعتمـــد‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
OTIS
: ‫اسم‬
ELECTRICAL
ROOM
: ‫التوقيع‬
RETAIL
: ‫اسم‬
4000
ELEVATOR
OFFICE
DATE
FAWAZ
FIRE FIGHTING
LOBBY
SIGN
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
A.1
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
GROUND FLOOR PLAN
TELEVISION LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط التلفزيون التفصيلي للدور االرضي‬
DRG.NO:
SD-BU-3B-TV-101-A
DRAWN BY:
Author
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
1
2
4
1143
5
4994
1930
6
7
2014
2132
8
8.1
250
4978
8.2
8.3
3800
8.4
3143
9
3799
10
5003
250
11
12
2108
1987
13
14
1955
4969
15
16
1168
KEY PLAN
4962
1B
2B
1B
3
2B
1B
CL-1
4962
3
2A
1B
3B
1B
2B
CL-1
2A
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
3B
1B
2B
3A
2A
0
I
1B
3A
1B
TV
CL-7
2A
1B
2B
1B
1B
CL-5
1B
2A
3B
1A
TOILET
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
1B
2A
1B
2A
LIVING ROOM
TOILET
BEDROOM 2
LEGEND AND ABBREVIATIONS
FOYER
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
TELEVISION OUTLET
TV
DINING ROOM
TV
DESCRIPTION
UPVC CONDUIT
TV
UNDER FINISH
FLOOR
SATELLITE MULTISWITCH IN DRAW BOX WITH AMPLIFIER
TOILET
PD
240V,50HZ,1PHASE AC SUPPLY
TV
RG6 CABLE IN 25mm
KITCHEN
UPVC CONDUIT (TYP)
ABOVE CEILING
?
F
2014
1A
2B
1A
MASTER
BEDROOM
CLOSET
MAID'S ROOM
CL-1
2A
1A
3B
SYMBOLS
KITCHEN
CL-2
1A
1A
1A
TV TV
TV
DIWANIYA/
BEDROOM 4
BEDROOM 2
TV
1B
3A
TV
TV TV
LIVING ROOM
2B
2B
3A
RG6 CABLE IN 25mmø
UPVC CONDUIT (TYP)
CORRIDOR
BEDROOM 3
E
COORDINATION CERTIFICATION
TV
MAID'S TOILET MAID'S ROOM
FAWAZ
OTIS
BEDROOM 2
TV TV
BU-TV-101-‫ب‬
TV TV
TV
TV
6118
TOILET
LIVING ROOM
LIVING ROOM
MASTER
BEDROOM
DIWANIYA/
BEDROOM 3
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
TV
TV
2502
: ‫رقم المخطط التعاقدي‬
DINING ROOM
STATE OF KUWAIT
B
‫يعتمـــد‬
‫تاريخ‬
PD.
LIVING
BED ROOM
: ‫اسم‬
TOILET
UNDER FINISH
FLOOR
TV
?
GGC
RG6 CABLE IN 25mmø
UPVC CONDUIT (TYP)
C
MASTER BED
ROOM
YASSER ABDULLAH
DATE
TV
KITCHEN
FOYER
ELECTRICAL
ELEVATOR
TV
DINING
TOILET
MAID'S TOILET
GGC
SIGN
: ‫التوقيع‬
4000
MAID'S ROOM
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
AHEMD MOUSTAFA
‫تد قيـــق‬
TOILET
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
HVAC
‫اعتماد‬
TOILET
UBC
GGC
FIRE FIGHTING
SATELLITE MULTISWITCH IN
DRAW BOX WITH AMPLIFIER
SIZE-1000mm(H)600mm(W)150mm(D)
PD.
NIRMEEN HAAL
AHEMD NAGEEB
SR. STURUCTURAL
PLAUMBING
: ‫اسم‬
D
FOYER
TV
240V,50HZ,
1 PHASE AC SUPPLY
ELEC.
UBC
‫موافقة‬
5043
TEL. ROOM
GARBAGE
NASHWA AL-SAYED
SR. ARCHITECT
MAID'S TOILET
D.1
KITCHEN
COMPANY
: ‫التوقيع‬
MAID'S ROOM
NAME
: ‫اسم‬
?
TRADE
: ‫التوقيع‬
??
: ‫اسم‬
CORRIDOR
: ‫التوقيع‬
? ?
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
??
A
CL-6
2A
1A
TV
5100
1B
1A
1A
PD.
4910
2A
1B
2B
3A
3A
TOILET
MAID'S TOILET
CL-8
2A
1A
3A
DINING ROOM
TOILET
1B
1A
2B
MASTER
BEDROOM
G
1B
H
2A
1A
BALCONY
TOILET
2A
1B
3A
2A
4
H.1
2A
1B
1B
CL-1
3B
2612
3A
CL-9
1B
BALCONY
2A
1A
7
CL-1
A.1
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
FIRST FLOOR PLAN
TELEVISION LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط التلفزيون التفصيلي الدور األول‬
DRG.NO:
SD-BU-3B-TV-102-A
DRAWN BY:
Author
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
1
2
4962
3
4
1143
5
4994
1930
6
7
2014
2132
8
8.1
250
4978
8.2
8.3
3800
8.4
3143
9
3799
10
5003
250
11
12
2108
1987
13
14
1955
4969
15
16
1168
4962
1B
2B
1B
3
1B
2B
2A
1B
3B
1B
2B
CL-1
2A
3B
1B
1B
1B
1B
2A
1B
1B
2A
6
3A
1B
CL-1
3B
1B
5
1B
3A
1B
TV
TV
TV
DIWANIYA/
BEDROOM 4
CL-7
2A
1B
2B
1B
1B
TV
BED ROOM
TELEVISION OUTLET
240V,50HZ,1PHASE AC SUPPLY
TOILET
PD
BEDROOM 3
MAID'S TOILET
? ?
TV
MAID'S ROOM
CORRIDOR
COORDINATION CERTIFICATION
TRADE
MAID'S TOILET
D.1
?
FOYER
‫يعتمـــد‬
TV
‫تاريخ‬
‫اعتماد‬
TV TV
TV
TV
BALCONY
TV
OTIS
BEDROOM 2
TV TV
TV TV
FAWAZ
LIVING ROOM
BU-TV-102-‫ب‬
DINING ROOM
LIVING ROOM
BALCONY
TV
BALCONY
GGC
ELEVATOR
TOILET
TV
PD.
6118
B
YASSER ABDULLAH
DATE
UNDER FINISH
FLOOR
TOILET
DIWANIYA/
BEDROOM 4
ELECTRICAL
FIRE FIGHTING
LIVING
BED ROOM
GGC
SIGN
RG6 CABLE IN 25mmø
UPVC CONDUIT (TYP)
?
LIVING ROOM
MAID'S TOILET
KITCHEN
TV
TOILET
AHEMD MOUSTAFA
TV
DINING
?
HVAC
‫تد قيـــق‬
TOILET
MAID'S ROOM
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
UBC
GGC
: ‫التوقيع‬
TOILET
NIRMEEN HAAL
AHEMD NAGEEB
‫موافقة‬
TOILET
UBC
BALCONY
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
STATE OF KUWAIT
MASTER
BEDROOM
DIWANIYA/
BEDROOM 3
TV
4000
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
240V,50HZ,
1 PHASE AC SUPPLY
SATELLITE MULTISWITCH IN
DRAW BOX WITH AMPLIFIER
SIZE-1000mm(H)600mm(W)150mm(D)
ELEC.
PD.
NASHWA AL-SAYED
SR. ARCHITECT
: ‫اسم‬
FOYER
COMPANY
SR. STURUCTURAL
PLAUMBING
GARBAGE
TV
NAME
: ‫اسم‬
??
: ‫التوقيع‬
MAID'S ROOM
: ‫اسم‬
2014
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
: ‫التوقيع‬
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
TV
KITCHEN
TV
KITCHEN
BEDROOM 2
DESCRIPTION
SATELLITE MULTISWITCH IN DRAW BOX WITH AMPLIFIER
MAID'S TOILET MAID'S ROOM
MASTER BED
ROOM
1A
2B
1A
LEGEND AND ABBREVIATIONS
TEL. ROOM
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
CL-1
2A
1A
UPVC CONDUIT
TV
TOILET
CL-2
3B
TV
FOYER
? ?
PD
2B
1A
1A
1A
: ‫اسم‬
PD TOILET
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
TV
1B
3A
SYMBOLS
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
TOILET
KITCHEN
KITCHEN
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
1B
2B
3A
DIWANIYA
CLOSET
MAID'S ROOM
1B
TOILET
F
??
CL-3
1A
2A
BEDROOM 2
TOILET
E
CL-4
2A
LIVING ROOM
TOILET
DINING
1B
1A
FOYER
MAID'S ROOM
3A
2A
3A
: ‫التوقيع‬
MAID'S TOILET
3B
MASTER
BEDROOM
MASTER BED
ROOM
TV
TV TV
TOILET
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
CL-5
1B
2A
1A
2B
TV
KITCHEN
CL-6
2A
1A
CORRIDOR
TV
1B
1A
3B
TV TV
TV
TV
TV TV
5100
4910
1B
2B
3A
2B
?
TV
5043
2A
1B
4
CL-8
2A
1A
1B
TV
MASTER
BEDROOM
3A
BALCONY
UNDER FINISH
FLOOR
TOILET
1B
CL-1
LIVING ROOM
RG6 CABLE IN 25mmø
UPVC CONDUIT (TYP)
D
1B
1A
3B
?
BEDROOM 3
2A
1B
2A
2A
1A
BEDROOM 2
MAID'S TOILET
2A
1B
3A
3A
PD.
TOILET
2A
1A
7
CL-1
1A
LIVING
G
3B
TOILET
TOILET
DINING ROOM
C
CL-9
1B
BALCONY
?
MASTER
BEDROOM
2502
3A
0
2A
2612
2B
H.1
H
A
3B
1
1B
3A
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
I
CL-1
KEY PLAN
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
A.1
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
TYPICAL FLOOR PLAN
TELEVISION LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط التلفزيون التفصيلي المتكرر‬
DRG.NO:
SD-BU-3B-TV-103-A
DRAWN BY:
Author
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
1
2
4962
3
4
1143
5
4994
1930
6
7
2014
2132
8
8.1
250
4978
8.2
8.3
3800
8.4
3143
9
3799
10
5003
250
11
12
2108
1987
13
14
1955
4969
15
16
1168
4962
1B
2B
1B
3
2B
1B
CL-1
KEY PLAN
I
2A
1B
3B
1B
2B
CL-1
2A
1B
1B
TOILET
3A
2A
1B
2A
3A
1B
CL-1
3B
2A
1A
1B
3A
1B
2A
1B
4
2A
7
CL-1
DIWANIYA/
BEDROOM 4
CL-9
1B
TV
3A
0
2A
TV
2B
TV
CL-1
3B
5
TV
1
1B
2B
1B
3A
3A
MASTER
BEDROOM
3B
1B
H
3A
TOILET
CL-1
H.1
BALCONY
DIWANIYA/
BEDROOM 3
CL-1
1B
2A
1B
1B
2A
6
2612
1B
1B
1B
3A
2A
CL-1
2B
2A
2
3B
1B
BALCONY
2A
1B
1A
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
MASTER
BEDROOM
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
LIVING ROOM
TV TV
5100
DINING ROOM
TV TV
3B
LIVING ROOM
TOILET
BEDROOM 2
TOILET
PD.
G
LEGEND AND ABBREVIATIONS
BEDROOM 2
SYMBOLS
CLOSET
?
4910
UNDER FINISH FLOOR
TV
TV
TOILET
FOYER
MAID'S TOILET
MAID'S ROOM
KITCHEN
CORRIDOR
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
TELEVISION OUTLET
TV
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
TV OUTLET
(WEATHER PROOF)
DESCRIPTION
UPVC CONDUIT
TV
DINING ROOM
TV
RG6 CABLE IN 25mmø
UPVC CONDUIT (TYP)
1A
SATELLITE MULTISWITCH IN DRAW BOX WITH AMPLIFIER
TOILET
240V,50HZ,1PHASE AC SUPPLY
PD
TV
?
2014
F
RG6 CABLE IN 25mm
KITCHEN
UPVC CONDUIT (TYP)
ABOVE CEILING
BEDROOM 3
E
?
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)? ?
ABOVE CEILING
TV
CORRIDOR
?
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
ABOVE CEILING
5043
?
TEL. ROOM
MAID'S ROOM
COORDINATION CERTIFICATION
MAID'S TOILET
D.1
GARBAGE
FOYER
D
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
SATELLITE MULTISWITCH IN
DRAW BOX WITH AMPLIFIER
SIZE-1000mm(H)600mm(W)150mm(D)
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SIGN
DATE
FAWAZ
FIRE FIGHTING
TOILET
ELEVATOR
OTIS
‫يعتمـــد‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
RG6 CABLE IN 25mm
UPVC CONDUIT (TYP)
UNDER FINISH FLOOR
: ‫اسم‬
DINING
: ‫اسم‬
TOILET
: ‫التوقيع‬
4000
TOILET
COMPANY
SR. STURUCTURAL
PLAUMBING
240V,50HZ,
1 PHASE AC SUPPLY
ELEC.
ELEC.
PD.
NAME
SR. ARCHITECT
MAID'S TOILET MAID'S ROOM
KITCHEN
TRADE
TV
TV
C
?
MASTER BED
ROOM
6118
‫تد قيـــق‬
TV OUTLET
(WEATHER PROOF)
‫موافقة‬
BED ROOM
‫تاريخ‬
LIVING
‫اعتماد‬
TV OUTLET
(WEATHER PROOF)
BU-TV-103-‫ب‬
BALCONY
STATE OF KUWAIT
2502
B
A
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
A.1
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
LEVEL 7 FLOOR PLAN
TELEVISION LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط التلفزيون التفصيلي الدور السابع‬
DRG.NO:
SD-BU-3B-TV-104-A
DRAWN BY:
Author
CHKED.BY: YASSER
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
‫ممثـــل المتعھـــد‬
: ‫ختـــم‬
: ‫توقيــع‬
SUB CONTRCTOR
1
2
4962
3
1143
4
4994
5
1930
6
2014
7
2132
250
8
8.1
4978
8.2
3800
8.3
3143
8.4
3799
9
5003
10
250
11
2108
12
1987
13
1955
14
4969
15
1168
16
4962
1B
2B
1B
3
2B
1B
CL-1
KEY PLAN
I
2A
1B
3B
1B
2B
CL-1
2A
1B
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
2A
1B
1B
2A
6
2B
3A
2A
0
2612
1B
1B
3A
2A
CL-1
2B
2A
2
3B
1B
H.1
1B
3A
CL-9
1B
2A
1B
2A
3A
1B
CL-1
3B
1B
3A
2A
1B
2A
1B
4
H
2A
1A
7
CL-1
2A
1B
1A
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-6
2A
1A
CL-5
1B
2A
3B
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
CL-1
2A
3A
1A
1A
1A
1A
2B
1A
5100
3B
DISH -1 (NILESAT)
LEGEND AND ABBREVIATIONS
DISH -2 (BADRSAT)
G
SYMBOLS
DISH -3 (HOTBIRD)
DESCRIPTION
UPVC CONDUIT
TELEVISION OUTLET
4910
TV
SATELLITE MULTISWITCH IN DRAW BOX WITH AMPLIFIER
VHF DVB-T
ANTENNA
240V,50HZ,1PHASE AC SUPPLY
4Nos. RG6 CABLE IN 3*50mmDIA GI CONDUITS
2014
F
SATELLITE DRAW BOX
(300x300x150mm)
E
CORRIDOR
COORDINATION CERTIFICATION
5043
D.1
PUMP ROOM
TRADE
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
SR. STURUCTURAL
PLAUMBING
D
SIGN
DATE
FAWAZ
FIRE FIGHTING
OTIS
‫يعتمـــد‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
: ‫التوقيع‬
: ‫اسم‬
4000
ELEVATOR
‫تاريخ‬
6118
‫تد قيـــق‬
‫موافقة‬
‫اعتماد‬
C
: ‫رقم المخطط التعاقدي‬
BU-TT-104-‫ب‬
STATE OF KUWAIT
2502
B
A
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
A.1
PUBLIC AUTHORITY FOR HOUSING WELFARE
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
CLUSTER :
PROTOYPE :
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
ROOF PLAN
TELEVISION LAYOUT
: ‫عنــــوان المخـــطط‬
‫مخطط التلفزيون التفصيلي السطح‬
DRG.NO:
SD-BU-3B-TV-105-A
DRAWN BY:
Author
CHKED.BY: YASSER
NILESAT
BADRSAT
MAIN CONTRCTOR
‫المقـــاول الرئيســــي‬
2019/2018-1356
‫ ع‬/ ‫ س‬. ‫ ر‬. ‫ ع‬. ‫ م‬: ‫عقــد رقـــم‬
UHF DVB-T ANTENNA
HOTBIRD
LEGEND
4Nos RG6 CABLE
‫ممثـــل المتعھـــد‬
TV OUTLET @
450mm FROM FFL
TV
: ‫ختـــم‬
1No RG6 CABLE
: ‫توقيــع‬
2x50mm DIA UPVC CONDUIT
SUB CONTRCTOR
DRAW BOX
(SIZE-200mmX200mmX100mm)
ROOF
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
AMPLIFIER
TV
TV
240V, 50Hz ,
1 PHASE AC SUPPLY
TV
TV
TV
TV
TV
1B
2B
1B
3
2B
1B
CL-1
KEY PLAN
2A
1B
3B
1B
2B
CL-1
2A
3B
1B
1B
1B
1B
2A
1B
1B
2A
6
1B
3A
3B
1
1B
3A
1B
5
3B
CL-1
CL-1
2B
1B
3A
CL-1
1B
3A
2A
CL-1
2B
2A
2
SATELLITE
MULTISWITCH
IN DRAW BOX
2B
3A
2A
0
1000mm(H)600mm(W)150mm(D)
1B
3A
CL-9
1B
2A
1A
2A
1B
2A
3A
1B
CL-1
3B
1B
3A
2A
1B
2A
1B
4
LEVEL-07
7
CL-1
2A
1A
1B
CL-8
2A
1B
1A
2B
3A
1B
1A
CL-7
2A
1B
1A
2B
3A
1B
1B
CL-5
1B
2A
3B
13 NOS RG6 CABLE IN
2x50mm DIA UPVC CONDUIT (TYPICAL)
CL-6
2A
1A
1A
3B
3A
1B
2B
2A
1B
1A
CL-4
3B
CL-3
1A
3A
2B
1B
2A
1B
2A
2B
2B
1A
3A
1B
CL-2
1A
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
240V, 50Hz ,
1 PHASE AC SUPPLY
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
CL-1
2A
3A
1A
1A
1A
1A
2B
3B
1A
2Nos. SATELLITE
MULTISWITCH
IN DRAW BOX
1000mm(H)600mm(W)150mm(D)
LEVEL-06
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
AMPLIFIER
TV
240V, 50Hz ,
1 PHASE AC SUPPLYTV
2Nos. SATELLITE
MULTISWITCH
IN DRAW BOX
1000mm(H)600mm(W)150mm(D)
LEVEL-05
COORDINATION CERTIFICATION
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
240V, 50Hz ,
1 PHASE AC SUPPLY
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TRADE
NAME
COMPANY
NASHWA AL-SAYED
UBC
NIRMEEN HAAL
AHEMD NAGEEB
UBC
GGC
HVAC
AHEMD MOUSTAFA
GGC
ELECTRICAL
YASSER ABDULLAH
GGC
SR. ARCHITECT
SR. STURUCTURAL
PLAUMBING
2Nos. SATELLITE
MULTISWITCH
IN DRAW BOX
1000mm(H)600mm(W)150mm(D)
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
: ‫اسم‬
240V, 50Hz ,
1 PHASE AC SUPPLYTV
: ‫اسم‬
AMPLIFIER
TV
‫يعتمـــد‬
: ‫التوقيع‬
TV
: ‫التوقيع‬
TV
: ‫التوقيع‬
TV
TV
OTIS
: ‫اسم‬
TV
4 BED APARTMENT TV OUTLETS
: ‫اسم‬
3 BED APARTMENT TV OUTLETS
: ‫التوقيع‬
ELEVATOR
3 BED APARTMENT TV OUTLETS
DATE
FAWAZ
FIRE FIGHTING
LEVEL-04
SIGN
‫تاريخ‬
‫تد قيـــق‬
1000mm(H)600mm(W)150mm(D)
‫موافقة‬
‫اعتماد‬
2Nos. SATELLITE
MULTISWITCH
IN DRAW BOX
LEVEL-03
BU-TV-601-‫ب‬
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
240V, 50Hz ,
1 PHASE AC SUPPLY
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
STATE OF KUWAIT
2Nos. SATELLITE
MULTISWITCH
IN DRAW BOX
: ‫رقم المخطط التعاقدي‬
‫دولة الكويت‬
‫المـؤسســة العـامـة للـرعـايــة السكنيــة‬
PUBLIC AUTHORITY FOR HOUSING WELFARE
1000mm(H)600mm(W)150mm(D)
(720)‫( عماره من السكن العامودي‬40) ‫انشاء وانجازوصيانة عدد‬
‫شقة واعمال الخدمات الخاصة لجميع العمارات بالضاحية االستثمارية‬
LEVEL-02
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
AMPLIFIER
TV
240V, 50Hz ,
1 PHASE AC SUPPLY
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
CLUSTER :
SATELLITE
MULTISWITCH
IN DRAW BOX
PROTOYPE :
1000mm(H)600mm(W)150mm(D)
CL-5, CL-6, CL-12, CL-13
3B
DRAWING TITLE :
TELEVISION RISER DIAGRAM BUILDING TYPE-3B
LEVEL-01
RG6 CABLE IN 25mm
UPVC CONDUIT
(TYPICAL)
: ‫عنــــوان المخـــطط‬
RETAIL
OFFICE
TV
TV
TV
GUARD ROOM
TV
TV
‫مخطط التلفزيون التفصيلي‬
DRG.NO:
SD-BU-3B-TV-106-A
GROUND LEVEL
DRAWN BY:
BM
CHKED.BY: YASSER
Download